Drift Chamber Prototyping Plans at ODU Gail Dodge, Tom Hartlove, Mac Mestayer Nov. 18, 2005 Goals for FY06: Design 144 cell prototype of R1 Drift Chamber.

Slides:



Advertisements
Similar presentations
Straw tubes for forward tracking at the NLC O.K. Baker, K. McFarlane, V. Vassilikopolus Hampton University Arlington, TX Jan 9-11, 2003.
Advertisements

Zebulun Krahn Advisor: Curtis Meyer Technician: Gary Wilkin Carnegie Mellon University Straw Tubes and Hall D December 11-13, 2003 GlueX Collaboration.
20 June 2008E906 Collaboration Meeting1 Tracking Chambers for FNAL E906 Edward R. Kinney University of Colorado, Boulder, USA Overview of Station 1 Status.
Business Plan Preparation Frank Moyes Leeds School of Business University of Colorado Boulder, Colorado Operations & Development Strategy.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
4/25/11 G v3 1 Facility Modifications and Preparations (FMP) Technical Status Annual NSF Review of Advanced LIGO Project April , 2011 John.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications:
June 9, 2008What’s a Drift Chamber? Mac Mestayer Drift Chambers: The Science behind the Art What are they? how do they work? ionization of the gas by particles.
Neutron Structure Functions and a Radial Time Projection Chamber The Structure of the Neutron The BoNuS Experiment at CLAS A New Proton Recoil Detector.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Physics Requirements Current CDC Design R&D Items What We Have Achieved (Publications) What is Left Out? Summary and Conclusions JLC CDC R&D Status As.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
RESEARCH and DEVELOPMENT for CBM (at LHE JINR) Yu.V. Zanevsky Laboratory of High Energies JINR, Dubna - NEW INFRASTRUCTURE - FAST GAS DETECTORS - DIPOLE.
Update on TPC R&D C. Woody BNL DC Upgrades Meeting October 9, 2003.
TPC R&D status in Japan T. Isobe, H. Hamagaki, K. Ozawa, and M. Inuzuka Center for Nuclear Study, University of Tokyo Contents 1.Development of a prototype.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
GEM foil and Simulation work at CIAE Xiaomei Li Shouyang Hu, Jing Zhou, Chao Shan, Siyu Jian and Shuhua Zhou Science and Technology Science and Technology.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
Mac Mestayer DC12 Status: as of Feb., 2008 Decide on endplate, feedthrough, wire material –guidance from small prototype chambers mainly electrical stand-off.
Taku Gunji Center for Nuclear Study The University of Tokyo
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Main Drift Chamber Yuanbo Chen Ihep Motivation (MDC IV) The BGO crystal used in L3 will be used for BES III ’ s Calorimeter. The space for MDC.
Construction of Prototype B for the COMPASS-II Polarized Drell-Yan Experiment James Mallon of Abilene Christian University for the UIUC COMPASS Collaboration.
CLAS12 Drift Chamber Review Mechanical Engineering Presented by David Kashy – Hall B Lead Engineer.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
January 4, 2007 RHIC II Project Internal Cost Review Existing RHIC power supply Modifications Don Bruno & George Ganetis January 4, 2007 Power Supply Modifications.
CLAS12 Drift Chamber Prototyping
DC12: Tracking/simulation needs CLAS12 Drift Chambers – Physics specifications high efficiency at large solid angle (5 o to 40 o ; 50% f coverage.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Cancer Institute Frederick National Laboratory is a Federally Funded Research.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Review of Micromegas Tracking Detectors for CLAS12 – May 7, 2009 Reviewers: Madhu Dixit, Mac Mestayer Presentations covered the following topics: –detector.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications:
Construction and Characterization of a GEM G.Bencivenni, LNF-INFN The lesson is divided in two main parts: 1 - construction of a GEM detector (Marco Pistilli)
Early Career Internal Review Measurement of Double DVCS using SuperBigBite Spectrometer Nuclear Physics Alexandre Camsonne.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
The SNS Power Upgrade Project Building on the Success of the SNS Accelerator Deployment Kevin Jones Research Accelerator Division Director.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Drift Chamber Review Jefferson Lab 6-8 March 2007 CLAS12 Drift Chamber Electronics R. Chris Cuevas Group Leader -- Fast Electronics Jefferson Lab Physics.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
MIG Welding Manufacturing and Materials Processes.
BABAR  &  L. de Brunhoff Drift Chamber System BABAR Drift Chamber Project Co-System Managers D.B.MacFarlane, McGill University A.J.S.Smith, Princeton.
Status of TRIUMF Prototype Studies Christopher Hearty University of British Columbia/IPP May 31, 2010.
ENGINEERING SUPPORT FOR FINAL YEAR PROJECT STUDENTS. SCHOOL OF ENGINEERING.
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
G. Finocchiaro – INFN LNF XI SuperB General Meeting DCH-I parallel session LNF, 1 December 2009.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
Instrumented Wheel For Wheelchair Propulsion Assessment. Jacob Connelly Andrew Cramer John Labiak.
CLAS12 Forward Tracking: Status and Challenges
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
Final Results of Drift Cell Simulation and Parametrization
Structure and etc Shoji Uno (KEK) at B2GM
WBS: : Tracking for CLAS12
Drift Chambers for CLAS12 -Mac Mestayer
Region I: stringing 1/3 done on 1st chamber!
Overview of the Frascati Production Facilities
CLAS12 Tracking Design (ca. 2005) a basic design parameters
CDC Structure S. Uno KEK
L&V Manpower Development Prepared by: HR department Mar, 2013
Extraction Michael Bevins May 17, 2007
Presentation transcript:

Drift Chamber Prototyping Plans at ODU Gail Dodge, Tom Hartlove, Mac Mestayer Nov. 18, 2005 Goals for FY06: Design 144 cell prototype of R1 Drift Chamber for CLAS12 Build chamber and begin testing - late spring and summer 2006 Risks to be Addressed: Electrical Standoff Issues (larger sense wire means higher electric fields) Small cell size - circuit board design Gas mixture - quenching capabilities with lower CO2 percentage? Mechanical stability - high hole density; tension transfer

Current Status Tom Hartlove (ODU) is working on conceptual design He has also contacted vendors and brought the original R1 (CLAS) prototype to ODU Seeking advice from George Jacobs and Steve Christo on gas bag attachment and removable posts Plan is to build 144 cell prototype using full size endplates

Current Design Assumptions Cell size is 0.57 cm (1/2 the distance from one sense wire to the next) Stereo Angle:  6 degrees Determined from assumptions: R1 chamber is 203 cm from center of target 112 cells per layer covering 5 to 35 degrees 12 cells 6 cells

Description and Requirements of the Project Cost Estimate: $60,000 Labor: –Conceptual Design: Tom Hartlove (ODU) –Final Mechanical Design: Jlab? –Circuit Board Design: Jlab? –Procurement and Construction: ODU –Testing: ODU –ODU Manpower: Tom, Gail, postdoc (Stephen Bueltmann), 1 grad student or undergrad –Software: Write as needed Other Requirements: support structure, stringing fixtures and support materials, testing equipment, cleanroom Facilities at ODU: 5000 sq ft. lab, including machine shop, clean room, electronics testing and repair equipment…