MICE Step IV Commissioning: Overview (March-April 2015) Milorad Popovic MAP 2015 Spring Collaboration Meeting.

Slides:



Advertisements
Similar presentations
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
Advertisements

MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
MICE FAC Alain Blondel 1 Summary of run meeting 8 August 2011 Present: Andy Nichols Tim Hayler Pierrick Hanlet Gail Hanson Linda Coney Victoria.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
UK Costs Beam & Infrastructure Coils Tracking Detector.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
CMPB Alain Blondel 14 April STATUS OF MICE.
May 12, 2004 TJR1 Effects of Upstream ParticleID Counters on MICE Good-Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE MICO Alain Blondel 23 December MICE Commissioning needs 22 December 08.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
EMR detector lying beam-face up in Geneva workshop.
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
Alain Blondel 4 April  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II.
MICE – UK Plan Roy Preece STFC RAL DOE Review of MAP Brookhaven National Laboratory 13 th August 2014.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
MICE S TEP IV P HYSICS ‘D ELIVERABLES ’ V. Blackmore MAP 2014 Spring Meeting 30 th May, /15 AKA “What will we learn from Step IV?”
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Muon Ionization Cooling Experiment - MICE HEPTech - Grenoble 4-5 th June 2015 Tom Bradshaw STFC, Rutherford Appleton Laboratory.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
MICE Project in the US: Completion of Efforts
Report on EUCARD WP6: MICE Transnational Access (TA)
Controls & Monitoring in MICE
Presentation transcript:

MICE Step IV Commissioning: Overview (March-April 2015) Milorad Popovic MAP 2015 Spring Collaboration Meeting

Step IV, September 2015

Rutherford Appleton Laboratory UK, Oxford. February

MICE Hall, 22-Apr-2015 PRY-South Focusing Coil Upstream Solenoid Downstream Solenoid

Installation Sequence, Step IV

MICE-April Beam Run For March & April we had Run Plan to run six weekends with the Muon/Pion beam. First weekend ISIS was down for whole day Saturday Second weekend it was Easter Holyday Third weekend Decay Solenoid was “quenching” at 120Amps Fourth weekend DAQ system was not operational Fifth week we got permission from ISIS to run weeknights, detectors start collecting data Sixth week every detector except Tracker was functional This shows that MICE is real physics experiment, controlled Chaos that on the end had all elements working

International Partners

MICE Is International Collaborative Effort Of 65 Physicists From 16 Institutions: 11 Universities 5 National Laboratories (FNAL, BNL, LBNL, RAL, IHEP) 9 Counties (USA, UK, Italy, Switzerland, Nederland, Bulgaria, Serbia, China, Japan) 3 Continents (North America, Europe and Asia)

This MICE Run was set of Heroic Efforts: Daresbury People fixed Decay Solenoid Power Supply and magnet system stop “quenching” Ed Overton rewired DAQ so some data was taken with “old trigger system” and Yordan had some sort of kayaking weekend in France not totally destroyed Yordan came from Geneva and rewired from Tuesday to Friday completely new trigger, DAQ system Durga spent days & nigths doing (end redoing) TOF calibrations Francois Drielsma fixed EMR HV power supply problems Paolo Franchini spend days & nigths in control room and hall helping Francois Henry Nebrensky trained ~15 new/old shifters Pierrick Hanlet worked literally 12 hours 7 days for 5 weeks

Ionization Cooling Demonstration Components RF Cavity Tracker&Solenoid Focusing Coils Focusing Coils LHD Absorber Matching Coils