Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Agency Board June 20, 2013 Update on the Davis-Woodland Water Supply Project.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Test Slant Well Construction Cost Estimate 1 Slant Test Well - Drilling & Installation$2,300,000 Material Advance Purchase - Pump, Column, Casing, Screen$700,000.
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
ESTIMATING By Laith Jacob.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.
Agency Board February 20, 2014 Update on the Davis-Woodland Water Supply Project.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
1. Review of RFP Project Goals RFP Time Line Project Schedule RFP Type Project Budget 2. Questions? 3. Tour of New Site 4. Tour of Existing Facilities.
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
ESPLOST Update Savannah-Chatham County Public Schools May 2, 2007.
LOS OSOS WASTEWATER PROJECT UPDATE March 4, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES CHILLED WATER & COMPR. AIR PIPING Thomas F. Joos, P.E. Lead Civil/Structural Engineer CFAC Review November 9-10, 2009.
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
City of Palm Coast, Florida City Council Meeting October 2, 2012.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
Update on RCR Permitting
Time is money. Use yours wisely. Bryan McCabe, PE | Pender County Utilities J. Ray Cox, PE | Highfill Infrastructure Engineering.
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing October 13, 2015.
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Construction Management At Risk Process
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
CAPITAL FACILITIES PROGRAM UPDATE BOARD OF EDUCATION FEBRUARY 8, 2016 FACILITIES SERVE EDUCATION.
Richland Creek Water Supply Program Update and Design-Build Contract for 48” Raw Water Pipeline Paulding County, Georgia Board of Commissioners Workshop.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.
Richland Creek Water Supply Program Status Update Paulding County, Georgia Board of Commissioners Work Session January 26, 2016.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing May 26, 2015.
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
Richland Creek Water Supply Program Bid Recommendations Paulding County, Georgia Board of Commissioners Work Session February 23, 2016.
Richland Creek Water Supply Program Briefing
EC II SLC Update July 2017 Q2 Project Update
January 18, 2017 City of San Diego
Northwest Area Mobility Study FasTracks Monitoring Committee
Green Line Extension Project
Sun City Lift Station Odor Control Improvements
Kings Bluff Raw Water System Parallel Raw Water Main Project
Construction Oversight
Cottonwood Recycled Water Pipeline (West)
107th & 110th Avenue North Public Utilities Renewal Projects
Paulding County, Georgia
The Paulding County Richland Creek Reservoir (RCR) and Water Supply Program Speaker: Mark.
August 28, 2018.
PROJECT DELIVERY METHODS
Southern Delivery System
Delta Water Supply Project
Richland Creek Water Supply Program Program Update
Presentation transcript:

Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016

2 Update on Reservoir Design Received comments back from Safe Dams Conducted Peer Review (Schnabel Engineering) Contractor Procurement RFQs received for Prequalification of Dam Contractor, Grout Injection, Slurry Wall Bidding among prequalified contractors will take place in May Construction Installation of USGS Monitoring Station is complete Tree harvesting and initial site grading contract awarded and will begin in March Selected Dam contractor will begin construction in July / August

3 USGS Monitoring Station Installed and Online Required by Permit to be installed in advance of any construction activity Continuous flow and water quality analysis Installed by USGS

4 Elevated Monitoring Station Tower Gage and Probe Installation in Richland Creek Instrumentation Enclosure and Solar Array

5 Satellite Communication System for Station Instrumentation Within Secure Enclosure

6 USGS Monitoring Station Installed and Online Continuous Data available online through USGS website Link also provided off of RCRWater.com

7 Update on 61 Entrance Road and Timber Harvest Contractor Procurement Contracts Awarded 02/23/16 Construction Timber harvest will begin this week Entrance Road Contractor will begin construction in late March and will be complete in August

8 Update on WTPs and Pump Stations Design Design will be at 100% in mid March EPD Drinking Water Program Permitting is being initiated Contractor Procurement CMAR has issued 15 RFQs for specialty subcontract packages. Received 69 submissions, currently prequalifying CMAR Contractor will receive bids in May GMP CMAR Contractor to submit GMP in May for approval. Will go to WSAB and BOC in May / June Construction Construction will begin in late August Program Manager

9 Update on Raw Water Pipeline Design Beginning process of easement acquisition Design is at 30% and will begin to advance Finalized scope at Airport area Construction Construction will begin in Late 2016 and will be complete in late 2017 / early 2018.

10 Update on Finished Water Pipeline and BPS Design Received 11 proposals from Engineers Interviewed, shortlisted, and selected Recommendation to WSAB and BOC in March Design will take approximately 10 months Construction Contractor Procurement in early 2017 Construction will begin in March of 2017 and be complete in March 2019

11 Update on Public Outreach Continued involvement of RCR Stakeholder Communication Implementation Team Artwork and Mascot Competition were a success and preparing to announce winners Provided Briefing to Cities Hiram, Cartersville, Braswell, and Emerson Rotary Club Scheduled for this week Bill Insert / Newsletters Program Website – RCRWater.com Steady Activity – Responding to calls and questions submitted via website

12 Preparing for Bond Market Project ElementCost Reservoir $ 70,300,000 WTPs and Pump Stations $ 98,800,000 Raw Water Pipeline $ 9,400,000 Finished Water Pipeline and BPS $ 36,500,000 Total Program $ 215,000,000 Costs shown include design /CM, construction, easements, mitigation, and program management  Positive (low fuel) and Negative (competing construction) factors in the marketplace  Ultimate cost could be +/- 5%  Financial plan has conservatism so that even a 5% overage will not effect rates  Currently $ 20 Million under contract and within budget. Will have Reservoir and Water Treatment Plant under contract by June so approximately $180 Million will be under contract prior to going to bond market  County currently selecting Financial Advisor

13

14 New Business Item 1 – Arcadis Amendment Planned contract amendment / within budget Time and Materials contract Current contract with Arcadis for Dam and WTP design services goes through Design Services This amendment covers the following 1.Additional Design Services 2.Engineering Services During Construction 3.Materials Testing (Piedmont Geotechnical) 4.Construction Inspection Services

15 New Business Item 1 – Arcadis Amendment 1.Additional Design Services: Design for the GA 61 improvements and of a joint access road to provide access road Additional design services working with the CMAR contractor to provide value engineering and reduce overall project construction cost. ($20 million savings) Early competitive selection of treatment technology Additional design services to support the permitting process

16 New Business Item 1 – Arcadis Amendment 2.Engineering Services During Construction For the dam and WTP Projects – 3 year duration Will review shop drawing submittals (Anticipated to be 500+) Respond to Request for Information (RFIs)from Contractors Issue design clarifications during the construction process Review and contractor requests for substitution Attend monthly progress meetings

17 New Business Item 1 – Arcadis Amendment 3.Materials Testing (Piedmont Geotechnical) For the dam and WTP Projects Concrete cylinder testing Grain size analysis Soil Moisture content and compaction testing Monitoring of dewatering systems Dam soil testing Dam Grout injection monitoring and testing

18 New Business Item 1 – Arcadis Amendment 4.Inspection Services for Dam, WTP, an Pump Stations Construction Manager at WTP and Dam (Arcadis) 4 Inspectors (Piedmont) 3 Inspectors (Arcadis)

19 New Business Item 1 – Arcadis Amendment ScopeCost Additional Design Services $ 947,000 Construction Phase Services (including materials testing) WTP $ 2,866,000 Construction Phase Services (including materials testing)- Dam $ 3,052,000 Construction Phase Services (including materials testing)- Road $ 121,000 RPR Inspection Services – WTP $ 600,000 RPR Inspection Services – Dam $ 407,000 RPR Inspection Services – Road $ 30,000 CM / Resident Engineer Services $ 792,000 Total $ 8,815,000

20 New Business Item 1 – Arcadis Amendment Requested Action: Authorization of an amendment to the Arcadis Design Services Contract for additional design services, services during construction, materials testing, and inspection services for the Richland Creek Water Treatment Plant and Dam in the amount of $8,815,000.

21 New Business Item 2 – Additional Raw Water Piping at the RCR Raw Water Pipeline Project Planned contract amendment / within budget Design Build team of Garney Construction/Croy Engineering awarded a D/B contract in late 2014 for 13,600 lf of Raw Water Pipeline 4,700 additional feet at the river not included at the time due to uncertain future plans of Cartersville Airport

22 New Business Item 2 – Additional Raw Water Piping at the RCR Raw Water Pipeline Project Cartersville Airport plans have progressed to allow setting of final alignment Includes design, geotech, and construction of 4,700 lf of 48” pipe Delay in issuance of 404 delayed release of original pipe, original ductile iron pipe faced 2 escalations (totaling 18%) Pipeline material change to Steel reduced cost by $705,000

23 New Business Item 2 – Additional Raw Water Piping at the RCR Raw Water Pipeline Project Requested Action: Authorization of the amendment to the Garney Design Build Contract for the design and construction of 4,700 linear feet of 48” diameter pipeline associated with the Richland Creek Water Supply Program in the amount of $2,750,000.