FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development,

Slides:



Advertisements
Similar presentations
05 – 10 September. Institute of Radio Astronomy - INAF Head-quarters in Bologna.
Advertisements

29 November Research Infrastructures in FP7 Jean-Louis Picqué European Commission DG Research.
Information about the Integrated Infrastructures Initiatives (I3) instrument Daniel Pasini EC, DG Research, Unit B3 – Research Infrastructures EC, Brussels,
November 2004 The Research Infrastructures in FP7 DG RTD – Directorate ‘Structuring ERA’
OPTICON Board Meeting, Porto, OPTICON WP4 Interferometry Status Report D. Mourard presented by A. Chelli.
Philip Diamond RadioNet Co-ordinator University of Manchester Jodrell Bank Observatory.
First e-EVN Science and Future Astronomy projects via EXPReS Michael Garrett Joint Institute for VLBI in Europe e-VLBI Workshop, Sydney, 13 July 2005.
Research Infrastructures The Research Infrastructures in FP7.
Research and Innovation Research and Innovation Research and Innovation Research and Innovation Research Infrastructures and Horizon 2020 The EU Framework.
Sixth Framework Programme INTRODUCTION . Contents Contents of FP6 Instruments in FP6 Financing Budgets Timetable Highlights.
End User End User Product/ Service Product/ Service Commercial Prototype Commercial Prototype Technical Prototype Technical Prototype Applied Research.
GÉANT and The Future of Pan-European Networking CCIRN, 3 rd July 2004 John Boland CEO HEAnet Member of DANTE Board of Directors.
The next call FP Infrastructures-5. FP Infrastructures-5 Call outline (1) All fields of S&T are covered Publication date: 4 November 2004.
1 e-Infrastructures and Virtualisation, Remote Instrumentation “The views expressed in this presentation are those of the author and do not necessarily.
Research Infrastructures in FP7 On behalf of : Anna Maria Johansson, Hervé Péro European Commission, DG RTD/B3 MarineERA workshop Feb
1 Research Infrastructures in FP7 EUDET Annual Meeting 19 October 2006, Munich Dr. Gerburg Larsen European Commission, RTD-B.3 - Research Infrastructures.
Philip Diamond RadioNet Coordinator University of Manchester Jodrell Bank Observatory FP7 RadioNet and CCAT: 13 September 2006 Cardiff.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
LOFAR AND AFRICA Daan du Toit DST – South Africa.
Philip Diamond RadioNet Coordinator University of Manchester Jodrell Bank Observatory, UK OPTICON FP7 Strategy meeting Edinburgh, 23 June 2006 Leonid Gurvits.
Research Infrastructures in FP7 Christian Kurrer European Commission, DG RTD EURONS/EURISOL Town Meeting
RTD-B.4 - Regions of Knowledge and Research Potential Regional Dimension of the 7th Framework Programme Regions of Knowledge Objectives and Activities.
FP7 – Capacities Research Infrastructures and Research for the Benefit of SMEs.
The HEAP-MM proposal P. Piattelli VLVnT The call  INFRA Research Infrastructures for astroparticle physics: High energy cosmic rays,
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 EUDET I3 Kickoff meeting, Desy, Hamburg 15-17/2/2006 Presentation by Stefano Fontana, DG Research.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
An I3 funded by the EU through FP6 Alastair G Gunn University of Manchester Jodrell Bank Observatory OPTICON BOARD MEETING – 11 th /12 th October 2004,
Lessons learned from cm-wave interferometry Interferometry analysis is less straightforward than single aperture analysis. Astronomers need ‘support’.
RadioNet3 & SKA Franco Mantovani Project Scientist RadioNet3 Max-Planck-Institut für Radioastronomie, Bonn Istituto di Radioastronomia - INAF, Bologna.
Research Networks and Astronomy Richard Schilizzi Joint Institute for VLBI in Europe
FP7 /1 EUROPEAN COMMISSION - Research DG – September 2006 Building a Europe of Knowledge Towards the Seventh Framework Programme
Philip Diamond RadioNet Coordinator University of Manchester Jodrell Bank Observatory Overall Objectives MTR: 12 April 2007 Grenoble.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
● Radio telescope arrays – km diameter – Resolution arcmin to micro-arcsec at radio wavelengths ● Similar (baseline/ wavelength) for other regimes.
EURO-VO Structure Data Centre Alliance (DCA) A collaborative and operational network of European data centres who, by the uptake of new VO technologies.
76-m Lovell Telescope Jodrell Bank, UK Even big telescopes see no more detail than the naked eye High bandwidth data transfer - the future of European.
Regional Dimension of the 7th Framework Programme « RESEARCH POTENTIAL » « CAPACITIES » SPECIFIC PROGRAMME Louis BELLEMIN.
FP7 – Nov Towards the EU Seventh Framework Programme (FP7) European Commission Research DG.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 Meeting with NuPECC 9 March 2006 Presentation by Daniel Pasini, DG Research.
1 7 th Research Framework Programme Rules for the Participation.
SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no
EGEE is a project funded by the European Union under contract IST EGEE Summary NA2 Partners April
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
Netherlands Institute for Radio Astronomy Big Data Radio Astronomy A VRC for SKA and its pathfinders Hanno Holties March 28 th 2012.
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
1 Research Infrastructures in FP6 European Commission - Directorate-General for Research 30/10/2002 Support for Research Infrastructures in FP6 Daniel.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Plans for PY2 Steven Newhouse Project Director, EGI.eu 30/05/2011 Future.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 CARE Collaboration Meeting CERN, Switzerland, November 2005 Presentation by Daniel Pasini,
ALMA and FP6 Opportunities and strategy Funded project – construction phase FP6 timeframe 2003 – Good timing - first science planned for.
Uniboard Kick Off February 26 th 2009 RadioNet FP7 Advanced Radio Astronomy in Europe Contract no.:
Coordinator: Anton Zensus Max-Planck-Institut für Radioastronomie (MPIfR) EC Contract No:
Name - Date Technology-enhanced Learning: tomorrow’s school and beyond Pat Manson Head of Unit Technology Enhanced Learning Directorate General.
* Chair of the ASTERICS General Assembly
Bob Jones EGEE Technical Director
Mid Frequency Aperture Arrays
Regional Research-driven clusters as a tool for strenghthening regional economic development: the FP7 Regions of Knowledge Programme and its synergies.
ERA Broadband Research Network for Radio Astronomy Produced by Ron McArthur September 2002 Tel: +44 (0) Fax: +44 (0) Meet-me:
An FP5 RTD programme Participants: University of Manchester: UK
EXPReS Annual Review April 17
Advanced Radio Astronomy in Europe Contract no.:
Introduction to the EEA and the EIONET
Cécile Germain-Renaud Grid Observatory meeting 19 October 2007 Orsay
European Radio Astronomy: strategies for a long-term future
Regional Centres – Discussion points
SKADS Controller Meeting
Jumping JIVE is an ambitious series of initiatives
Energy Systems Catapult
Peter Clarke EGEE Peter Clarke
Experience of the implementation of FP6; preparations towards FP7
Presentation transcript:

FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development, 300 M€ for GEANT and grids design studies, 1-10 M€, 2-4 years contribution to capital costs of new infrastructures, 10% max, 5-15 M€, lump sum

Vision for European radio astronomy Maintain EVN at state-of-the-art Maintain national facilities at state-of-the-art; training grounds for young astronomers and engineers Upgrade EVN to e-EVN; links to China, SA, US, Japan essential Upgrade MERLIN to e-MERLIN for stand-alone and joint with e-EVN observations Develop and operate new, predominantly regional or national radio telescopes: LOFAR (NL, DE, SE), SRT-64 (IT), Yebes- 40 (ES) Develop and operate new global telescopes: ALMA, SKA

Integrated Infrastructure Initiative: networking activities management of the network develop synergies and complementary capabilities prototype ALMA regional support centre? incorporate CRAF meetings and workshops organisation of radio astronomy in Europe (Foresight Study)

I3: Trans-national access - continue access program for EVN - introduce access to individual major radio astronomy facilities operating as stand-alone instruments (eligibility: annual operating costs > 0.5 M€) MERLIN, Effelsberg IRAM, JCMT Yebes, Nancay WSRT, SEST

I3: Joint Research Activities Joint research activities, RTD, to enhance access through improvement of the infrastructure calibration and imaging software for high sensitivity astronomy receiver development (components+systems, software, bolometer arrays) for IRAM, Onsala, Metsahovi, Yebes, APEX, ALMA, SRT, EVN new digital technologies: phased arrays in the focal plane, digital BBCs, new correlator RFI mitigation

Communication network development in conjunction with IST thematic priority includes use of GEANT for specific high performance grids and testbeds I3 for e-EVN (together with GEANT, BT?, ….) -Networking activities (EVN) -Joint Research Project

Design studies feasibility studies+ technical preparatory work for a new infrastructure (1-10 M€) need clear European dimension and interest explore sources of finance for infrastructure eg EIB, Structural Funds SKA- technical and engineering development towards a 1% demonstrator - software development for simulations - cosmology ALMA – band 1 (0.5 M€)

Contribution to capital costs for development of new infrastructure which is already funded EC  max of 10% of total budget for the infrastructure to catalyse construction for development of technically advanced elements of the future infrastructure, eg instrumentation, connectivity, not buildings, logistics e-MERLIN

I3: Networking activities management - management will be significantly more autonomous than in FP5 - scientific and financial coordination; generation of reports; cost statements; monitor impact of I3 activities - will need to employ people specifically to manage the contract

I3: Networking activities develop synergies and complementary capabilities procedures for applying for observing time; proposal deadlines level of service to users coordinated use of major infrastructures e.g. EVN + MERLIN national radio telescopes instrumental and software developments

I3: Networking activities Meetings and workshops formal meetings of partners activity coordination meetings symposia, schools outreach Round Table meetings with other astronomy I3’s

I3: Networking activities Organisation of radio astronomy in Europe (Foresight Study) - transform I3 into European Council for Radio Astronomy - “centre for European Interferometry at radio wavelengths”? ALMA, e-MERLIN, e-EVN, LOFAR, SKA