September 5, 2006 1 Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

M1 Installation Schedule Plans Burkhard Schmidt Muon Meeting
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Walls crates cables gas chambers electronics CERN adb.
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Muon Stations M2-M5 Hardware status Outline: Gas System status UF/PNPI HV-system status Remaining M2-M5 installation tasks – Air cooling system status.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
GROUPAMA Football Stadium, Budapest Design and other engineering work for the precast concrete structure Precast solution of the structure (splitting.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
V. Bobillier1 Cable installation status.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
Update on the M1 schedule Muon Meeting March 23, 2009 Burkhard Schmidt.
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
DCal-ALICE integration and installation plan and status A. Tauro.
21 January Summary: Updating of the activities carried out on-site (Done) in DEC + ½JAN List activities on going (Next steps) and scheduled till.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
21/11/2002 Muon MeetingBurkhard Schmidt Envelopes and Clearances Outline: Definitions General situation Request of Calorimeter group.
P. 1Mario Deile – TOTEMino: Status and Schedule Mario Deile Zone 2.Gas system 3.Cooling water 4.Cables 5.Safety 6.Schedule, Project Plan 7.Schedule.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
DT-LHCb coordination meeting 18 April 2016
Status of the MICE Construction Project
Equipment simplified model SMR UR safety
Francois and Lau EATM 17 July 2012
new straw end plug: D=10.6 mm straws support frame Levan option
LAPP BPM Read-out Electronics
Test beam organization, schedule, requirements and installation This is no talk rather a questionnaire! Installation to T9 Preliminary schedule What do.
News about the WA104 Programme
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
CMS Area Working Group Meeting
CE Status: Activities executed until 03/08 and ongoing
(Procurement, testing of magnets)
Mini-drawers, FE-ASIC , Integrator
Status of the AGATA installation at GANIL
G. Carboni for the Muon Group
Renovation of the 45-year old PS magnets
Preparations for test of
Technical Support Activities in PH-ADO-PO
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
LCLS Undulator System Status and Schedule
UPPSALA UNIVERSITY_GERSEMI PROJECT
East Hall under construction
Polarized 3He target installation
Presentation transcript:

September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam plug -M1 Comments on the Installation schedule (an updated schedule will be given in Heidelberg)

September 5, Burkhard Schmidt Integration: Suspended Platforms Status: All 4 suspended platforms have been approved by SC/GS. We gained experience in the dis/re-mounting of the nacelles, which can be done now for the 4 nacelles in about 2-3 days. A nacelles of ~8m length had been assembled to work on the back side of M5A. Tests have to be repeated after each installation and SC has to be informed. -> New users have to get the instructions for safe use of the platforms by me.

September 5, Burkhard Schmidt Integration: Cable Chains Status and plans: Cable chains for M2-M5 and M1 are needed. Two companies visited CERN in July/August to discuss details of the requirements with us. The Technical Specifications for the M2-M5 chains are being finalized now and the Price Enquiry is going out. The chains should be delivered/installed in November. M2-M5 chains: Although basic ideas for the M1 chains exist, much more work is required to finalize the Specifications.

September 5, Burkhard Schmidt Integration: Cable Chains Positioning of M2-M5 chains:

September 5, Burkhard Schmidt Integration: Beam Plugs Status: Although the plugs were delivered already in March 2006, more design and machining work was needed on the iron blocks and plates surrounding the beam plugs. The installation itself was very complicated and had top be done in iterations. -> Installation will be completed this week

September 5, Burkhard Schmidt Integration: M1 Situation: Work on M1 integration has been resumed in August -> support beams etc. have to be installed now. -> We are very late, despite frequent pleads for help Aspects of mechanical engineering are taken up now by Alessandro Saputi. His contribution to M2-M5 is nearly completed. Many aspects are still floating due to the lack of manpower: –cable chains (design, positioning) –cooling system (positioning) –Installation procedure (conflict with beam pipe installation etc.) -> In order to avoid a disaster, an integration/installation review should be organized in October. A person in charge should be nominated !

September 5, Burkhard Schmidt Muon System Installation schedule Version of :

September 5, Burkhard Schmidt Details of the new schedule

September 5, Burkhard Schmidt Muon System Installation Status Support panels A-side: Completed according to schedule. Traction systems rack structure: Delayed to very late delivery of the motor. Displacement of the structure without motor no problem (even preferential at this stage). Muon Station Alignment: The margin for the adjustment of M4 in z was insufficient to allow safe closing of the muon stations. Modifications on the fixation of M4 had to be carried out in August to allow closing of the C-side for work in the HCAL. This was possible due to strong contributions of collaborators from LNF and CERN. -> More details will be given in Heidelberg

September 5, Burkhard Schmidt Details of new schedule A-side M1

September 5, Burkhard Schmidt Muon System Installation Status Cabling: We are proceeding more or less according to schedule (we are about 1 week behind). Some problems with cable length and labels had to solved. We are finishing M5A this week. After some more preparation work next week we move to either M4A or M3C, depending on the availability of cables. The amount of cables increases significantly when going to M3/M2. This causes complications on the walls and in the rack structure. We have to avoid a mess ! ->The racks have to be prepared a.s.a.p. ! We get another PNPI technician and help from the CERN team for the cooling pipes in the racks. -> A supervisor from LNF has to be present from September 20

September 5, Burkhard Schmidt Muon System Installation Status Gas Piping: We had the usual difficulties in the startup. M5C has been finished by August 14, work is now going on on M5A (back), which has to be finished by September 15. We are about 2 weeks behind schedule, but the allocated time of 4 weeks/halfstation is ok, if 3 people are available for the work.

September 5, Burkhard Schmidt Details of new installation schedule Chamber installation is likely to start now early October. Much parallelism early 2007

September 5, Burkhard Schmidt Comments and conclusions Thanks to the strong contribution of those who worked in the pit or in the lab instead of enjoying the beach in July/August, we are following much better the schedule now than in spring and are only about 2 weeks behind. The new start date for chamber installation (October) depends on the availability of tools to test the chambers, mainly the connectivity. We have to increase the manpower for chamber testing/installation/commissioning to follow the schedule during the coming months.