Hazardous Energy Isolation (LOTO) Awareness Plus

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Lockout/Tagout Awareness Training
Lockout/Tagout Training: 29 CFR Lockout Tagout Standard
Lockout/Tagout/Verify Awareness
Lock Out/Tag Out Training Lock-Out/Tag-Out OSHA Definition. Lockout/Tagout (LOTO) refers to specific practices and procedures to safeguard employees.
LOCKOUT TAGOUT Introduction Each year nearly 150 people die because there was a failure to control energy.
Lockout/Tagout (Control of Hazardous Energy) Suzanne Reister/Paula Vanderpool North Central ESD /7110.
Control Of Hazardous Energy Steve Geiger, CSP Safety & Occupational Health Manager Naval Safety Center
LOCKOUT / TAGOUT How to Effectively & Efficiently Control Hazardous Energy LOTO Presentation – Worker, 9/2004.
Presented by Environmental Health and Safety
LOCKOUT/TAGOUT.
Isolation of Hazardous Energy Understanding the Requirement of Lockout Tagout 29 CFR
Lockout/Tagout (The Control of Hazardous Energy)
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Isolation “Imagine yourself performing maintenance inside of a machine and suddenly,
Lockout - Tagout Control of Hazardous Energy CFR
Lockout Tagout Tryout (LOTO). The purpose of the Lockout Tagout Program is to protect you. Rain for Rent incidents include employees being sprayed with.
Lockout/tagout Authorized employees
Lockout/Tagout Affected Employees. © Business & Legal Reports, Inc Session Objectives You will be able to: Recognize hazardous energy sources Carry.
Lockout/Tagout Authorized Employee Slide Show Notes
NWACC Business & Industry Workforce Development Institute J- 1 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) FOR GENERAL INDUSTRY.
Trindel Insurance Fund
/0309 Copyright ©2003 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Lockout/Tagout Refresher 29 CFR
Lockout/Tagout for Affected Employees Understand the Basics.
Lock-Out / Tag-Out Types of Energy Types of Energy Electrical Electrical Mechanical Mechanical Chemical Chemical Thermal Thermal Hydraulic Hydraulic.
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
Control Of Hazardous Energy
Lockout/Tagout Authorized Employees: Learn the Procedures.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
Lockout - Tagout Control of Hazardous Energy OSHA Standard
Lockout/Tagout.
Control of Hazardous Energy (Lockout/Tagout) 29 CFR
Copyright © 2012 American Safety Management Inc. Lockout Tagout.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
Lockout - Tagout Control of Hazardous Energy OSHA Standard
School Safety Training Control of Hazardous Energy (Lockout/Tagout) WAC
Control of Hazardous Energy 29 CFR Lockout/Tagout Basics? Regulatory requirements Energy Isolation Devices Energy Sources Affected, Authorized.
© BLR ® —Business & Legal Resources 1408 Lockout/Tagout Authorized Employee.
1 Lockout/Tagout MEETING THE STANDARD MEETING THE STANDARD.
1 Lockout/Tagout “The Control of Hazardous Energy” LOTO Lockout Tagout.
Striving For Safety Excellence HunterDouglas Corporate Environmental, Safety, Risk Management Lock Out Tag Out Affected Employees.
LOCK-OUT/TAGOUT SAFETY SAFELY MAINTAINING EQUIPMENT AND MACHINES.
Lockout/tagout for authorized employee
Lockout Tagout Program
Control Of Hazardous Energy Steve Geiger, CSP Safety & Occupational Health Manager Naval Safety Center
LOCKOUT/TAGOUT/VERIFY
Lock Out / Tag Out The Control of Hazardous Energy
The Control of Hazardous Energy (Lockout-Tagout)
Control Of Hazardous Energy Steve Geiger, CSP Safety & Occupational Health Manager Naval Safety Center
Lock Out & Tag Out.
Lockout/tagout Refresher training
Energy Control (Lockout/Tagout)
Energy Control Procedures Lockout/Tagout 29 CFR
Confined Spaces 29 CFR is the OSHA regulation
Chapter 9 Safety Permit Systems
Control Of Hazardous Energy Steve Geiger, CSP Safety & Occupational Health Manager Naval Safety Center
The Control of Hazardous Energy (Lockout-Tagout)
Lock Out Tag Out Michael Vangeli 11/15/2018.
Control Of Hazardous Energy Steve Geiger, CSP Safety & Occupational Health Manager Naval Safety Center
Control Of Hazardous Energy Steve Geiger, CSP Safety & Occupational Health Manager Naval Safety Center
Control Of Hazardous Energy Steve Geiger, CSP Safety & Occupational Health Manager Naval Safety Center
Control Of Hazardous Energy Steve Geiger, CSP Safety & Occupational Health Manager Naval Safety Center
Presented by Environmental Health and Safety
Lock Out Tag Out.
Lockout/tagout Refresher Training
Control Of Hazardous Energy Steve Geiger, CSP Safety & Occupational Health Manager Naval Safety Center
Control Of Hazardous Energy Steve Geiger, CSP Safety & Occupational Health Manager Naval Safety Center
LOCKOUT/TAGOUT By: Kory Hildebrand.
Control Of Hazardous Energy Steve Geiger, CSP Safety & Occupational Health Manager Naval Safety Center
Presentation transcript:

Hazardous Energy Isolation (LOTO) Awareness Plus

Lock-out / Tag-out (LO/TO) Purpose: To protect workers from the release of hazardous energy, and; To guard against the accidental start-up of equipment during service and maintenance.

Energy Sources Typical sources of energy that may need to be isolated, locked and tagged out include: Electrical (electric motors, batteries) Hydraulic (e.g. pressurized fluids in hoses/pipes) Pneumatic (e.g. pressurized air in hoses/pipes) Mechanical (e.g. gravity systems, or spring energy) Chemical (e.g. storage vessels or pipelines containing toxic/hazardous chemicals and hydrocarbon/petrol products) Thermal (e.g. hot oil lines used to heat heavy fuel oil tanks/pipe work) Pressurized Liquids/Gases (e.g. hydrocarbons/petrol, steam) NOTE: LO/TO applies to more than just electrical circuits!

Isolation vs. Lock Out/Tag Out Isolation of all hazardous energy or toxic/flammable substances into equipment to be worked on. Two types of isolation used are: Closed isolation block valves or opening of circuit breaker and installation of Locks & Tags Positive Isolation Installation of a Blind (spade) Removal of a block valve or pipe spool Removal of circuit Breaker

Isolation Requirements Only a Facility Manager or their delegates can authorize isolation work. During the planning and risk assessment phase the equipment to be worked on isolation requirements are to be determined. An Equipment Isolation Checklist is required to be completed whenever equipment with multiple isolation points is to be isolated for work. A General Work Permit is required for installation of any type of positive isolation. Equipment Isolation Checklist

Positive Physical Isolation Blinding (spading) is one method of positive physical isolation of equipment, lines and or vessels. Equipment, lines and vessels can also be positive isolated by removal of a valve or pipe spool and installing a blank flange (blanking) of the live side of the line. When should positive isolation (normally blinding is used) of equipment be considered? Whenever HOT WORK is to be performed on the equipment. Whenever a piece of equipment in any type of hazardous service is to be removed from the job site. Whenever a tank, vessel or other equipment is to be isolated for confined space entry. Blinding and Blanking of all piping into a piece of equipment to be worked on ensures there can be no energy transfer into the equipment from the connected piping

Basic LOTO Requirements LOTO is used to ensure equipment to be worked on can not be activated by locking out and tagging the equipment’s power source. For Electrical powered equipment its electrical breaker is to be opened, locked and tagged. Steam Turbine Drivers, etc shall have their steam inlet and outlet valves blocked and locks and tags installed. Note: The removal of a valve handle/electrical fuse, etc. does not constitute a proper lock out.

Basic LO/TO Requirements (cont’d) Lock Out and Tag Out should both be used, never use a tag alone Test the equipment to ensure zero energy state A six hole hasp shall be installed at the equipments primary isolation point The primary isolation point is to be listed 1st on the Equipment Isolation Point. Example: (Circuit Breaker of electrical motors) If an isolation point cannot be locked out another isolation point further back in the system should be identified and LOTO performed there. Only the maintenance person who fitted a lock and tag is authorized to remove it Testing a motor driven piece of equipment is done by bumping the start/stop switch to determine if motor is still energized. Whenever isolation block valve can not be locked out for some reason or if in the case of a block valve that is passing and it requires isolation at another point further back in the system personnel must ensure that any clean up of the equipment that is required done from the new point of isolation.

Basic LO/TO Requirements (cont’d) Locks (and tags) are normally to be installed in the following order: Operator Lock Electrician Lock Maintenance Lock Locks (and tags) are to be removed in the following order:

Locks Locks shall be used if it is feasible. (There are a number lock out accessories now available suitable for locking out older equipment not originally designed to take a lock) Where applicable a facility’s Operations’ group should have individually keyed and numbered lock sets. Each authorized employee/contractor required to perform LO/TO should be issued with their own lockout lock(s) and key(s). Lockout locks should only to be used for LO/TO purposes.

Locks One key per lock is ideal. If a second key is available, it should be under strict control. Only individual keyed locks are to be used, combination locks cannot be used. Locks that are used for Lock-out and Tag-out can not be used for any other purposes. A number of accessories are now available for locking out of equipment including those not originally designed to take a lock. Always use a six hold HASP to install the lock, and the last hole on the HASP to apply another HASP.

Locks (continued) The facilities Operations shall to be provided with a supply of locks and tags for operational LOTO purposed. The Facility’s Maintenance and or Contractor employee required to perform LOTO shall be issued with their own personnel lock. The LOTO keys of the facility’s Maintenance and or Contractors locks shall be retained by the lock’s owner. Operational LOTO lock’s keys are to be kept under the control of the responsible Operator for that shift.

Tags Used For LOTO LOTO Tags are generally to be utilised in tandem with locks. “Danger Do Not Operate” tags to be installed on any vents and or drains that are left open to atmosphere. Remember that tags only provide information and warnings to alert workers; IMPORTANT - TAGS DO NOT LOCK OUT AN ENERGY SOURCE!

Tags (cont’d) Tags shall provide warning to personnel not to energize the equipment. Tags should be of a suitably durable material for the work environment in which they are installed. Tag must securely fastened to prevent accidental removal using a sufficiently strong self-locking, non-reusable tie wrap.

Tags (cont’d) Design of Tags: Tags are to be standard across facility and different in design from other types of tags used for other purposes. Tags must be made of a suitable weather proof & when applicable heat resistant material. Tags should be written in a language understood by the workforce or may be bilingual. Tags should be filled out using a permanent marker. Must identify who put the tag, the date installed, the equipment isolated and the reason it is being isolated. Tags may be color coded to identify the discipline installing it. (e.g. Yellow Operations, blue Maintenance and red Electrical or Instrument Technicians)

Remember Locks and tags do not isolate energy sources – people do using the locks & tags. Do not rely on another person’s lock and/or tag – they may remove it without your knowledge, ensure your own lock and tag is installed on the six hole hasp. Maintenance or Contractor Locks and tags should only be removed by the person who installed them. LOTO is a control measure that is required as a part of the work permitting process – it should not be seen as superseding the need for a Work Permit.

LOTO – Additional Information For further information and or instructions for the lock-out & tag-out system please refer to: LOTO Bulletin Your companies general operating procedures/standards/guidelines covering LOTO Your company’s Safety Officer Typical Equipment Isolation Workflow