All the way with Section J Glazing CPD answers Michael Shaw, June 2011.

Slides:



Advertisements
Similar presentations
Doors and Windows.
Advertisements

WAYNE DALTON OF SYRACUSE PRESENTS:
Designing House Extensions - draft Supplementary Planning Document (SPD) for consultation Eleanor Parker, Development Management.
DEPARTMENT OF LANDS AND PLANNING ENERGY EFFICIENCY AWARENESS SEMINAR 2010 Building Code of Australia Building Code of Australia Regulatory.
INSULATION THICKNESS CALCULATOR. ENERGY EFFICIENCY PERFORMANCE PRINCIPLES THE BUILDING ENVELOPE Components that constitute the building envelope are:
Reading Assignment for next week: HCL Chapter 14 ELECTRIC LIGHTING.
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
eQuest Quick Energy Simulation Tool
Lesson Five – Alternative solutions and exercises
Q5- U-Value 2010 HL 5. (a) Calculate the U-value of an uninsulated external solid concrete wall of a dwelling house built in the 1950s given the following.
Tas seminar/demonstration on Part L 2006 of the Building Regulations Presented by Alan Jones EDSL February
Sustainable Architecture Presented by Caroline Batson Senior Architect and Sustainability Manager.
The Three Tiered Philosophy
Click to edit Master title style Cost optimal facade design solutions of office buildings Tallinn Martin Thalfeldt PhD student in TUT
Energy Efficient Glass Façade for building envelope Sri Ram.N – IGBC AP; GRIHA Trainer Saint Gobain Glass India 15 th June 2011.
Wayne Howatt 01. Welcome The Climate Challenge Director, Dearle & Henderson for Scottish FHE Institutions.
HEAT LOSS If the conservatory is not heated from the main heating system or it has an external quality door fitted i.e. double glazed patio or similar.
Building Australia’s Future Energy Efficiency Introductory Awareness Training AUSTRALIAN Greenhouse Office Supported by: Step by Step Application of BCA.
Space of solutions and generation of possible solutions ID seminar October Steffen Petersen PhD-student BYG.DTU and Birch & Krogboe.
Energy use in buildings Dr. Atila Novoselac Associate Professor Department of Civil, Architectural and Environmental Engineering, ECJ
Windows. Huge variety of available building components and several important roles Thermally most important they admit solar radiation Advantageous in.
Energy Conservation within walls. Energy conservation Energy cannot be created or destroyed but can simply be changed from one form to another. The more.
PASSIVE SOLAR DESIGN. Design Techniques
Upvc windows & Doors Safe, secure, strong & eco friendly.
Why we need to calculate heating load ?
BEM CLASS 5 Building Thermodynamics – 2 Air-conditioning Load Calculation – latent heat, solar and internal gains.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Current Floor Plan N. Marking C1 indicates that a load bearing steal beam is present at each end of the existing exterior wall which both need to stay.
Physical Sciences Complex at the University of Maryland 01Oct05 MAPP.
Tutorial 4: Response function method Q1. Outline the calculation steps of a time domain response function method. 1. A given heat transfer equation in.
GSA Early Concept Design Project – Energy Analysis
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
1 W14D2: Interference and Diffraction Experiment 6 Today’s Reading Course Notes: Sections
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
3. ORIENTATION  Building Shape  Ideal Elevations  Landscaping.
Site Location: Site Location: Gap Site at Bath Street and Pitt Street Plot: Plot: 50m x 50m Building Area: Building Area: 4000m 2 maximum Building Height:
Building Envelope. Physical separator between interior and exterior spaces – Walls – Floors – Roofs – Fenestrations (any opening in the structure) – Doors.
Introduction to BIM Module 02 – Building Envelope.
Environmental Controls I/IG
The IFS template uses the exact structure of the AFCFS narrative and is provided in Microsoft Word in a table format. The document is.
Solar Gain The ultimate free lunch!. Some Basics Why do we need to heat our homes? –Living rooms21 o C –Bedrooms18 o C –Staircases & halls16 o C.
Unit 17 Building Regulations Assessment Number 3 Date of issue : June 5 th 2015 To be submitted by: June 26 th 2015 This assessment provides an opportunity.
Energy efficient windows for sustainable development Copyright of Wispeco (Pty) Ltd.
Unit 17 Building Regulations Assessment Number 1 ‘History and Purpose’ Date of issue : March 23rd 2015 To be submitted by: April 29th 2015 This assessment.
Announcement: The Course Test is Net week ! On Wednesday, October 12 It starts at 1 pm sharp.
Final team building Presentation
(Multi-unit Residential Buildings)
Building Environmental Systems
Truss Heel Heights and Energy Code Requirements
Unit 6.05 and 6.06-Learning about blueprints
Maternity and Neonatal, Skin, Vision and Hearing Deep Dive Workshop Understanding “what to change” using the NHS Right Care methodology Part of the NEW.
Drawing & Building Names
Passive Solar system BY: MD.RUMAN 11131AA010.
FEASIBILITY STUDY Feasibility study is a means to check whether the proposed system is correct or not. The results of this study arte used to make decision.
Architectural Drafting
Conduction Cooling Loads
BIM Services in India - Conserve
City of Santa Cruz Accessory Dwelling Unit Development Program
Climate Based Daylight Modelling
Arch205 building construction Windows- glazed curtain wall, skylights
Roofs Chapter 7.
Temperature and Heat Loss
Prepared by: Joshima V.M.
Curtain walls Lightweight wall system installed in the exterior of building structures The name “curtain wall” derives from the idea that the wall is thin.
Neurological Services Deep Dive Workshop Understanding “what to change” using the NHS Right Care methodology Part of the NEW Devon Way.
BUILDING SCIENCE-1 TOPIC- ROLE OF WARM AND HUMID CLIMATE
Thermal Impact of Different Interior Finishing Materials on Energy Consumption YOGESH JATAV
Typical Building Orientations
Why we need to calculate heating load ?
Building standards Mr. Da Silva.
Presentation transcript:

All the way with Section J Glazing CPD answers Michael Shaw, June 2011

Conditioned space & Envelope Group exercise (p8) Your task: 1. a) define “building envelope” for the purposes of BCA Section J Answer: The parts of a building’s fabric that separate a conditioned space or habitable room from—fabricconditioned space habitable room (a) the exterior of the building; or (b)a non- conditioned space including—conditioned space (i) the floor of a rooftop plant room, lift-machine room or the like; and (ii) the floor above a carpark or warehouse; and (iii) the common wall with a carpark, warehouse or the like.carparkcommon wallcarpark Pp4-6

Conditioned space & Envelope Group exercise (p8) Your task: 1.b) highlight the envelope for this building on north elevation, plan and section Note: attendees at earlier seminar dates will have a similar design in their handouts pp4-6

Thermal envelope - Answer

Assessment activity - section Thermal envelope - Answer

Glazing calculator Group exercise Your task: 1.c) Define the level 1 north facing façade area in elevation and enter the relevant information into the glazing calculator Hint: privacy screens between balconies are full height walls and act to provide same or better shading than extending the horizontal slab overhang by distance P beyond window edge.

North façade – enter into glazing calculator

WWR north = 40% Façade area excludes assumed 200mm thickness of floorslab Note: Clear 6mm single glazing with an unbroken aluminium frame has been assumed as window type to complete the glazing calculator assessment

Glazing calculator Group exercise Your task: 2. Interpret the climate zone 1 glazing charts from EDG Note 66 and give an indicative glazing type that will achieve DTS compliance on the north façade without altering the shading overhang (balcony) or window size. Answer: overhang P/H~0.4, choose U=2.7. SHGC=0.30 gives WWR=35%, To maintain WWR of 40%, SHGC will be <0.30 Indicative glass type – Double glazed low-E with very dark tint

Glazing design for climate zone 1 Double glazing low-E

Glazing calculator Group exercise Your task: 3. a) Using the glazing design charts and any prior experience you have of the glazing calculator, sketch or suggest two ways that DTS compliance could be met by altering the geometry of the design and adopting glazing with a SHGC of 0.5 which will have much better visible light transmission properties. Some possible answers: Reduce area of glazing to the north façade Introduce motorised shading device to extend shading overhang when required (or simply widen the balcony above) Note: both of these answers can impact on daylighting in the space

Performance-based solution Group exercise Your task: 3. b) Assuming that you have been quoted $8,000 for JV3 and two weeks modelling time, how would you justify to this nation-wide client that a JV3 performance-based solution will deliver a better design and documentation outcome? Answer: DTS solutions will not achieve the daylight requirements in the brief, nor allow good design for the accommodation buildings (class 3) DTS solutions are different for different climate zones. Finding a JV3 solution that performs better than DTS in the harsh climate zone 1 is likely to achieve compliance in milder climates, 5 and 7 (standardising documentation and construction)

Performance-based solution Group exercise Your task: 3. c) Outline your ideas on the steps required in a design process to achieve a stress-free JV3 alternative solution Answer: Develop design ideas with an understanding of passive design principles and the glazing limitations imposed by the DTS requirements on each façade orientation Where major façade orientations are not using their full glazing area allowances, talk to a JV3 energy modeller about the possibilities of strategically exceeding the DTS requirements on key orientations Once design is largely complete, conduct preliminary modelling and only then apply for development approval