KHARKOV TEAM ACTIVITIES FOR CBM WITHIN THE STCU PROJECT P602 1 Representatives: Prof. Slava Borshchov.

Slides:



Advertisements
Similar presentations
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Advertisements

1 Service panels run from detector end to end of support tube X-section through service panels 3-D view of panels PP0 region. All services break here Patch.
Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa 1 STATUS REPORT.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Status of the ATLAS MM project
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
For high fluence, good S/N ratio thanks to: Single strip leakage current I leak  95nA at T  -5C Interstrip capacitance  3pF SVX4 chip 10 modules fully.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Printed Circuit Board Design
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
J.M. Heuser — CBM Silicon Tracker 1 Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 15 October 2008 CBMCBM Review of the first in-beam.
© Psion Confidentialpsion.com | ingenuityworking.com Specific Partner Kitting UHF Xmod Circular + End Cap Scanner Authors : Fabien BARRY Version : A00.
Multilayer thin film technology for the STS electronic high density interconnection E. Atkin Moscow Engineering Physics Institute (State University) –
1 The 3-rd Work Meeting of the CBM -MPD STS Consortium “Technical challenges of the CBM and MPD Silicon Tracking Systems 2009” THE CABLES FOR THE CABLES.
1 Physics of Compressed Baryonic Matter 12 th CBM Collaboration Meeting R&D ON MICRO-CABLES FOR BABY SENSOR RADIATION TEST MODULE October , 2008.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
CBM-MPD STS consortium – status of activities Yuri Murin for the Consortium –Engineering of STS module, ladder, station –Cooling system concept and plans.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
Module Development Plan I believe that we are ready to proceed to a program to demonstrate a PS module based on “2.5 D” interconnections. This is based.
Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI.
Technical Support Activities in PH-ADO-PO
1 J.M. Heuser – CBM Silicon Tracking System Roadmap for the development of STS module demonstrators Concept Common interfaces/dimensions Some technical.
Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI 13-th CBM,
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
News on microstrip detector R&D —Quality assurance tests— Anton Lymanets, Johann Heuser 12 th CBM collaboration meeting Dubna, October
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Status of RF stations for NICA project MAC meeting october 2015.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
CBM Collaboration Meeting. GSI, Darmstadt CBM Silicon Tracking System. CBM-01 sensors characterization. V.M. Pugatch Kiev Institute for Nuclear.
Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
ASU boards for RPC detectors Production status. Presentation outline Active Sensor Unit electronic board for GRPC detectors – quick reminder – board functional.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
7 october 20111T. Schneider Test bench for digital sensor New Philips Digital Light Sensor Outer dimensions 32.6*32.6mm 2 8*8 pixel array Pixel pitch 4*4mm.
AIDA 1 Mezzanine board Resistors and capacitors near the ASiCs have now been relocated to the underside of the PCB. Cooling pads have been extended.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Design and development of thin double side silicon microstrip sensors for CBM experiment Mikhail Merkin Skobeltsyn Institute of Nuclear Physics Moscow.
1 J.M. Heuser − STS R&D Johann M. Heuser, GSI CBM-STS Project Leader Meeting on Experiment with external HI beams of the Nuclotron-M JINR, 4 February 2011.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
The STS-module-assembly:
BM&N STS ladders assembly in VLHEP
n-XYTER Hybrid Developments
Test beam straw prototype production status
GSI, for the CBM Collaboration
Progress with System Integration of the CBM Silicon Tracking Detector
The workflow of module assembly for the CBM Silicon Tracking System
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Technical Design for the Mu3e Detector
ASU board: PCB production and testings
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Adapting the via last Design
Some proposals on HV circuits realization for segmented straw detector
10/month is the present production rate 2 FTE + sporadic contributions
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
FEE Electronics progress
Manufacturing Processes
After service guide for changing PCB
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
A Beam telescope for the EMC testbeam
Presentation transcript:

KHARKOV TEAM ACTIVITIES FOR CBM WITHIN THE STCU PROJECT P602 1 Representatives: Prof. Slava Borshchov -team leader Ihor Tymchuk (speaker) Maksym Protsenko 22 nd CBM Collaboration, JINR, September, 6-7, 2013

Outline STCU Project P602- main goals Main tasks for year 2013 Demonstrators for beam tests Next activities 2

3 STCU Project P602- main goals 3 P602 STCU project,,R&D on Silicon Strip Module design and production for CBM experiment at FAIR” Main tasks of the project: Development and assembly of Demonstrators for beam tests, based on CBM05 sensors Design and assembly procedure development and production of full-scale mechanical mock-ups of detector modules based on new approach (separate cables for each STS-chip) Design development and construction of full-scale full-functional prototypes of the STS-modules

4 Main tasks for year Development and assembly of Demonstrators for beam tests Design and assembly procedures (few options) development and production of full-scale mechanical mock-ups of detector modules based

5 Demonstrators for beam tests 5 For beam tests at COSY development of 4 pcs of Demonstrators is foreseen Structure is the similar as for Demonstrators 1-b’ made before but design is different Demonstrator 1-b’

6 Demonstrators – arrangement features 6 Demonstrator 1 (single sensor) Demonstrator 2 (single sensor) Demonstrator 3 (double sensor) Demonstrator 4 (double sensor) P-side N-side DCC-P DCC-N--1 st nd

7 Demonstrators – developed assemblies 7 Demonstrator 1 (single sensor) Demonstrator 2 (single sensor) Demonstrator 3 (double sensor) Demonstrator 4 (double sensor)

8 Demonstrators – developed components 8 Connection layers TOP Meshed spacers Shielding layers Connection layers BOTTOM Flexible boards for PCB Support PCB InsulatorsBias lines contacts Flex Mount for ERNI PCB for ERNI and also daisy-chain cables are developed About 20 types of components are developed

9 Demonstrators – developed photomasks 9 Connection layers TOP Meshed spacers Shielding layers Connection layers BOTTOM Flexible board Flex Mount PCB for ERNI More than 30 photomasks are developed and manufactured

10 Connection layers TOP Meshed spacers Shielding layers Connection layers BOTTOM Flexible boards for PCB Support PCB Insulators Bias lines contacts Flex Mount for ERNI PCB for ERNI Demonstrators – manufactured components

11 Demonstrators – next steps This week most part of components are going to be manufactured (for the first assembly operations) Next week all components are going to be manufactured This week we are going to start components assembling

12 Next steps for this year 12 Development assembly procedures for,,new” detector modules (will be developed different options and checked at mock-ups assembling) Designing of mechanical mock-ups and their components Components manufacturing Mock-ups assembling

Thanks a lot for your attention. 13