NRMCA PTO Fuel Use Test Procedure Guide. Before You Begin: Fill in Boxes 1- 11 of NRMCA’s PTO Data Sheet Be sure to include a detailed description of.

Slides:



Advertisements
Similar presentations
Vehicle tracking system
Advertisements

DOCKMEN TRAINING LINC LOGISTICS INSIGHTS CORPORATION.
Oklahoma Department of Environmental Quality October 23,
Card Order Basics. Card Order Basics What is It? –An advanced scheme for operating a model railroad –Allows for a realistic means of determining what.
TransportPortal TransportPortal is a software designed for Transporters in Tanzania and East Africa. It helps to manage all basic things of a transport.
What is GT MASTER WHAT IS GT MASTER? Thermoflow, Inc.
What is GT MASTER While GT PRO is the design program for combined cycles, GT MASTER is the corresponding simulation program for off-design calculations.
Federal Work-Study Program.  …For taking part in the Federal Work-Study Program.  It is an excellent opportunity for the student to gain experience.
State of Oregon, DAS Fleet Fuel Island Operations - Diesel.
IFTA / IRP Audit Process Mileage Audit
IVDR Individual Vehicle Distance Report
SAFETY MEETING Off Highway Trucks. Brakes There are four separate controls used for braking Service Brake Retarder Secondary Brake Parking Brake.
 A Purchase Request is utilized for a variety of reasons, including, but not limited to: ◦ Items not able to be purchased through Office Max ◦ Conference.
TAX-AIDE Concluding the Interview Pub 4491 – Part 8 Pub 4012 – Pages K-5–K-11 Instructor Workshop –
Dr. Sophia Hassiotis.  Laboratory set up  Personal Protective equipment  Directions for mixing  Slump test  Cylinder casting  Cleaning up your station.
TAX-AIDE Concluding the Interview Pub 4491 – Part 8 Pub 4012 – Pages K-5–K-11 NTTC Training –
READYMIX INDUSTRY There are two main components in asphalt concrete: 1) the asphalt cement, or glue, and 2) the aggregates.
SELF TEST TUTORIAL Taking an Exam What you need to get started.
How to Fill Out the CARD Form (Course Assessment Reporting Data Form)
HMRC Fuel Duty Drawback Or why fly in the UK when you can fly foreign cheaper.
ARCHIVES. Go to Chandler Unified School District website Go to Departments Select Warehouse On the menu to the left select Record Retention 1. The first.
EPTO Electronic Paid Time Off System Lora Headdy ePTO & HRMS eDoc System Manager.
East Carolina University Revised 12/14 1. Documents to be submitted to Graduate School Completed and signed graduate contract Terms and Conditions SACS.
Remarks will print on the completed form Generate Quantity Book Entry Generate Pay Quantity.
VisiMix Data Base Management VisiMix Ltd, PO Box 45170, Jerusalem, 91450, Israel Tel: Fax:
Welcome to the Radiation Protection Technology Information Session!
Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
Steps in Fleet Selection ©Dr. B. C. Paul 2000, revised 2008 Note- General steps and methodologies found in these slides roughly follow material found.
State of Oregon, DAS Fleet Fuel Island Operations - E-85.
S TATE F LEET T RAINING Policies and procedures for reserving and using state fleet vehicles for VCSU faculty, staff, and students. 08/15.
Concluding the Interview
NATIVE ANIMAL TRUST FUND Inc.. HUNTER WILDLIFE RESCUE SERVICE HELPING INJURED WILDLIFE IN THE HUTER REGION.
Welcome to 3 rd Grade!!. Parking lot procedures Mornings & Afternoons Children load and unload from the curbs and at the crosswalks only. The West (back)
Extended Response Problems Mathematics Theme: 5 th grade math Audience: 5 th grade students preparing for the ISAT test. Environment: The students have.
 (i) has two Axles and a gross Vehicle weight or registered gross Vehicle weight in excess of 26,000 pounds (11, kilograms), or  (ii) has three.
Step 1: Go to 2/29/16.
Information Marketing Group, Inc. iStaff/Massachusetts EPIMS.
Travel or Conference Training Sponsored by Classified Senate.
NAM Talent Development & Performance Management Brought to you by your friendly Human Resources Team! Success Factors Performance Management System Training.
BY:- AIYAPPA T.B, 5TH SEM CIVIL, KPT.
Asphalt Tippers Tail gate lock control switch Auto tarp switch In unlocked position.
SECONDARY / ALL LEVEL APPLICATION For students seeking certification in 6-12, 7-12, 8-12, or All Level Art, Music, PE, or Spanish Fillable Application.
DEVRY CIS 336 W EEK 7 G ROUP P ROJECT T ASK 5 Check this A+ tutorial guideline at
STUDENT TRANSCRIPTS & ARCHIVES.
ALDOT Specifications Update
Transportation/ Vehicle Usage
CLAIMS FILING PROCESS USING OUR “TICKET SYSTEM”
Presented By: Denise Matias, CAH November 15, 2016
Secondary / All Level Application
PTA Treasurer Training
F-1 OPT Workshop.
Post Trip Inspection (Delivery)
TODAY DASHBOARD.
Diesel Automotive Engines
Gary Bennion Manager - Operational Tax Con-way Inc.
IVG Driver Training Performance Monitoring.
Limited Purchase Checks (LPCs)
Federal Income Tax Exactly as shown on your Form W2
Document Custodian of the Drop Safe Log
TransCAD Vehicle Routing 2018/11/29.
F-1 OPT Workshop.
Auditing with GPS and on-board recording devices
Aftermarket Parts and Services
Tax Card Online for students
Two methods to observe tutorial
Two methods to observe tutorial
User Guide to Reviewers of Opto-Electronic Advances (OEA)
Federal Income Tax Check the one that applies. Likely “Single.”
Guide To Reconcile Sales Tax Updated June 2019
Liquid Controls LCR600 Service Training
Presentation transcript:

NRMCA PTO Fuel Use Test Procedure Guide

Before You Begin: Fill in Boxes of NRMCA’s PTO Data Sheet Be sure to include a detailed description of the truck and engine being used to perform the test, the area terrain, and your mixer fleet.

One PTO test consists of four trip segments: Trip #1: Loaded, PTO Engaged Trip #2: Empty, PTO Engaged Trip #3: Loaded, PTO Disconnected Trip #4: Empty, PTO Disconnected

Trip #1 Loaded, PTO Engaged

Top Off the Truck’s Fuel Tank Be certain to fill the fuel tank to the very top of the filler neck. The tank should be so full that any additional fuel would cause spillover.

Record Odometer Reading and Time Immediately after topping off the truck’s fuel tank, record the odometer reading in Box 12 and the time in Box 13. Set your drum revolution counter to zero.

Fill the Mixer Drum with a Load of Fresh Concrete A full load is recommended. Please record the size of the load, in cubic yards, in Box 14. After loading, complete your normal wash-off procedure before leaving the plant.

Important Note for Trucks Required to Use Fold-Down Axles If you are required to use a fold-down axle when hauling a full load, DO NOT haul a full load in Trip #1. Rather, fill the drum with as much weight as possible without having to use the fold-down axle. Use the same amount of weight in Trip #3.

Drive to the Job Site Please memorize the route you use to get to the job site, because you will use it three additional times during the course of the PTO test.

At the Job Site… Record the time you arrive at the job site in Box 15. Dispense your load and wash down your drum.

After Unloading and Wash-Out… Record the time you leave the job site in Box 16.

Return to the Plant Return to the plant, using the exact same route by which you came. Upon arriving at the plant, park at the diesel fuel tank.

Record Odometer Reading, Time and Drum Revolution Counter After parking by the diesel fuel tank, record the time in Box 17, the odometer reading in Box 18, and the drum revolution counter reading in Box 19. Reset the drum revolution counter for Trip #2.

Top Off the Truck’s Fuel Tank Be certain to fill the fuel tank to the very top of the filler neck. The tank should be so full that any additional fuel would cause spillover.

Read the Fuel Meter Record the total Trip #1 fuel usage in Box 20.

Trip #2 Empty, PTO Engaged

Record Odometer Reading and Time Immediately after topping off the fuel tank, record the odometer reading in Box 21 and the time in Box 22. If possible, do not wash out the drum between Trip #1 and Trip #2.

Drive to the Job Site Use the exact same route you used in Trip #1. Keep the mixer drum turning at the same number of RPMs as you did during Trip #1.

Return to the Plant Return to the plant, using the exact same route by which you came. Keep the drum turning at the same number of RPMs as you did during Trip #1.

Unloading Time Simulation Upon your return to the plant, record the time in Box 23. You must then idle the truck for a specified period of time to simulate the unloading time you incurred on Trip #1. The appropriate amount of time can be calculated by subtracting the time in Box 15 from Box 16.

Wash Out the Mixer Drum Thoroughly wash out the mixer drum in preparation for Trip #3.

Record Odometer Reading, Time and Drum Revolution Counter After the unloading time simulation, record the time in Box 24, the odometer reading in Box 26 and the drum revolution counter reading in Box 27. Since you are simulating the unloading time at the plant instead of the job site, the time in Box 25 (Time Run Complete) will be the same as Box 24.

Top Off the Truck’s Fuel Tank Be certain to fill the fuel tank to the very top of the filler neck. The tank should be so full that any additional fuel would cause spillover.

Read the Fuel Meter Record the total Trip #2 fuel usage in Box 28.

Trip #3 Loaded, PTO Disconnected

Fill the Mixer Drum with a Load of Aggregate The weight of the aggregate in the drum must be equivalent to the weight of the original load in Trip #1.

Disconnect the PTO Shaft from the Driveshaft

Top Off the Truck’s Fuel Tank Be certain to fill the fuel tank to the very top of the filler neck. The tank should be so full that any additional fuel would cause spillover.

Record Odometer Reading and Time Immediately after topping off the fuel tank, record the odometer reading in Box 29 and the time in Box 30.

Drive to the Job Site Use the exact same route you used in your previous trips.

Return to the Plant Return to the plant, using the exact same route by which you came.

Unloading Time Simulation Upon your return to the plant, record the time in Box 31. You must then simulate Trip #1 unloading time in the same manner as you did in Trip #2. The appropriate amount of time can be calculated by subtracting the time in Box 15 from Box 16.

Record Odometer Reading and Time After the unloading simulation, record the time in Box 32 and the odometer reading in Box 34. Since you are simulating the unloading time at the plant instead of the job site, the time in Box 33 (Time Run Complete) will be the same as Box 32.

Top Off the Truck’s Fuel Tank Be certain to fill the fuel tank to the very top of the filler neck. The tank should be so full that any additional fuel would cause spillover.

Read the Fuel Meter Record the total Trip #3 fuel usage in Box 35.

Reconnect the PTO Shaft

Discharge the Aggregate from the Mixer Drum

Trip #4 Empty, PTO Disconnected

Disconnect the PTO Shaft from the Driveshaft

Top Off the Truck’s Fuel Tank Be certain to fill the fuel tank to the very top of the filler neck. The tank should be so full that any additional fuel would cause spillover.

Record Odometer Reading and Time Immediately after topping off the fuel tank, record the odometer reading in Box 36 and the time in Box 37.

Drive to the Job Site Use the exact same route you used in all previous trips.

Return to the Plant Return to the plant, using the exact same route by which you came.

Unloading Time Simulation Upon your return to the plant, record the time in Box 38. You must then simulate Trip #1 unloading time as you did in Trips #2 and #3. The appropriate amount of time can be calculated by subtracting the time in Box 15 from Box 16.

Record Odometer Reading and Time After the unloading simulation, record the time in Box 39 and the odometer reading in Box 41. Since you are simulating the unloading time at the plant instead of the job site, the time in Box 40 (Time Run Complete) will be the same as Box 39.

Top Off the Truck’s Fuel Tank Be certain to fill the fuel tank to the very top of the filler neck. The tank should be so full that any additional fuel would cause spillover.

Read the Fuel Meter Record the total Trip #4 fuel usage in Box 42.

Reconnect the PTO Shaft After completing the PTO test, prepare the truck for its return to service by reconnecting the PTO shaft to the driveshaft.

Submit the Completed Data Sheet to NRMCA Have your supervisor review and sign off on the completed data sheet. You can then fax the completed sheet to NRMCA’s Government Affairs Department at (301) or input the data into the data sheet excel file and send via electronic mail.

Thank You For Helping Your Industry Achieve Fuel Tax Fairness!