Monitoring and DSF CEO, 11 May 2016 Nexus Workshop, Melia, Hanoi, Vietnam.

Slides:



Advertisements
Similar presentations
Mekong River Commission (MRC) Impact Assessment Tools and Processes on Water and related Resources Regional Workshop to Review GEO/IEA Training Manual.
Advertisements

FASRB and the Water Risk Management Samo Grošelj Deputy Secretary, ISRBC.
MRC Strategic Plan. Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain.
International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Le Duc Trung Acting Secretary.
Adaptation to Climate Change in Vietnam Opportunities and Barriers Nguyen Mong Cuong Institute of Meteorology and Hydrology Hanoi - Vietnam
The Mississippi/Mekong Partnership. The Mekong River looking toward Laos.
Towards a sustainable development in the Sava river basin Dejan Komatina, Ph.D. Civ. Eng., Secretary, ISRBC.
Mohammed Bila and Ahmed Sedick Lake Chad Basin Commission CBLT Si ége Rond Point de Grand Armees, Ndjamena Republic of Chad
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
THE SPANISH CLIMATE CHANGE ADAPTATION PLAN José Ramón Picatoste Ruggeroni Oficina Española de Cambio Climático Ministerio de Medio Ambiente GENERAL FRAMEWORK.
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
Integrated Watershed Management
Approaches and Mainstreaming of Ecosystem-based Adaptation in Europe International workshop “Mainstreaming an ecosystem based approach to climate change.
Planning with floods in the Lower Mekong Basin. 1/28 The agenda Regulation.
1 1 The Mekong basin development planning process Ton Lennaerts CTA Basin Development Plan Programme JRP training 8 June 2012.
MRC Water Utilisation Programme 20 May 2003 Knowledge Base & DSF Software Presenter: Dr Jon Wicks, Software Integration Specialist in association with.
Using the DSF to assess scenarios Some things it will do for you - and some things it won’t.
Transboundary Water Cooperation & Climate change Some important points.
TIDE & Natura 2000: A partnership for sustainable tidal river development? Antwerp, 18 February 2010 François Kremer European Commission DG Environment,
Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain unchanged Goals updated.
Marine Protected Areas, Ecosystem-based Adaptation: Building a Resilient Network of Partnerships Ruth Blyther Director, Eastern Caribbean Program Anne.
2 International efforts to coordinate Mekong water development started in 1920s – Series of international agreements mainly for navigation and boundary.
CLIMATE CHANGE AND WATER MAKING RIVER BASIN MANAGEMENT PLANS “CLIMATE PROOF” IN SPAIN.
UNDP-GEF Dnipro Basin Environment Programme1. 2 Dnipro basin map.
Approaches and Mainstreaming of Ecosystem-based Adaptation in Europe International workshop “Mainstreaming an ecosystem based approach to climate change.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
1 Basin Development Plan BDP : Planning process & tools to identify, categorise & prioritise joint or basin-wide projects and programs VISION : Contribute.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
16 th meeting of the EUWI EECCA Working Group Impacts of climate change on water resources in Moldova and possible adaptation measures. Trans-boundary.
2 HISTORY OF MEKONG COOPERATION IRBP Course PP 2.4.
Water Framework Directive and the SRDP Jannette MacDonald Land Unit, SEPA.
1 Integrated Water Resources Management Training Course Overview p.p. 0.1.
© Michel Roggo / WWF-Canon Danube Region Strategy Conference, 04 March 2011, Budapest Danube Region Strategy – nature conservation aspects Gábor Figeczky,
2 HISTORY OF MEKONG COOPERATION IRBP Course PP 6.1.
The Mekong River Commission Presented by Mr. Detsada Soukhaseum, Mekong River Commission Secretariat, 16 November 2015.
River Basin Management in Southern Africa Barbara Schreiner.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
EXPERIENCES OF THE MEKONG RIVER COMMISSION IN FLOOD MANAGEMENT AND MITIGATION IN THE LOWER MEKONG BASIN Petrina Rowcroft Development Economist Basin Development.
Meteorological & Hydrological data for water resources development.
Joint MRC- Russia Conference on the Exchange of Experiences in the Sphere of Water Resources Management November 2015, Moscow, Russia Water Quality.
Joint MRC- Russia Conference on the Exchange of Experiences in the Sphere of Water Resources Management November 2015, Moscow, Russia Monitoring.
The Male’ Declaration Proposal for Phase III. Looking back to think ahead Policy Dialogue Background Materials Ministerial agreement Capacity building.
The Mekong River Commission: Challenges, Mission, and Strategies.
Mekong River Commission Meeting the Needs - Keeping the Balance MRC Water Utilization Programme: GEF International Waters Project (GEF/World Bank)
Flood Task Force Report to the 4th Meeting of the Parties 20 to 22 November 2006 Bonn.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
1 Integrated Water Resources Management Training Course Overview p.p. 0.1.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
Mekong River Basin Transboundary Waters Management: Innovative Tools for Collaborative Decision-making World Water Forum March 21, 2009.
The Mekong River Commission: Challenges, Mission, and Strategies.
Mekong Water Utilization Project (WUP) GEF IW C4 August 1, 2007.
India Development Strategy (FY2012–FY2016) ADB India’s Country Partnership Strategy (2013 – 2017) ADB’s Long-Term Strategic Framework (Strategy 2020)
SE Asian freshwater fish population and networks: the impacts of climatic and environmental change on a vital resource Rita Santos 1*, Ian Cowx 2 and Daniel.
Mekong River Commission, Tools to Implement the 1995 Agreement - Dr Choomjet Karnjanakesorn, WUP Team Leader 28-Apr-17 Mekong River Commission (MRC) Water.
Western Balkan Climate Resiliance Workshop Vienna, May 11-12, 2016 Influence of Climate Change on Water Sector in B&H Ministry of Foreign Trade and Economic.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
Strategy Note on Economic Cooperation for Mekong Subregion The World Bank’s contribution to the GMS Water Resources Management March 2007.
Civil Protection Financial Instrument – Prevention Projects
Advancing South-South Cooperation for Effective Implementation of
The EU strategy on adaptation to climate change
Gender mainstreaming in environmental
River Basin Management Plans
22nd WG D Meeting, 15/4/2012 Jacques Delsalle, European Commission
A Blueprint to safeguard Europe’s Water Resources
LIFE and the implementation of the Water Framework Directive
The EU Strategy for Adaptation to climate change
Enhancing WMO and CEOS COLLABORATION
Presentation transcript:

Monitoring and DSF CEO, 11 May 2016 Nexus Workshop, Melia, Hanoi, Vietnam

Lancang-Mekong Basin Confidence in making decisions Additional infrastructures Further economic development Extra money for water and environment management Mitigation of socio- economic and environmental impacts Best way to balance different interests, risks and opportunities among neighbor countries

Mekong River Commission (MRC) Monitoring System 1995 Mekong Agreement Sustainable Mekong Water Level and Rainfall 49 hydro-meteorological stations 17 mainstream 32 tributary Every 15 minutes Sediment and discharge measurements - Since 2009 Water Quality - 48 sites Ecological Health - 41 stations since 2011 Social Impact - Social impact and vulnerability assessment since 2011 Fisheries – since mid 1990 Abundance, diversity, lee trap, dai, larvae drift, prices

The MRC Near-realtime Hydro-met Stations Network have been established in There are 49 stations located in Mekong Basin including: 2 stations in China and 47 stations located in LMB countries. MRC river monitoring map have been developed in 2012 for monitoring water level, precipitation, flood and low flow situation in the basin. It provides the information on flood situation in every 15 min as available at: time-monitoring-map Near-Real Time Monitoring System

Discharge and Sediment Monitoring Project Project started in 2009 Hydrologic & sediment monitoring at 17 sites includes: At Mainstream – 10 river sites: Chiang Saen to Kratie – 2 tidal sites in Mekong – 2 tidal sites in Bassac – 1 site in Tonle Sap At Tributary – 1 tributary (3S)

MRC Modelling under a Decision Support Framework (DSF) DSF since 2001, 3 elements Knowledge base Basin modelling package Impact assessment tools DSF Aim Transparent modelling system Use by member countries Check proposals and strategies for water resource developments Being used to assist basin modelling and to assist impacts Assess over the Mekong basin Changes of flow Sedimentation Nutrient Modelling package - most important and official tools for MRC and member countries in decision making during national and regional planning

MRC Use of Monitoring Data and DSF Intensively to produce assessments Basin Development Scenario assessment to formulate the Basin Development Strategy (BDS) Climate Change and Adaptation Initiative (CCAI)’s basin-wide assessment of climate change impacts to formulate the Mekong Adaptation Strategy and Action Plan (MASAP) Study on sustainable management and development of the Mekong River, including impacts of mainstream hydropower projects (the Council Study) Impacts of projects on hydropower, navigation, flood protection etc. Most recently - the Vietnam’s Study of the Impacts of Mainstream Hydropower on the Mekong River (the Delta Study)

MRC Information System – MRC-IS Facilitate and manage the data and information exchange and sharing mechanism for the implementation MRC related activities Information, data and knowledge management services to the public Established during 2005 under the framework of Procedure for Data and Information Exchange and Sharing (PDIES) The core data are drawn from the NMCs and/or other official in- country databases or from the existing MRCS databases and monitoring system “National Information Systems (NIS)” has been successfully established in each member country National database systems are interlinked with MRC-IS database system.

Publications & Products Primary Custodians, MRC Programmes/Projects Models, Tools, and Applications MRC Programmes and Member States Analysis, Planning & Decision Supports MRC Web Portal MRC - Information System (MRC-IS) QA/QC Integrated MRC MekongInfo

Summary Monitoring, data and information sharing, decision support framework help improving our understanding and minimizing the socio-economic and environmental impacts We must invest in continuous maintenance and development of our monitoring and decision support services Further strengthening the monitoring and assessment systems is being done in parallel with decentralizing the monitoring and assessment functions that the member countries have sufficient capacity to handle We continue developing tools to monitor and assess fisheries and hydrology relationship, fisheries yield per habitats, species vulnerability to climate change, shift of bioclimatic zones due to climate change, socio-economic impacts and vulnerability to climate change, etc. We welcome further cooperation and partnerships with you to strengthen DSS for water & environmental management