EXPReS Annual Review April 17

Similar presentations


Presentation on theme: "EXPReS Annual Review April 17"— Presentation transcript:

1 EXPReS Annual Review - 2007 April 17
EXPReS Project Team JIVE, Coordinating Institution

2 09:00-09:30 Introductions / Overview
Agenda 09:00-09:30 Introductions / Overview 09:30-11:00 EXPReS Summary for Past 12 Months 20 NA1/NA2/NA3/NA4- Network Activities and Management 20 SA1- Production e-VLBI Service 20 SA2- Network Provision for a Global e-VLBI Array 20 JRA1- Future Arrays of Broadband Radio Telescop on Internet Computing 11:00-11:15 Break 11:15-11:45 External User: Benefits and capabilities of e-VLBI 11:45-12:30 Comments from E.C. on morning 12:30-13:15 Lunch 13:15-14:00 Financial Overview for Past 12 Months 14:00-15:15 Overview of project next 18 Months 15:15-16:00 Open Discussion 16:00-16:20 Reviewer Internal Meeting 16:20-16:30 First Feedback to the team 16:30 Conclusion / End of First Year Review 2007 April 17 EXPReS Annual Review

3 EXPReS- Looking Down SA2: Past 12 Month Review
Courtesy of Paul Boven and Google Maps 2007 April 17 EXPReS Annual Review

4 SA2- Network Provisioning
SA2: Past 12 Month Review SA2- Network Provisioning 19 institutions, operating 21 radiotelescopes Coordination of work and funding at participant national level First year is a learning experience, in particular for non-EU partners (China, Australia, etc) EC partial funding (8.75:1 in proposal) acts as a great catalyst of work and national funding Very uneven cost in Years 1-3 First year at very lower cost (most deliverables are no-cost feasibility studies) Some/more participants are able to obtain better deals for cheaper/free connectivity 10 telescopes connected 6 institutions Other infrastructures delivered in 2007 2007 April 17 EXPReS Annual Review 4

5 Site Connectivity 1 Gbps connected sites 10 Gbps connected sites
SA2: Past 12 Month Review Site Connectivity 1 Gbps connected sites 10 Gbps connected sites 2007 April 17 EXPReS Annual Review

6 EXPReS SA2 Workpackages:
WP1: Feasibility study of last-mile connection of telescopes to JIVE via GÉANT2 WP2: Provision of the infrastructure and equipment WP3: Connectivity tests Deliverables Feasibility studies Infrastructures ready for 9 sites Six telescopes operating routinely at 256 Mbps Milestones 2007 April 17 EXPReS Annual Review 6

7 Network structure SA2: Past 12 Month Review 2007 April 17
EXPReS Annual Review

8 EXPReS SA2 Achievements
EVN European institutions Previous to EXPReS SA2: Connection ready for JIVE to: Westerbork, Onsala, Torun, Jodrell Bank, Medicina, Metsähovi Feasibility studies: Finished for all EU sites: MPIfR, CNIG-IGN, Metsähovi, VIRAC MPIfR and CNIG-IGN will connect in 2007 Connectivity tests Medicina integrated in e-VLBI network in Aug 2006 Routine operations achieved up to 256 Mbps 2007 April 17 EXPReS Annual Review 8 8

9 EXPReS SA2 Achievements
EVN non-European institutions Feasibility studies Finished, but international part ongoing: ShAO, NAIC, HRAO Connectivity tests Planning tests for MRO, ShAO, NAIC Non EVN institutions Finished for non-EU sites, but international part ongoing: CSIRO, TIGO Planning tests for CSIRO 2007 April 17 EXPReS Annual Review 9 9

10 Connectivity status 2007 April 17 EXPReS Annual Review 10

11 Summary No major changes in deliverables.
Most partners have lower costs, as expected. Total SA2 cost lowered from 7.8 M€ to 6.9 M€ (savings of 0.9 M€). EC contribution is 0.8 M€. Feasibility studies (no cost item) finished for European partners; international part for non-EU partners still ongoing. Major infrastructures to be available in 2007 (MPI, CNIG). Good prospects for non-EU partners to reach Europe (CSIRO, HRAO, ShAO, TIGO, NAIC). 2007 April 17 EXPReS Annual Review 11 11

12 09:00-09:30 Introductions / Overview
Agenda 09:00-09:30 Introductions / Overview 09:30-11:00 EXPReS Summary for Past 12 Months 20 NA1/NA2/NA3/NA4- Network Activities and Management 20 SA1- Production e-VLBI Service 20 SA2- Network Provision for a Global e-VLBI Array 20 JRA1- Future Arrays of Broadband Radio Telescop on Internet Computing 11:00-11:15 Break 11:15-11:45 External User: Benefits and capabilities of e-VLBI 11:45-12:30 Comments from E.C. on morning 12:30-13:15 Lunch 13:15-14:00 Financial Overview for Past 12 Months 14:00-15:15 Overview of project next 18 Months 15:15-16:00 Open Discussion 16:00-16:20 Reviewer Internal Meeting 16:20-16:30 First Feedback to the team 16:30 Conclusion / End of First Year Review 2007 April 17 EXPReS Annual Review

13 Conclusion Questions/Answers Contact information T. Charles Yun Project Manager EXPReS (JIVE) tcyun at jive dot nl Additional Information [note: only one “s”] EXPReS is made possible through the support of the European Commission (DG-INFSO), Sixth Framework Programme, Contract #026642 2007 April 17 EXPReS Annual Review

14 Conclusion EXPReS 2007 April 17 EXPReS Annual Review