MICE VC Alain Blondel, April 20 2004 1 MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE Funding Agencies Committee.
Support and Inclusion of students with disabilities at higher education institutions in Montenegro – Procedure for collecting valid documentations.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
1 Effect of staging on module connection and support arrangement Yury Ivanyushenkov RAL.
Designing and Implementing An Effective Schoolwide Program
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
MICE CM in New York Alain Blondel, June MICE COLLABORATION Columbia University June 2003 Action List (online) 1.Funding and some organization.
MICE CM at OSAKA Alain Blondel, August MICE collaboration meeting at OSAKA (thanks to Mike Zisman, Makoto Yoshida, and Koji Yoshimura)Mike ZismanMakoto.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Progress update on developing Health Sector Strategic Plan (HSSP IV) Joint Annual Health Sector Review Technical Review Meeting Wednesday 5 th.
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
1 Forces Yury Ivanyushenkov RAL. 2 Goal: find maximal (static and dynamical) possible forces in MICE magnetic system. Method: calculation of axial magnetic.
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
Copyright © 2014 by The University of Kansas Rating Community Goals: Appraising of Importance and Feasibility.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE VC116 Alain Blondel 18 December MICE NEWS See more details in Macolm’s MICE news!
MICE CM 29 Collaboration Board Summary. Agenda 1.Intro 2.Approval of minutesBooth/Bross 3.Spokeʼs remarks & EB reportBlondel 4.PM reportNichols 5.US magnet.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
SMART Goal Setting Health Fall The need for goals A goal is a conscious aim that requires planning and effort to achieve. A goal is a conscious.
MICE CMPB Alain Blondel 1 Highlights on MICE.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
MICE CM38 Alain Blondel CB report 1 Report from the MICE collaboration board.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
MICE CM41 – CB summary Alain Blondel 1 Collaboration Board at CM41 Summary Alain Blondel.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
CADET UNIT AND FLIGHT GOALS
Status of the MICE Construction Project
MICE CM31 Schedule summary
Board Standards and School Board Self-Assessment
MICE Project in the US: Completion of Efforts
UK Link Technology Refresh
Guidance notes for Project Manager
Performance Framework
Otis J. Brock, III Elementary School
ETS WG 6-7 September, 2006 Point 6: UOE quality report History
Rating Community Goals: Appraising of Importance and Feasibility
AICT5 – eProject Project Planning for ICT
Education and Training Statistics Working Group, May 2011
Otis J. Brock, III Elementary School
Database SIG APNIC19 24 February 2005, Kyoto, Japan
Groveton ES Our Local Level iv Journey
Budgeting Conversation
Presentation transcript:

MICE VC Alain Blondel, April MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of excellent work performed by all in the collaboration. The EB reflected on the orientations and aims of the MICE collaboration until the RAL collaboration meeting October I Technical document, cost estimate and Gateway 2 II Technical choices to be made III understand how to achieve 'measurement of emittance ratio to '

MICE VC Alain Blondel, April consolidation of the work done until March 2004 and GATEWAY 2 A. Finish the Technical Reference Document (‘rebaselining’). Paul Drumm sets end-of-april as a good goal for this. N.B. From there onwards we should use the change control procedures to suggest, design and implement improvements to the design of MICE. B. Finalize a more refined evaluation of cost estimates including two scenarios: a. what we think we could do right-now using solutions that are at hand. b. what we hope to be able to achieve with further work The aim being to be able to do better at lower cost, if possible. The line between categories a. and b. will evolve with time, normally this difference should shrink.

MICE VC Alain Blondel, April The goal is to achieve a realistically funded scenario allowing us to reach stage V of the development of MICE, in order to present ourselves with a solid case to the next step in the UK review process: GATEWAY 2. Step VI which allows much richer possibilities remains the ultimate goal but may have to be presented as an upgrade at a later stage. (in other words: as soon as we realize that we can reach step V we already have a highly worthwhile experiment and we should go to Gateway 2) The success of this process hinges to a large extent on the success of the funding proposals in the US and in Europe. USA : review foreseen end of May (when?) Italy : need meeting with head of INFN GATEWAY 2

MICE VC Alain Blondel, April  - STEP I: spring 2006 STEP II: summer 2006 STEP III: winter 2007 STEP IV: spring 2007 STEP V: fall 2007 STEP VI: 2008

MICE VC Alain Blondel, April Technical choices to be made. A certain number of technical choices need to be made following the progress that has been made up to the collaboration meeting (these so far enter in category 1.b. above) 2.a finalize decision on cryocoolers. 2.b finalize RF system design and costing. 2.c finalize validation of tracker. It is believed that these milestones can be achieved before or at the collaboration meeting in OSAKA in summer 2004 (2-4 August) for approval at the collaboration board at that time.

MICE VC Alain Blondel, April Understand the measurement of emittance ratio to This requires 3.a a full and operational simulation of the experiment 3.b design of monitoring systems that allow control of the physics parameters of the experiment to the desired accuracy. This programme of work is a major enterprise and will require collective focus until the end of October It is suggested to start from the table of quantities to be monitored and controlled (see the talks by Mary Anne and myself and the collaboration meeting). The proposed time table is as follows. -- for the meeting in OSAKA each working group should propose one or several ways by which the quantities can be conceptually controlled. -- for the RAL meeting a more detailed design should be proposed so as to include the controls in the final designs.

MICE VC Alain Blondel, April