IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.

Slides:



Advertisements
Similar presentations
MnDOT Metro District State Aid Construction Thursday February 19 th, 2015.
Advertisements

City of Eugene Certification Project Case Study. Why Did Eugene Get Certified? Can’t do fund exchange ODOT's Local Agency Program More project control.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Standards Aligned Systems MANDATE WAIVER PROGRAM 2008.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
14.21 Contract Closeout Procedure Update Notice of Completion, Release of Retention and Punchlist Resolution December 8, 2005.
Plans, Specifications and Estimate (PS&E) Kelli Sparkman Local Agency Liaison, Region 3 January 30, 2009.
Coordinating with Project Manager Cindy Kowalski, PMP Utility Coordinator, Parsons December 2013.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Review of 2010 Biennial Audit of Capital Projects Cyndi Fout Project Services Director February 28, 2011.
Greenfield District Utility/RR Engineer, INDOT
Work Plan Development Steve Robinson Highway Utility Engineer, INDOT June 11, 2015.
1 CDBG Procurement Requirements For Local Officials.
LPA – Utility Coordination Natalie Parks StructurePoint November 20, 2013.
U.S. Small Business Administration
Coordinating with Project Manager Cindy Kowalski, PMP Utility Coordinator, Parsons November 19, 2013.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
CSBS Fourth Friday Faculty Workshop 1: Grant Management CSBS: Frances Solano ORSP: Stefanie Friesen TUC: Stacey Lord / Maryann Camarillo 1/23/
Davis-Bacon, Related Acts, and Your Project Where you can locate the information needed to comply with Davis-Bacon and Related Acts 1.
Work Plan Development Aschalew Aberra Highway Utility Engineer, INDOT November 20, 2013.
DPW/OPM Lease Process Improvement “LEAN”. LEAN Business Case The Goal of the leasing process is to implement the most economical and appropriate options.
1 Updates to Texas Administrative Code 1TAC 206 Jeff Kline, Statewide Accessibility Coordinator Texas Department of Information Resources February 8, 2012.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Research Phase, Indiana 811, Initial Notice, Verification Deborah Porter Project Engineer/Utility Coordinator Clark Dietz, Inc.
School Budget (Draft)
Understanding Right of Way Process Dawn Haecker, Training & Technical Support Supervisor, INDOT Trent Newport, VP, CrossRoad Engineers.
Mock State Aid Project County Highway Accountant’s Conference 2015.
AISD Bookkeeper and Admin Training 2013 STANDARD SERVICE AGREEMENT Bowie High School August 8, 2013 STRONG LEADERS STRONG SCHOOLS BUILDING ON STRENGTHS.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
The Lifecycle of Grants: Grant Agreement and Fair Housing November 7, 2012.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Contract Training Class I
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Highway Utility Engineer, INDOT
Long Term Care Certified Nurse Aide Instructor/Coordinator Certification Workshop Oklahoma Dept. of Career & Technology Education October 7, 2015 Nurse.
Construction Review LaVon M Marshall Greenfield District Utility/RR Engineer, INDOT June 11, 2015.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
WYDOT CLEARING UTILITIES Keri Bohlmann, P.E. Utilities & DSS Supervisor.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
Sponsored Project Administration Fall 2012 CERTIFICATION PROGRAM Sponsored Project Lifecycle Introduction Overview Creating a Project Budget Compliance.
The Right Things to Know about Right- of-Way April 8, 2016 Tammy M. Keeley Realty Officer FHWA – AL Divisi on.
Change Orders on Federal-aid Highway Construction Projects Bren George-Nwabugwu (FHWA) ; (317)
Coordinating with Project Managers Cassie Reiter, P.E., ENV SP Utility Coordinator/Project Manager CMT Engineers and Consultants June 2016.
Contract Compliance Training
2017 ACEA Annual Conference
Construction Oversight
County Highway Accountant’s Conference 2015
LOCALLY ADMINISTERED PROJECTS
Financial Oversight of the Federal-aid Program Financial Integrity Review and Evaluation (FIRE) Program Mark Newland, Financial Manager FHWA Indiana.
Safety Responsibilities
Contract Compliance Training
Contract Review and Processing
State Aid Construction
Designers’ Manual Overview and Chapter Contents
Administrator of Construction Todd Wilson Senior Project Manager
Grants Management 101 Part A
Research Phase, Indiana 811, Initial Notice, Verification
Agreements & Cost Estimates
Brown Bag Breakfast Briefing: Professional Service Providers
Work Plan Development.
Buy America and Utility Work
First Steps to Project Management Tribal Track
A Paradigm for Utility Coordination
105 Indiana Administrative Code Article 13
Utility Coordination: An Overview
State Aid Construction
Right of Way Certification
Project Manager / Utility Liaison
Agreements & Cost Estimates
Presentation transcript:

IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016

Learning Objectives Become familiar with IDM Chapter 104 –  Our source document for utility coordination  Definitions, codes Roles & Responsibilities  What are the major roles?  Where can I find the responsibilities? Utility Coordination Certification  Our most important deliverable  Know and Apply certification Special Provision 107-R-169  How does it relate to Certification? Work in Contract

What About Indiana 811? IC Requires contacting Indiana 811 prior to excavation or demolition..

Indiana 811 Dig Laws So…… If the contractor, by law, has to contact Indiana 811 before excavating, why do we even bother with utility coordination?

Another Layer of Protection According to the IURC:  40% fail to call 811  30% fail to locate  23% fail to excavate properly

Why the Design Manual 104?  Implements the collaborative paradigm Helps the utility coordinator to build the right relation with utilities Minimizes impact to utilities Reduces cost and saves time At least four (4) times IDM Chapter 4 directs both the designer and the coordinator to design around utilities  See Pages 5-7, 11  Brings uniformity to utility coordination and helps limit risk to the project

1. Design Around Utilities Avoid overhead & underground relocations

2. Minimizes Impact

3. Reduce Cost, Risk, & Time Know which utilities will limit construction methods

Become Familiar with IDM 104 Ch 104

Design Memo Revisions Note the Design Memo Revisions on the Title Sheet Design Memorandum Revision Date Sections Affected August, 2013 February, 2015 Chapter 10 Superseded by Chapter (04), ,

References Code of Federal Regulations 23 CFR 645 Indiana Code Majority of references Indiana Administrative Code 105 IAC 13 INDOT Standard Specifications FHWA Program Guide 23 CFR 645 ASCE Standards for SUE The Indiana Utility Accommodation Policy

Definitions Section includes: Definitions Acronyms Abbreviations Intent was to be consistent with: Standard Specifications Design Manual Review at your own pace and time

Roles & Responsibilities Key to understanding IDM Ch. 104 There are 6 specific roles described: Designer 16 responsibilities Utility Coordinator 81 responsibilities Utility Oversight Agent 20 responsibilities Surveyor 5 responsibilities Project Manager 9 responsibilities Authorized Representative 6 responsibilities

Checklist Checklist for utility coordination 1. Prepare a utility coordination certification and utility special provisions 2. Prepare a contractor approval letter 3. Prepare a work complete letter 4. Prepare a letter requesting an invoice 5. Advise the project team on utility work in contract 6. Keep Records

1. Contract Requirements Utility Coordination Certification which includes Special Provision 107- R-169 No Waiver – Certification with limited Utility involvement

Certification Use a Utility Coordination Certification for all projects Utility Coordination Certification includes: Affidavit – your due diligence Utility information SP 107-R-169 The Utility Coordination Certification format is on the INDOT website

Changes to the Certification Utility Coordination Certification Example Template on INDOT website

Certification – 1 of 7 Utility Coordination Certification Contract No:Letting Date: Lead Des No.Related Des #s

Certification – 2 of 7 No Utilities were found within the project limits Utilities exist within the project limits, but have been found not to be affected by the proposed construction; or incidental construction. Utilities exist within the project limits and have been found to be affected by the proposed construction Unique Project Type - Design Build Unique Project Type – Limited Utility Involvement Types of Utility Coordination Certification

Two Unique Project Types 1. INDOT Design Build Project 2. Limited Utility Involvement

Certification – 3 of 7 Letting Status Let without Exceptions Let with Exceptions Not Applicable

What is an Exception? An Exception exists when we have one of the following conditions: 1. A utility that needs to be relocated in order to be out of conflict with the project will not have been relocated by the RFC date. 2. An agreement will not have been executed by RFC for at least one of the reimbursable utilities. 3. A work plan will not have been approved by RFC for at least one utility that exists within the project limits. Exceptions: Go to

The undersigned affirms that they are an INDOT Certified Utility Coordinator and have performed all of the required duties for the project. The undersigned affirms they have performed his or her responsibilities as a utility coordinator in conformance with 105 IAC 13, the Utility Accommodation Policy and Indiana Design Manual Chapter The 107-R-169 is attached._______________ Utility CoordinatorDate _______________ (Printed Name) _______________ Firm Name Certification – 4 of 7 Affidavit

Certification – 5 of 7 Certification with Exception is approved for letting. (Authorized signature is required for exceptions) ____________________________________________ Authorized Approver’s SignatureDate __________________________ (Printed Name)

The Utility Special Provisions The utility special provisions are a part of the utility coordination certification Lavon Marshall will describe this in detail tomorrow afternoon.

Certification – 6 of 7 Unique Project Type INDOT Design Build Project The undersigned affirms that they are an INDOT Certified Utility Coordinator and have performed all of the required duties for the project required for the design build project …………….The 107-R-169 is attached._________________ Utility CoordinatorDate _____________________________________ Printed NameFirm Name

Certification – 7 of 7 Unique Project Type Limited Utility Involvement The undersigned affirms that this project falls within the parameters of a limited utility involvement certification…………_________________ Utility CoordinatorDate _____________________________________ Printed NameFirm Name

3. Contractor Approval Receive a letter from the Utility that requests the use of a contractor Review scope of work, bid tabs, rates, unit costs for materials and labor Send approval letter

4. Letter Work Complete “We are writing in regards to your relocation work plan dated September 30, 2014…” Template on web site Example:

5. Letter Request Invoice “We are writing in regards to your agreement with INDOT in the amount of $159, that is dated February 6, 2014…” Template on website Example:

6. Work In Contract INDOT prefers to use work in contract When eligible for reimbursement When work requires extensive coordination When the same primary contractor will be used through the entire project Requires Des. No. for each facility type Utility must provide: Approved work plan Signed agreement Final stamped plans Specifications Engineer’s estimate; items: any unique items List of quantities

7. Records Keep copies of the following: Maintain a utility coordination log Activities Conversations All signed documents All notices to proceed Legal Correspondence

Summary Become familiar with IDM Chapter 104 –  Our source document for utility coordination  Definitions, codes Roles & Responsibilities  What are the major roles?  Where can I find the responsibilities? Utility Coordination Certification  Our most important deliverable  Know and Apply certification Special Provision 107-R-169  How does it relate to Certification? Work in contract

Questions?