How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Project Procurement & Contract Administration Jiwei Ma
 Contracts  Subcontracting  Suppliers  Complaints  Corrective and preventive actions (CAPA)  Internal audits  Management reviews Management requirements.
1 Belene NPP Project Configuration Management Presented by Alexey Matveev Varna, May
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
SIEP HSE Management System
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Project Bidding Procedures Enhancing Data and Presentation Skills for Engineers EDASPE Writing the RFP Training Courses – July 2004.
Marcy Mealy Procurement Specialist CDBG Program
Contractor Safety Management
ESTIMATING By Laith Jacob.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Permit to Work Procedure Document Number: KOC.SA.004
Procurement Presentation Alan Brett Contracts Officer HSE.
PROCUREMENT PLAN States should prepare Procurement Plan for the entire outlay approved by the PAB for the State Component and all the Districts. The Procurement.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
UKAS Key facts National Accreditation Body in the UK Self-funding private company limited by guarantee (Non-profit distributing) 180 full time staff.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
From Research Prototype to Production
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
SPED Certification Program September 17, 2003 Houston, TX.
Governmental Procurement ISQA 440 Goals of Procurement Steps in the Procurement Cycle Specifications and Work Scopes 1.
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
Specification & Quantities Estimating
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
FOURTH EUROPEAN QUALITY ASSURANCE FORUM "CREATIVITY AND DIVERSITY: CHALLENGES FOR QUALITY ASSURANCE BEYOND 2010", COPENHAGEN, NOVEMBER IV FORUM-
CONSTRUCTION CONTRACTS DOCUEMENTS
Appendix 8b. PUBLISHED STANDARDS RELATED TO OUR ACTIVITY.
The International Leaders Forum Moscow, 16 th March, 2007 Andy Alexander Vice President, Upstream Supply Chain Management TNK-BP Management Promoting Fair-play.
Public Procurement Uinsinn Finn Galway County Council Roads, Transportation, Marine.
Office of Procurement Services.  Vendor Application Website: 
RECOMMENDATIONS ON IMPROVEMENT OF PUBLIC PROCUREMENT SYSTEM Experts: Bazakeeva Jyldyz Jamanchaevna Abdymomunona Saina Ryskeldievna Recommendations were.
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
1 A Seminar On Pharmaceutical Outsourcing A Seminar On Pharmaceutical Outsourcing.
How to Win Council Business: A Guide to the Procurement Practice in Local Government.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
IAS Pre-proposal Conference December 10, 2012 Pre-proposal Conference December 10, 2012 San Antonio bldg 1 & 4 Renovation san antonio, tx Project no: San.
FINAL PROJECT 7TH SEMESTER ARCHITECTURAL TECHNOLOGY AND CONSTRUCTION MANAGEMENT M ARTA G AGO P ENALBA PROJECT : 32 DWELLINGS IN VEJLEVEJ.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
Quality Management: Mutually beneficial supplier relationships.
NHCA Education Series Contractor Pre-Qualification CSST
ISO/IEC
Tender Evaluation and Award Process
Administration of a FIDIC Contract - Project Control
Evaluation Grids Evaluation Grids.
Call for competition process
UNIT V QUALITY SYSTEMS.
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
PURCHASING AND SUPPLY MANAGEMENT
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
9/18/2018 Bids CONTRACTING Khamis…..
Quality Management Systems – Requirements
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
UNDERSTANDING FOR STANDARD
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Lecture 10 PROCUREMENT Ferdinand FASSA.
How to build your Integrated
Presentation transcript:

How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / ,

Main Tender Pre-Qualification Evaluation Criteria Experience The Contractor (or Consortium or Joint Venture and nominated subcontractors) shall show it’s experience and competence in EPC type contracts related to IT installation in the last 5 years. It is advantageous if the construction area is in the Country. The Contractor (or Consortium or Joint Venture and nominated subcontractors) shall show it’s experience and competence in Design, Procurement and Construction of similar integrated IT projects, which in addition …. It is advantageous if the construction area is in the Country. The key competencies shall be in IT. The Contractor shall have successful completed a number of projects in the last 5 years.

Main Tender Pre-Qualification Evaluation Criteria Resources and Organization The Contractor shall show, that his organization and sequences are clearly defined. It is advantageous (or mandatory) if there is a third party ISO 9000 accreditation certificate. The major Subcontractors shall have also a clearly defined organization. It is advantageous if there is a third party ISO 9000 accreditation certificate. The Contractor shall show, that there is enough currently employed staff, the mobilization time is short enough to reach a high performance from beginning and that the expected workload will it enable to finish the project in the scheduled time. The contractor shall provide an organization chart indicating the corporate structure from parent company. It is advantageous if the corporate structure is in place for several years. The resources available to the contractor in shall be adequate to the expected scope of work. CV’s of the key personnel approval

Main Tender Pre-Qualification Evaluation Criteria Health Safety and Environment The contractor shall submit a copy of Contractor’s HSE policy and provide an HSE manual, including performance measurement and targets. The Contractor shall show the specific related activities. The Contractor shall show, that he will do anything to execute critical activities appropriately. Environment Management The Contractor shall confirm that he has an Environmental Management System and shall describe how the system is documented.

Main Tender Pre-Qualification Evaluation Criteria Quality Assurance The Contractor shall have a third party registration of his quality assurance system (ISO 9000, QS 9000, BS 5750, etc.). The responsibility for quality management shall be clearly defined. There shall be an adequate number of employees in quality control.

Main Tender Pre-Qualification Evaluation Criteria Legal and Financial The Contractor shall show, that his annual turnover is more than four times higher than the expected Contract value. A Confirmation that the contracting entity is willing to accept a contract under the Country law shall be provided. Performance Bond (e.g. 5% of Contract Price), Construction all Risks Insurance Time Schedule and Penalty Milestones

Main Tender Pre-Qualification Evaluation Criteria Procurement The Contractor shall demonstrate his knowledge of the local market. The Contractor shall show there is value added in the Country (e.g. manufacturing, deployment of local resources). The Contractor shall have clearly defined working practices and procedures – in English

Main Tender Pre-Qualification Evaluation Criteria Joint Venture and Subcontracting Plan The Contractor shall show for each category that the a. m. criteria are also valid for a consortium or Joint Venture. The Contractor shall show a clearly defined organization also for the Consortium / Joint Venture and Subcontractors. Training of Subcontractors

Main Criteria and their Weightings Main Criteria WeightingAcceptable minimum Experience35%24% Resources / Organization 30%21% HSE5%3% Environment Management 5%3% Quality Assurance5%3% Legal and Financial10%6% Procurement5%3% Joint Venture / Subcontracting Plan 5%3% Total100%66%

Contract Document The Work shall be carried out by the Contractor in accordance with the following documents which, together with any documents incorporated by reference therein, shall form the Contract: C-1Form of Agreement (including Appendix "The Contract Schedule") C-2Special Conditions and Addenda C-3General Conditions C-4Scope of Work C-5Schedules of Prices C-6Specifications C-7Local Staff Employment Schedule (if required) C-8Procedures for Contractors C-9Health, Safety and Environment Specifications C-10Data Provided by Contractor - (Total number of pages …………) The Contractor hereby declares to have full knowledge and understanding of the content of all documents whether contained or referred to in the Contract. Local Conditions…

C-4 Scope of Work PROJECT MANAGEMENT CONTRACTOR’S ORGANISATION (Company Audits, Trainings) FACILITY (provided by Contractor) PROJECT INTERFACES (very important) PERMITS, CONSENTS AND LICENCES (how to manage interfaces with local facilities, authorities, etc.)

C-4 Scope of Work ENGINEERING GENERAL REVIEW OF COMPANY DESIGN AND DOCUMENTATION DETAILED ENGINEERING CALCULATIONS DRAWINGS MATERIAL REQUISITIONS SPECIFICATIONS SOIL AND SITE SURVEY REPORTS PROCEDURES AND OTHER DOCUMENTS FINAL DOCUMENTS COMPANY MONITORING OF DESIGN FACTORY ACCEPTANCE TESTS TECHNICAL SUPPORT

C-4 Scope of Work PROCUREMENT GENERAL COMPANY ACCEPTED VENDORS MATERIALS AND EQUIPMENT STANDARDS AND CODES LOCAL FABRICATION PROCUREMENT MANAGEMENT AND PROCEDURES MANUAL PURCHASE ORDERS PROCUREMENT DOCUMENTATION INSPECTION AND VERIFICATION EXPEDITING PACKING AND TRANSPORTATION SHIPPING RECEIPT, UNLOADING, INSPECTION AND STORAGE MATERIAL CONTROL AND INVENTORY SPARE PARTS LOCAL QUOTATIONS WARRANTIES STANDARDISATION VENDOR ATTENDANCE RECONCILIATION COMPANY PROVIDED ITEMS

C-4 Scope of Work CONSTRUCTION GENERAL SURVEY – Knowledge of local Conditions !!! EXISTING FACILITIES ACCESS ROADS CIVIL WORKS MECHANICAL WORKS ELECTRICAL WORKS INSTRUMENTATION LOCAL CONTROL AND TELEMETRY TELECOMMUNICATION CENTRAL CONTROL TESTING AND PRE-COMMISSIONING COMMISSIONING AND COMMISSIONING ASSISTANCE FINAL CLEAN-UP GUARANTEE RUN

How to prepare successful Bids Opportunity assessment Assessing client needs and building a relationship Meeting the evaluation criteria Differentiating yourself from your competitors Understanding the bid cycle Assembling bid information/ bid team Bid strategy, tactics and management Pricing and quality issues Proposal development Post submission actions

How to succeed in International Tenders End of Presentation. Thank you for attention.