CERN Steve Kettell DUNE Collaboration Meeting January 12, 2016.

Slides:



Advertisements
Similar presentations
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
Advertisements

Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES Feasibility Study on a Common Analysis Framework for ATLAS & CMS.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
From Cave C to R3B: Time Schedule 2008 Experiments with upgraded setup: proton arm, Si detectors, QFS detection system 2009 Implementation of new readout.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Fundamentals of Information Systems, Second Edition
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
CERN LBNE Test Experiment. Plan view of Bat
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
Advancing GSMT SWG Recommendations: AURA’s Proposal to the NSF Stephen E. Strom AURA New Initiatives Office Presented to the GSMT SWG 12 February, 2004.
12/07/20101 Bidder’s Conference Call: ARRA Early On ® Electronic Enhancement to Individualized Family Service Plans (EE-IFSP) Grant and Climb to the Top.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
Page 1 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (1) Excellent job on preparing and presenting review Overall, the Committee feels that the.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Grant Agreement Documents (between Global Fund and Principal Recipient) Workshop for TB Experts Hosted by WHO Stop TB and the Global Fund December 2005.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Systems Analysis and Design in a Changing World, Fourth Edition
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
1 ND280m Overview of the activities T. Nakaya (Kyoto) Nov 7,
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
LHC CMS Upgrade Project CD-1 Alternative Selection and Cost Range Steve Webster Federal Project Director August 26, 2013 CD-1 Executive Session.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
U.S. Department of Agriculture eGovernment Program eDeployment Kickoff August 26, 2003.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
Cryostat Design Review Update Steve Kettell DUNE Collaboration Meeting – Technical Board January 14, 2016.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
PIP-II Resource Loaded Schedule (RLS) ---- Step Luisella Lari 13 May, 2016.
LBNC report to the PAC David MacFarlane, LBNC Chair January 20, 2016.
10 December Summary: Updating of the activities carried out on-site (Done) in NOVEMBER List activities on going (Next steps) and scheduled for DECEMBER.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
Challenges to get LBNF ready for Far Detector installation ASAP Elaine McCluskey ELBNF Proto-Collaboration Meeting 22 Jan 2015.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
WBS 1.05 Commissioning Detector Scope, Cost & Schedule Sven Vahsen University of Hawaii.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Opening Executive Session M.C.
CMS November Upgrade Week
10/month is the present production rate 2 FTE + sporadic contributions
2K CB FDR Overview:  Agenda, Charge, Review Process
Department of Licensing HP 3000 Replatforming Project Closeout Report
Mark McKinnon EVLA Project Manager
X-Ray Endstations Update
Project Management Issues John N. Galayda, SLAC April 24, 2002
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

CERN Steve Kettell DUNE Collaboration Meeting January 12, 2016

Key Recent Developments 2 CERN research board met in December and officially approved ProtoDUNE Single-Phase (now NP-04) following the SPSC recommendation MOUs signed between CERN and the DUNE project for ProtoDUNE Single-Phase responsibilities. MOU for WA105/NP02 signed DUNE announced an updated detector management structure incorporating both the single-phase and dual-phase prototyping efforts at CERN that will allow the collaboration to build on synergies between the two efforts JAN Steve Kettell DUNE UTA Collaboration Meeting

Updated DUNE Management Structure 3JAN Coordination across four detector organizations through Technical Board and Project Office Steve Kettell DUNE UTA Collaboration Meeting

Management Structure for Far Detector and its prototypes JAN Steve Kettell DUNE UTA Collaboration Meeting We recognize the need to incorporate NP02 and the dual phase far detector into the FD organization and are working towards this. This is a complex process. This outline shows a simplistic possible model Project Management (Stewart) TPC (Paulos, Yu) DAQ (Barr) Installation (Fowler) Photon (Buchanan) Cold Electronics (Hackenburg, Worcester) ProtoDUNE-SP (Chamizo-Llatas) ?? ProtoDUNE-DP (???) Correlated WG structure …

New ProtoDUNE Management Teams 5 The DUNE management teams who will coordinate ProtoDUNE activities at CERN have been mostly identified  ProtoDUNE Single-Phase Coordinators: Flavio Cavanna (FNAL) & Christos Touramanis (Liverpool) Deputy Coordinator: Thomas Kutter (LSU) Manager: Maria Chamizo Llatas (CERN)  ProtoDUNE Dual-Phase Coordinators: Dario Autiero (IPNL) & Takuya Hasegawa (KEK) Manager: TBD JAN Steve Kettell DUNE UTA Collaboration Meeting

Integration of ProtoDUNE Single-Phase and Dual-Phase Efforts 6JAN New management teams will meet at CERN soon to discuss how best to further integrate the two efforts Potential structure incorporating common working groups illustrated here Steve Kettell DUNE UTA Collaboration Meeting

ProtoDUNE Single-Phase Schedule 7JAN The management team has developed a high-level schedule for the next three years that defines the sequence of activities needed to construct, install and commission the detector on the timeline required for operation in 2018 Currently L3 managers are working to update the complete bottoms-up resource-loaded schedule Plan to deploy additional resources in the recently appropriated FY16 budget to speed up critical path activities Steve Kettell DUNE UTA Collaboration Meeting Parts at CERN Ready for beam 2018

ProtoDUNE in EHN1 8JAN Detailed schedule for all work needed to construct & outfit the experimental area, build & install the cryostats and cryogenics Installation of detectors occurs 4-6 months earlier than in current ProtoDUNE single-phase schedule (need to reconcile) Steve Kettell DUNE UTA Collaboration Meeting

ProtoDUNE Dual-Phase Schedule 9JAN ProtoDUNE dual- phase schedule for construction, installation and commissioning is consistent with the current EHN1 schedule EHN1, ProtoDUNE single-phase and dual-phase management teams plan to meet at CERN soon. Steve Kettell DUNE UTA Collaboration Meeting

ProtoDUNE TDR Development 10JAN CERN SPSC has asked the ProtoDUNE single-phase management team to produce a Technical Design Report The collaboration has set an internal deadline of early summer 2016 for producing this document New ProtoDUNE single-phase management team will take the lead on this task drawing heavily on the CDR and ProtoDUNE single-phase proposal A TDR describing ProtoDUNE dual-phase already exists at Steve Kettell DUNE UTA Collaboration Meeting

Summary 11JAN ProtoDUNE single-phase joins the dual-phase as official CERN experiments. The management team has been named to coordinate the activities at CERN The ProtoDUNE dual-phase effort is being integrated into DUNE, which will allow the collaboration to better coordinate the two EHN1 efforts and take advantage of synergies Immediate work  Engage additional collaborators in ProtoDUNE (effort needed soon)  Update integrated, resource-loaded schedule covering all activities  Assess use of additional FY16 funding to advance the production of critical path detector components  Develop overall and detailed QA/QC testing plan  Identify collaboration team for enacting testing program  Assemble the team on the ground at CERN who will install, commission and operate the detectors Steve Kettell DUNE UTA Collaboration Meeting