1 AFP-HPS 240 15/03/2011 1 D. D. INFN To/CERN PH UCM HPS240. Integration of Moving Beam Pipe and detector box. 1. Re-collection Layout of moving beam pipe on New connection Cryostat 2. Beam Vacuum requirements 3. FP420 Beam Pipe design 4. New single window Beam pipe for HPS 5. Beam Position monitor integration on BP 6. Si tracker package 7. Detector box 8. Bellows 9. Motorization 10. HPS Prototype Work Package Torino ( Mechanics)

2 AFP-HPS 240 15/03/2011 2 D. D. INFN To/CERN PH UCM Layout

3 AFP-HPS 240 15/03/2011 3 D. D. INFN To/CERN PH UCM

4 AFP-HPS 240 15/03/2011 4 D. D. INFN To/CERN PH UCM

5 AFP-HPS 240 15/03/2011 5 D. D. INFN To/CERN PH UCM FP420 Moveable Beam Pipe Integration in New connection Cryostat

6 AFP-HPS 240 15/03/2011 6 D. D. INFN To/CERN PH UCM FP420 Moveable Beam Pipe on support table.

7 AFP-HPS 240 15/03/2011 7 D. D. INFN To/CERN PH UCM BEAM VACUUM REQUIREMENTS High conductivity copper internal coating, tapered angle< 15. Need close collaboration with CERN RF and AT/VAC experts Mandatory discussion on material and design from very early stage of conception.

8 AFP-HPS 240 15/03/2011 8 D. D. INFN To/CERN PH UCM

9 AFP-HPS 240 15/03/2011 9 D. D. INFN To/CERN PH UCM Coutesy of UC Louvain F.Benoit, K.Piotrzkowski Latest Prototype realized. Two pockets are now laser welded. FP 420 Beam Pipe (UC Louvain)

10 AFP-HPS 240 15/03/2011 10 D. D. INFN To/CERN PH UCM HPS 240 Beam Pipe. Torino Proposal Single thin window. Length 450mm. Machined by Wire Electro erosion from SS 316 LN solid bar. Present design of thin windows similar (20x20mm) to FP420 BP. Details to be discussed with CERN groups. Beam Position Monitor integrated by laser welding. STATUS: Material from CERN Store (following AT/VAC specification) already delivered in Torino mech. Workshop. Update design of thin windows, Flanges and BPM interface. FE Analysis. Validation. WEDM Machine available from mid April.

11 AFP-HPS 240 15/03/2011 11 D. D. INFN To/CERN PH UCM HPS Beam pipe design –DRAFT-- 1

12 AFP-HPS 240 15/03/2011 12 D. D. INFN To/CERN PH UCM HPS Beam pipe design –DRAFT-- 2

13 AFP-HPS 240 15/03/2011 13 D. D. INFN To/CERN PH UCM HPS Beam pipe design –DRAFT-- 2 det.

14 AFP-HPS 240 15/03/2011 14 D. D. INFN To/CERN PH UCM Courtesy Ray Thompson and Manchester Group. Si detector package. Layout for FP420. Manchester group. TO DO: Silicon board design to be defined. Design. To be adapted to HPS240. Cooling still to be defined and integrated

15 AFP-HPS 240 15/03/2011 15 D. D. INFN To/CERN PH UCM Silicon 3d mounting proposal (FP420) Conical seat Flat seat V groove seat Synthetics ruby balls Carbon bearing system Carbon blades support on cap and synthetics ruby balls fixed on detector frame. Components act as reference system and thermal insulator. Cooling feedthroughs Electrical feedthroughs

16 AFP-HPS 240 15/03/2011 16 D. D. INFN To/CERN PH UCM Detector Box V2---DRAFT-- This New Detector Box host Quartic or Gastof and Silicon Tracker. Internal dimensions are: 230 x 510 x 125 (mm) The enclosed volume is vacuum tight (secondary vacuum). Definition of detector dimension, required services and feed trough is to be defined.

17 AFP-HPS 240 15/03/2011 17 D. D. INFN To/CERN PH UCM BELLOWS

18 AFP-HPS 240 15/03/2011 18 D. D. INFN To/CERN PH UCM Specification: Stainless steel AISI 316L or AISI 316Ti. Vacuum tight. Bake out to 250 C Lateral offset +/- 31mm Quantity 16 pcs. Life cycle expectancy >>10.000 cycles Bellows with intermediate tube allows extensive lateral movements minimizing stress. In this studio diameter is over dimensioned, D=107,4mm, to allows integration of RF screen. In case RF screen result not necessary, internal diameter can be reduced to 96mm; 93mm; or 85mm. Bellows Studio. Witzenmann Standard corrugated tube. (CERN Supplier) RF screen to shield the bellows from the beam? Develop design in close collaboration with AT/VAC. Validate and finalize design and manufacture to realize a prototype for tests. INFN To

19 AFP-HPS 240 15/03/2011 19 D. D. INFN To/CERN PH UCM Motor and controls hardware (lvdt, stops) are assumed to be the same of collimators. Nevertheless some aspect are not yet clear. Auto retraction in garage position in case of hardware or control failure may require feature not compatible with the present layout. A preliminary risk analysis is necessary to assess the validity of adopted solution. Motorization and controls.

20 AFP-HPS 240 15/03/2011 20 D. D. INFN To/CERN PH UCM Beam Position Monitor on Moveable Beam Pipe. The Beam Position Monitor on the Moveable Beam Pipe Station is now integrated on the Beam Pipe. In the figure a body of BPM used in LHC beam instrumentation is adapted. This body has been suggested as the most likely adaptable to our scope (FP420). Finalization of Beam Pipe design require also definition of this component. We need to re-establish contact in BE/AT group.

21 AFP-HPS 240 15/03/2011 21 D. D. INFN To/CERN PH UCM INFN Torino Prototype WP’s Collaboration.. INFN Torino group is involved from the very preliminary (2005) R&D studies of feasibility on FP420. We can offer collaboration on integration, engineering, design, manufacture, dimensional controls, assembly and installation of moving beam pipe and Si detector package. In particular concerning the realization of a complete prototype for HPS 240, we can take care to design and manufacture a new beam pipe with detector box, body of Beam position monitor, interfaces for motorization and supporting table.

22 AFP-HPS 240 15/03/2011 22 D. D. INFN To/CERN PH UCM Integration of various components still need effort to be effectively defined. Close collaboration with CERN group is mandatory and necessary to finalize the design. Collaboration with AFP would be very useful In Torino we can start production of aprototype beam pipe from April. Still many detail need to be agreed and finalized. Thanks. Conclusion.

23 AFP-HPS 240 15/03/2011 23 D. D. INFN To/CERN PH UCM Wire electrical discharge machining (WEDM) Some of the advantages of EDM : Complex and high precision shapes that would otherwise be difficult to produce with conventional cutting tools Wire-cutting EDM is commonly used when low residual stresses are desired. There is no direct contact between tool and work piece. Therefore delicate sections and weak materials can be machined without any distortion. A good surface finish can be obtained. This WEDM will be delivered in Torino Mech. Workshop by end of March. Max. Workpiece dimension: 1050 x 500 x 600 (mm)

24 AFP-HPS 240 15/03/2011 24 D. D. INFN To/CERN PH UCM Coordinate Measuring Machine (CMM) Poli Galaxy Maxi CMM Material: Granite Construction Capacity (mm) : X 2300; Y 1200 ; Z 1000. Accuracy: 0.005 mm Software: DEA PC-DMIS ® Mitutoyo CRT Apex C574 Material: Granite Construction Capacity (mm) : X 505; Y 705 ; Z 405. Accuracy: 0.001 mm Software: DEA PC-DMIS ® ZEISS Accura II (INFN PD) Material: Granite Construction Capacity (mm) : X 1200; Y 900 ; Z 700. Accuracy: 0.002 mm Software: Calypso Equipped with Active Extension Stylus