Movable beam pipe and NNC Study & prototype development Manchester 14/12/20091D. FP meeting.

Slides:



Advertisements
Similar presentations
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Advertisements

A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Very Forward Detectors Workshop on beam position monitoring and detector alignment.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
HAMBURG BEAM PIPE POSSIBLE LAYOUT AND MANUFACTURING JANUARY 2012.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
AFP-HPS /03/ D. D. INFN To/CERN PH UCM HPS240. Integration of Moving Beam Pipe and detector box. 1. Re-collection Layout of moving beam pipe.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
The integration of 420 m detectors into the LHC
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
TE-CRG Activities D. Delikaris, TE-CRG.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Proposal for Microstation Prototype Jaak Lippmaa CERN 2005.
SPS High Energy LSS5 Thermal contact & cooling aspects
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Vacuum System P. Chiggiato TE-VSC
Installation Global System
HL-LHC IT STRING and Series test of SC link
Jaak Lippmaa HIP, Helsinki University
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Roadmap for triplet cryostats
Alignment of VSC components along LSS 1&5
LHC schedule.
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Challenges of vacuum chambers with adjustable gap for SC undulators
LHC Experimental Vacuum Systems Status October ‘07
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
From Design to Installation courtesy R. Folch S. Atieh TS / MME
Upgrade Strategy for the Experimental Vacuum Systems
The 11T cryo-assembly: summary of design and integration aspects
Cryomodule Assembly Plan
Presentation transcript:

Movable beam pipe and NNC Study & prototype development Manchester 14/12/20091D. FP meeting

AFP NCC & Detector Station Manchester 14/12/2009D. FP meeting2

Cold/Warm Transition Manchester 14/12/2009D. FP meeting3

Manchester 14/12/2009D. FP meeting4 NCC Summary A full design of the new connection cryostat (NCC) to replace the present empty cryostat has been produced by EN-MME, based on LHC designs and standard components. The design has been reviewed by the relevant groups in the accelerator department and is estimated to cost 1.5 MCHF for assembly in CERN workshops. A final design effort of 6 months is required to produce and validate all manufacturing drawings according to the LHC QA procedures. The manufacturing time for the first cryostat is estimated to be about 1 year. Preliminary installation scenarios have been discussed with the LHC transport and installation responsible and an overall cryostat and room-temperature beam sector installation plan has been drawn up. The installation and commissioning of the detectors and services does not interfere with the modification of the LHC cryostat and creation of the room temperature beam sector.  These activities including installation of Hamburg beampipes can therefore be planned during scheduled LHC shutdown periods. A considerable amount of cabling between the detector location and the experimental area is needed for the vacuum and beam monitoring instrumentation as well as for the detector services.  This activity could ideally be carried out before the installation of the cryostat

Manchester 14/12/2009D. FP meeting5 Exchange of connection cryostat Time required for cryostat replacement:~ 5 months 1.Warm up 1 month 2.Replace CC~ 8 weeks a.Dismantle interconnect5 days b.Recondition interconnect5 days c.Install new cryostat5 days d.Interconnect cryostat5 days e.Internal leak test before1 week f.El. Test, alignment5 days g.Global leak test, pressure test3 weeks 3.Bake out 3 weeks 4.Cool down 1 month 5.Cold test 1 week Time required for cryostat replacement:~ 5 months 1.Warm up 1 month 2.Replace CC~ 8 weeks a.Dismantle interconnect5 days b.Recondition interconnect5 days c.Install new cryostat5 days d.Interconnect cryostat5 days e.Internal leak test before1 week f.El. Test, alignment5 days g.Global leak test, pressure test3 weeks 3.Bake out 3 weeks 4.Cool down 1 month 5.Cold test 1 week

Abstract The purpose of this note is to define a Work Package for the moving beam pipe activity related to the FP420 experiment R&D and executed by the EN/MEF Group in its capacity of coordinating and integrating the LHC experiment-machine interface. PREPARED BY : K. Potter D. Swoboda CHECKED BY : S. Baird R. Folch R. Losito M. Lamont E. Ciapala R. Jones J.M. Jimenez O. Bruning R. Jones Approved by : V. Vuillemin P. Collier J.-J. Blaising S. Myers S. Bertolucci FP420 movable beam pipe design, fabrication and installation in LHC Manchester 14/12/20096D. FP meeting

Scope This work package consists of the design, fabrication, test and installation of a movable beam pipe (Hamburg beam pipe) in the LHC machine at 220 m from the IP as well as at a later stage in the NCC (New Connection Cryostat) at 420m. Part of this beam pipe will have a reduced cross-section with a thin window to which the detectors will be attached. An important function of the beam pipe is to allow the integration of the detectors by providing precision alignment references and a mechanical support structure. The mechanical support of the beam pipe will be instrumented so as to allow a very precise lateral movement of the pipe during LHC operation in order to approach the detectors to the particle beam. The complete installation will consist of 4 Hamburg pipe sections to either side of IP1 and IP5; i.e. at 220 m and 420 m from IP1 and at 240 m and 420 m from IP5. Manchester 14/12/20097D. FP meeting

Positionning System The positioning system for the FP420 detectors will require a close cooperation with EN-STI and EN-MME groups relying on the experience of LHC collimator control system. As far as possible the motorization and control for the LHC collimators should be integrated in the movement system for the Hamburg beam pipe. The potential risks for the FP420 detectors due to beam accidents and the consequences for the machine need to be evaluated and safety procedures need to be implemented. In particular, a risk analysis addressing the following issues will be necessary: Evaluation of the possible accident scenarios. Evaluation of the consequences for the detectors and for the machine. Definition of the safety procedures to minimize the risk of beam accidents and the consequences both for the detectors and the machine (beam instrumentation such as BLMs and BPMs, interlocks, operation…). Simulation of the energy deposition on the thin window for the various beam accident scenarios. The results from the above studies shall also be used by FP420 as input for functional specifications of the control system. Manchester 14/12/20098D. FP meeting

HH pipe concept sketch Manchester 14/12/20099D. FP meeting

1st brain storming Manchester 14/12/200910D. FP meeting

Manufacturing Technology MaterialLN316 (forged?) Machiningfrom block Thin windowlongitudinal 150 micron transvers 500 micron Assemblyvacuum brazing Unit cost< 10 kCHF Manchester 14/12/200911D. FP meeting

Bellow Test Setup Parts required Assemble 2x VMAAA and 2x VMAAC with a transition pipe in between. Clamped to 2 end plates (End plates to be moved between Compressed bakeout state and Nominal operating state for each test. Test 1. Compressed bakeout state length VMAAA at 280mm and VMAAC 180mm. Test 2. Nominal operating state length VMAAA at 300mm and VMAAC at 200mm. Teflon sheet under feet to reduce friction. Dial gauge fixed onto opposite side of chamber to give an accurate reading of movement. 10kg Spring scale which is connected on one side to the transition pipe and the other to a 12mm threaded rod this is inserted into a fixed block which can be wound gradually so movement can be measured against the force required. Manchester 14/12/200912D. FP meeting

Bellow Test Assembly Manchester 14/12/200913D. FP meeting

Displaced chamber Manchester 14/12/200914D. FP meeting

Bellow Test Result mm Travel Force required (kg) Compressed bakeout stateNominal operating state Manchester 14/12/200915D. FP meeting

Deplacement Force Manchester 14/12/200916D. FP meeting

RF finger contact 5mm10mm15mm20mm25mm Relaxed state100%92%75%70% Nominal state100% Manchester 14/12/200917D. FP meeting

Preproduction Beam pipe WP Manufacturing technologies are available System should be assembled from standard LHC components Cost remains rather modest Schedule: design, production, test 2010 Installation 2011 Scope: demonstrate feasibility, transparancy to LHC use as detector test bed? Manchester 14/12/200918D. FP meeting