Doc.: IEEE 802.11-16/0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: 2016-06-13 Authors: P802.11ah Report to EC on Approval to forward draft.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0320r1 Submission March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 1 P802.11ac Report to EC on Conditional Approval to go to.
Advertisements

Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
P802.11ah Report to EC on Conditional Approval to go to Sponsor Ballot
Doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to.
Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval to proceed.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
xxxx doc.: IEEE /xxxxr0 March 2017
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2010
November 2008 doc.: IEEE /1437r1 November 2010
November 2008 doc.: IEEE /1437r1 August 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Report to EC on approval to forward draft to RevCom
January 2012 doc.: IEEE /0179r1 Jan 2012
Presentation transcript:

doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft to RevCom

doc.: IEEE /0777r0 Report Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for approval to send IEEE P802.11ah Draft 8.0 to Revcom. July 2016 Yongho Seok (NEWRACOM)Slide 2

doc.: IEEE /0777r0 Report Sponsor Ballot Results – P802.11ah July 2016 Yongho Seok (NEWRACOM)Slide 3 Ballot Close Date Title Pool Return %Return Abstain %Abstain Approve Disapprove %Approve Nov 5, 2015 Initial Sponsor Ballot for TGah draft March 2, 2016 First Recirculation Sponsor Ballot for TGac draft April 14, 2016 Second Recirculation Sponsor Ballot for TGac draft May 17, 2016 Third Recirculation Sponsor Ballot for TGac draft SB 3 Post Ballot vote change

doc.: IEEE /0777r0 Report Sponsor Ballot Comments – P802.11ah July 2016 Yongho Seok (NEWRACOM)Slide 4 Ballot Close Date Title Total Number of Comments received (Yes and No votes) Nov 5, 2015 Initial Sponsor Ballot for TGah draft (287T, 265 E) March 2, 2016 First Recirculation Sponsor Ballot for TGac draft (66 T, 15 E) April 14, 2016 Second Recirculation Sponsor Ballot for TGac draft (23 T, 1 E) May 17, 2016 Third Recirculation Sponsor Ballot for TGac draft (2 T, 0 E) * Comments form Yes votes

doc.: IEEE /0777r0 Report Unsatisfied comments by commenter July 2016 VoterInitial Sponsor Ballot 1st Re- circulat ion 2 nd Re- circulat ion 3 rd Re- circulat ion Total Fischer, Matthew Hunter, David McCann, Stephen Palm, Stephen Rolfe, Benjamin Stephens, Adrian Total Yongho Seok (NEWRACOM) (*) Commenter provided no response for a contact to ask which comments are satisfied or unsatisfied. Slide 5

doc.: IEEE /0777r0 Report Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: –Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this. July 2016 Slide 6Yongho Seok (NEWRACOM)

doc.: IEEE /0777r0 Report Mandatory Coordination July 2016 Yongho Seok (NEWRACOM)Slide 7 Coordination EntityDraftDateStatus IEEE-SA Editorial (MEC)D4.0February 2015 “Meets all editorial requirements.” Quantities, Units and Letter Symbols (SCC14) Not required Terms and Definitions (SCC10) Not required Registration Authority Committee (RAC) Not required

doc.: IEEE /0777r0 Report TGah Timeline July 2016 Yongho Seok (NEWRACOM)Slide 8 2 nd Recirculation Sponsor Ballot on D7.0 Open Close rd Recirculation Sponsor Ballot on D8.0 Open Close Report to EC on meeting conditions to proceed to RevCom Posting to RevCom