Public Input Meeting April 16, 2012. Meeting Schedule Housekeeping Meeting Schedule – Open House – 6:00-6:30 pm – Presentation – 6:30-7:00 pm – Q&A –

Slides:



Advertisements
Similar presentations
The Center for Houstons Future? Energy Corridor District.
Advertisements

Great Western Corridor Feasibility Study
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Cowlitz Regional Trails Plan. Introduction Cowlitz County Parks Facilities Plan Cowlitz County Parks Facilities Plan Cowlitz County Bikeway Plan Cowlitz.
City of Toledo Bancroft Street Neighborhood Public Meeting November 20, 2013.
The Virginia Capital Trail
Titusville to Edgewater Bike Loop PD&E Study
State of Morrisville Mayor Mark Stohlman July 17, 2014.
From – A Report of the Connecticut Regional Institute for the 21 st Century by Michael Gallis & Associates, 1999 (known as the “Gallis Report”) Knowledge.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Southern Corridor Study Recommendations March 16, 2011.
US 101 Corridor Mobility Master Plan Agenda Item B-1 San Luis Obispo Council of Governments Board Meeting August 6, 2014 – B-1.
Cardener River Corridor Guiding Principles Diversity of Economic Development Scale of Growth –Incentives for Infill and Re-use –Appropriate to existing.
Environmental Assessment Public Meeting
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Contact: Beth Morris
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Building Healthy Communities “ Healthy Places and Healthy People Go Together” Kate Whitehead, BS Tim Scandale, BS Selina Rooney, RCDC Funded through a.
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Future Transportation Projects within the Loxahatchee River Basin Florida Department of Transportation District IV 3400 W. Commercial Blvd W. Commercial.
1 Matadero Creek Trail Midtown Resident Association April 16, 2013.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Matt Schueler Civil Project Management & Programs
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Greenways and Shared-Use Paths Lesson 19 Publication No. FHWA-HRT
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
Prepared by: ROBA KANDEEl بسم الله الرحمن الرحيم.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
“Connecting Our Communities” January 6, Mission “To encourage the creation of trails and greenway corridors, parks, and preserves in order to enhance.
 FRLP Proposed Boundary Line Adjustment: Confluence Virginia What life have you if you have not life together? There is no life.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Greenways enhance the visual character and walkability of.
Floyds Fork Greenway Presentation of Greenway Concept & Trail Alternatives: Public Meeting #2 June 13, 2007.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
1 AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment cards PRESENTATION 6:30 PM.
23 rd Avenue Corridor Greenway Community Open House November 6, 2013.
The Great California Delta Trail Planning Process for Contra Costa and Solano Counties Technical Advisory Committee Meeting January 2010.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
County of Fairfax, Virginia Department of Transportation VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps Board Transportation.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
BLACKWATER HERITAGE STATE TRAIL By Vernon Compton November 13, 2015 Emerald Coast Transportation Symposium.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
White County Greenways Trails and Byways Presentation.
Donaldsonville Returning to the River November 22, 2005 Presented to: The City Council of Donaldsonville and The Master Plan Committee Prepared By: In.
Lake Marion / South Creek Greenway Project Introduction December 2012 Lake Marion / South Creek Greenway Project Introduction December 2012.
Tonight’s Schedule Introduction Presentation Question and Answer Session Open House Staff at displays to answer questions Complete comment cards and/or.
STEERING COMMITTEE JANUARY 24, INTRODUCTIONS 2 WHO IS ON THE PROJECT TEAM?  Dakota County Regional Railroad Authority  Ramsey County Regional.
HB 277 Regional Transportation Sales Tax Preliminary Project List Presentation Mayor and City Council Work Session March 1, 2011.
Public Input Meeting November 13, Meeting Schedule – Open House – 6:00-6:45 pm – Presentation – 6:45-7:15 pm – Open House – 7:15-8:00 pm.
Introductions Army Corps of Engineers Metro Parks Mayor’s Office HDR Engineering, Inc.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
Introductions U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR, Inc.
Introduction U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR, Inc.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Open Space, Trails, and Greenways Planning Study Pleasant Valley Recreation and Park District March 28, 2013.
Wake County Comprehensive Parks & Recreation Master Plan.
City of Snoqualmie Tokul Roundabout Project April 10, 2012.
The Central Avenue Connector Trail
Vermillion River Greenway - Hastings MASTER PLAN
Presentation transcript:

Public Input Meeting April 16, 2012

Meeting Schedule Housekeeping Meeting Schedule – Open House – 6:00-6:30 pm – Presentation – 6:30-7:00 pm – Q&A – 7:00-7:30 pm – Open House – 7:30-8:30 pm

Introductions U.S. Army Corps of Engineers Metro Parks Mayor’s Office Metro Council District Representatives HDR Engineering, Inc. Corn Island Archaeology Redwing Ecological Services

Study Purpose This Study Will……. Evaluate Routes for a Conceptual Shared-Use Path – National Turnpike at Fairdale Road to Floyds Fork at Bardstown Road – Provide a Recommended Alignment for the Louisville Loop Identify Potential Ecological Restoration Opportunities – Pond Creek Watershed – Floyds Fork Watershed

Meeting Purpose Louisville Loop Summary Other projects in and around Study Area Describe the intent of this Study Gain input on potential trail route variations Gain input on natural and socio-economic resources in the study area Outline future steps of the planning process

Louisville Loop Summary

RiverWalk and Levee Trail

Ohio River Levee Trail Extension Louisville Loop from Farnsley-Moremen to Watson Lane

Scoop on the Loop Loop Related Projects – CDC Wayfinding and Signage Master Plan – Louisville Loop Design Guidelines – Southwest Greenways Master Plan – Olmsted Parkways

21 st Century Parks - Floyds Fork

Floyds Fork Broad Run Park

Pond Creek Corridor

Scoop on the Loop Projects around the Loop – National Turnpike widening from Fairdale Rd. to S. Park Rd. – Mt. Holly Rd. Widening – Blue Lick Road widening from I-265 to Preston Hwy. – Interchange improvements at I-265 and Preston Hwy. – Preston Hwy. intersection improvements at Commerce Crossing/Cooper Chapel – Cooper Chapel Rd. Section I – Cooper Chapel Rd. Section III – Beulah Church Rd. widening – Mt. Washington Rd. Section I – Mt. Washington Rd Section II – McNeely Lake Park Master Plan – McNeely Lake Park Access Improvements

National Turnpike / Mt. Holly Rd

Blue Lick Rd, Preston/I-265 Interchange, Commerce/Preston/Cooper Chapel

Cooper Chapel Rd. Section I

Cooper Chapel Rd. Section III & Beulah Church Road widening

Mt. Washington Rd, Section I and II

McNeely Lake Park Master Plan

Project Overview Provide a conceptual shared-use path and ecological restoration plan from Fairdale to Floyds Fork

Evaluate Existing Conditions Cultural, Historical, Archaeological Resources Rights of Way Land Use Land Ownership Physical Barriers – Streams, Roads, Railroad Utilities Topography

Trail Alignment Concept A planned paved and shared-use recreational trail that will serve as a major recreational and transportation feature for the nearby community and region. Trail uses will include walking, biking, hiking, and horseback riding. – Trail variations – Trailheads with parking – Pedestrian, bike, and transit access points to neighborhoods, parks, community facilities and schools

Louisville Loop Standards

Natural Environment Physical Environment Social Environment Economic Environment The Approach: Four Fundamental Elements

Process - Segments

Process – Alternative Alignments

Process – Preferred Alignment

Background – Previous Studies 2008 – Pond and Mill Creek Feasibility Study

Background – Previous Studies 2008 – Pond and Mill Creek Feasibility Study

Ecological Restoration Along tributaries of Pond Creek and Floyds Fork Categorize functional benefits to the natural and human environments.

Future Participation Opportunities Preliminary Plan Development (segments) Preliminary Plan (alignments) Preliminary Final Plan (recommended alignment)

QUESTIONS?