ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.

Slides:



Advertisements
Similar presentations
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Advertisements

PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Orifice Plate Meter Error Stuart Gibbons, Extraordinary Offtake Arrangements Workstream Meeting: 16 October 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Offtake Metering Errors Stephen Skipp Asset Manager (Transmission and Storage)
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
MP0131: Meter Error Notifications Liz Spierling – July 4 th 2007.
IGT Single Service Provision Requirements Update – 27 th March 2013.
User Emergency Contact Details Simon Trivella –28 th May 2009 Distribution Workstream.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 Modification Proposal 0199: Clarification around the application of the UNC Dispute Resolution Process Alison Chamberlain National Grid Distribution.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
PN UNC Workgroup Read Validation 4 th October 2011.
1 Mod Review Group 126 Apr 2007 slides 126 Review Group – Restriction of Invoice Billing Period  These slides describe the business rules for the treatment.
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.
1 Modification 0152V Implementation Matters 25 October 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
CONFIDENTIAL - Modification Proposal 0395 © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Horndon Temperature Error (SMER)
RBD NOTIFICATION PROCESS
Code Governance Review UNC Modification Proposals
Market Trials ChMC 8th August 2018.
Action 0002: Meter Error Notifications
Revised registration for unregistered sites
Incentives 26 September 2018.
0433: Inclusion of the Transmission to Distribution “System Operator Agreement Guidelines” within the Offtake Arrangements Document.
Project Nexus Workgroup
UNC Modification 0335 – Offtake Metering Error Payment Timescales
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Modification 0117 – Additional Considerations
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Stefan Leedham 22 November 2007
PROJECT NEXUS FUNDING – THE CUSTOMER’S VIEW
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Project Nexus Workgroup
MOD 640 INVOICING VALIDATION RULES
MP0131: Meter Error Notifications
Stefan Leedham Transmission Workstream 2nd November 2006
CONFIDENTIAL - Inter Shipper Discussion Process Initial Discussions © 24 November 2009 EDF Energy plc. All rights Reserved.
UNC MOD 213: USER PAYS GOVERNANCE ARRANGEMENTS
Mod 209 – Rolling AQ.
Project Nexus Workgroup
PN UNC Workgroup (AQ topic)
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Xoserve Draft UIG Incentives Modifications 20 May 2019
Presentation transcript:

ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights reserved. RbD NOTIFICATION TRIGGER Stefan Leedham Offtake Arrangements Workstream 16 May 2007

NOTIFICATION TRIGGER Stefan Leedham 16 May 2007 © Copyright EDF Energy plc. All rights reserved. PAGE: 3 CURRENT NOTIFICATION ARRANGEMENTS 1.Meter Error Identified 2.Downstream and upstream transporters resolve any issues with the error 3.The error and resulting reconciliation are presented to the industry as a “fait accomplis” with little manoeuvre for discussion or analysis

NOTIFICATION TRIGGER STRAWMAN Stefan Leedham 04 April 2007 © Copyright EDF Energy plc. All rights reserved. PAGE: 4 RATIONALE BEHIND STRAWMAN To provide a notification process that enables all of those impacted to be involved from the earliest opportunity To build upon current UNC requirements To provide opportunities for all those involved to discuss the issues and resolve any potential issues before they develop into disputes To build upon discussions within 131 review group Not to place an artificial constraint on the process

NOTIFICATION TRIGGER STRAWMAN Stefan Leedham 04 April 2007 © Copyright EDF Energy plc. All rights reserved. PAGE: 5 CURRENT UNC REQUIREMENTS OAD Section D (a): The downstream Party shall provide the Validation Report to the upstream Party in the case of an NTS/LDZ Offtake: (i) no later than 14 days after the completion of any Routine Validation; and (ii) no later than 12 hours after the completion of any Exceptional Validation; OAD Section D 5.2.4: The downstream Party shall, not later than 14 Days after the carrying out of the relevant validation, provide to the upstream Party the corrected readings together with an explanation of the basis on which the readings were corrected and supporting information. OAD Section D 5.3.5: The downstream Party shall, not later than 5 Days after the identification of the relevant fault, provide to the upstream Party the estimated readings together with an explanation of the basis on which the readings were estimated and supporting information.

NOTIFICATION TRIGGER STRAWMAN Stefan Leedham 04 April 2007 © Copyright EDF Energy plc. All rights reserved. PAGE: 6 NOTIFICATION TRIGGER 1. Meter Error Identified Regular Updates Provided to Distribution Workstream & Billing Ops Forum & Offtake Arrangements Workstream Are these the correct forums? Should the updates be on a monthly basis? Targeted Communication for errors greater than [20] GWh 2. Submission of Validation Report to Upstream Transporter Targeted communication to RbD Shippers – what information should be included in this? Creation & meeting of a Notification Group to discuss information requirements, size of error etc. Use of Offtake Arrangements Workstream to facilitate/act as the Notification Group 3. Submission of a Meter Error Report to Upstream Transporter Stage 2 to be completed prior to commencement of stage 3 Trigger for commencement of formal process similar to mod review 643 process

NOTIFICATION TRIGGER STRAWMAN Stefan Leedham 04 April 2007 © Copyright EDF Energy plc. All rights reserved. PAGE: 7 PARTICIPANTS 1. Regular Updates to Distribution Workstream & BOF & Offtake Arrangements Workstream Distribution workstream & BOF & Offtake Arrangements Workstream attendees & relevant Transporters RbD impacted shippers for larger error communications 2. Submission of Validation Report to Upstream Transporter RbD impacted shippers & relevant Transporters Notification Group open to all interested parties 3. Submission of a Meter Error Report to Upstream Transporter RbD impacted shippers & relevant Transporters

ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights reserved. THANK YOU