Staff Presentation to the Portland Design Commission June 2, 2016 CITY OF PORTLAND, OREGON 1st Design Review Hearing 16-134889 DZM Block 20 Residential.

Slides:



Advertisements
Similar presentations
PROJECT EMERALD SKYLINE
Advertisements

Module 3 SMART PARKING. Module 3 Smart Parking Introduction This is one of seven Transit Oriented Development training modules developed by the Regional.
Example of an Appropriate Development Concept for the Hine Junior High School Site This concept is an example of how the site could be developed for the.
Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
The Rivage Site corner of Ridge, Kelly and Calumet at the Falls Bridge.
2 Existing building 1 story metal 1972 Water Street CFA TechWorks! - Site Plan - Photo Index Number indicates photographer location Caption describes.
Advisory Committee Meeting April 16, :30pm Downtown Livability Initiative.
Planning & Community Development Department 245 South Los Robles Avenue Predevelopment Plan Review City Council December 8, 2014.
City of North Richland Hills TOD Code Overview. Comments from November 20 Work Session Need to ensure the preservation of key historic assets in the Smithfield.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
City Council 2642 Second Street Appeal of Landmarks Commission Approval of Certificate of Appropriateness 07CA-009 February 12, 2008.
HRB Meeting June 9, 2015 City Council Remand of AP 14-02/ZC
Draft Zoning Code Residential Focus Neighborhood Meeting May 8, 2007.
Shireen Abdelrahman Lecture 5. Individual development projects - new construction, expansion, or renovation - can affect the surrounding environment in.
City of New Brighton Planning Commission Meeting October 18, 2005 Agenda Item: 6A (Public Hearing) Special Use Permit for Detached Garage Exceeding 624.
Planning & Community Development Department 277 North El Molino Avenue Predevelopment Plan Review City Council Meeting May 5, 2014.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Board of County Commissioners PUBLIC HEARING Village Planned Development Code (Horizon West) April 28, 2009 Board of County Commissioners PUBLIC HEARING.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
Westside Revised Draft Community Plan and Development Code.
New Brighton Planning Commission Meeting March 21, 2006 Public Hearing: Special Use Permit (06-004) for a porch addition at th Avenue NW.
Astoria Riverfront Vision Code Assistance The City of Astoria, Oregon Planning Commission Work Session October 28, 2014.
Design Standards in Saint Paul Proposed Design Standards Zoning Amendments December 16, 2009 Department of Safety & Inspections / Department of Planning.
Design Standards in Saint Paul Proposed Design Standards Zoning Amendments October 16, 2009 Department of Safety & Inspections / Department of Planning.
Historic Review Board Continued Public Hearing: DR – th St. October 20, 2015.
1 Item W9a (Ruffalo) Coastal Commission March 7-9, 2012 Hearing.
J P LIVING At St Thomas. J P LIVING At St Thomas 7 th Street and Buchanan Street Phoenix, Ariozna Located adjacent to the Chase Ballpark in the Warehouse.
City of Redmond: Northwest Redmond & U.S. Highway 97 Plan - October 11, 2006 What Makes a Great Neighborhood.
CITY OF TEHACHAPI DOWNTOWN MASTER PLAN IMPLEMENTATION October 2, 2008.
1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission Design Advice Request #2 – 2/27/14 EA DAR Goat.
1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission EA DA Front 17.
Item W16a February 8, 2012 CCC Hearing A-6-OCN (Altman) 1823 South Pacific Street City of Oceanside.
6 JOSEPHINE STREET APPEAL OF DR/CUP/EA Project Site: Land Use Designation High Density Residential R-3 Zoning District Multiple-Family.
1 City of Portland Bureau of Development Services Staff Presentation to the Historic Landmarks Commission Type II Appeal of Approval LU HDZ –
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission LU DZ Glisan Commons May 17, 2012.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
Residential Infill Project Scale of Houses (a primer) Stakeholder Advisory Committee October 6, 2015.
1 City of Portland City Council Public Hearing on an Appeal of the Land Use Hearings Officer’s Decision Presentation by BDS Staff: Mark Walhood, City Planner.
Christopher Brown, Planner II December 4th, 2014 Case No. 14ZONE1036 La Grange Road Office Louisville Metro Planning Commission Public Hearing.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Recommendation LU MS Conway’s NW.
Block 37 Zoning & Design Guideline Evaluation May 15, 2014.
1 Gables Gateway. 2 1.Comprehensive Plan Text Amendment 2.Comprehensive Plan Map Amendment 3.Zoning Code Text Amendment 4.Change in Zoning 5.MXD3 Mixed.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission LU DZM The Parker Apartments July 12, 2012.
Lowe’s Home Improvement Center TLZM TLSE TLSE January 14, 2014 Town Council Public Hearing.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission EA DA New NE MLK & Multnomah.
Staff Presentation to the Portland Design Commission June 2, 2016 DAR #1: April 14, 2016 CITY OF PORTLAND, OREGON Design Review Hearing EA DAR.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Review Hearing LU DZM AD – Grant.
206 THIRD STREET DR/TRP Appeal of. Planning Commission Hearing March 12, 2014, P/C approved a Design Review Permit: - Demolition of the existing.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Type III Design Review LU DZ SW Yamhill,
1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission Land Use Review LU DZ Arthouse.
South Waterfront Greenway Design Guidelines Portland Design Commission Briefing April 3, 2008.
1 Villa Laguna MXD3 Site Plan Review. 2 Request: The applicant is requesting site plan review of a proposed mixed-use project pursuant to the recently.
July 4, 2017 AURORA UNITED CHURCH + SOUTHBOUND DEVELOPMENT LTD Yonge Street, 55&57/57A Temperance Street, 12&16 Tyler Street General Committee Meeting.
Zoning Code Amendment: Neighborhood District Overlay Zone
253 South Los Robles Avenue Predevelopment Plan Review
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
CFT Gateway Center ( E. Foothill Blvd
City Council September 18, 2017
File No A request for a Site Plan Review to construct a 1,425 square-foot covered balcony, a 14.5 square-foot balcony and a 5,157 square-foot.
1326 S. MICHIGAN APARTMENTS + RETAIL
83 North Lake Avenue Predevelopment Plan Review
995 South Fair Oaks Avenue Predevelopment Plan Review
Clarke Street Rezoning Bylaw 3161
254 East Union Street Pre Development Plan Review
Article XIII – Form Districts Community Meeting
Article XIII – Form Districts Community Meeting
115-Unit Mixed-Use Project (711 E
Section 8: SIGNS.
Presentation transcript:

Staff Presentation to the Portland Design Commission June 2, 2016 CITY OF PORTLAND, OREGON 1st Design Review Hearing DZM Block 20 Residential Tower 1st Design Review Hearing DZM Block 20 Residential Tower

Plan Districts Central City Plan District River Sub District North Pearl Sub Area THE SITE

Site Area Land Area: 20,000 SF Existing Condition undeveloped Quimby - Local Service Street, Walkway & Bikeway 11 th - Local Service Street, Walkway & Bikeway 12 th - Local Service Street, Walkway & Bikeway Pettygrove - designated Green Street (11 th to 15 th ) Northwest Triangle Pedestrian District Streetcar – 2 blocks south (Northrup)

Looking at site from 11 th & Quimby - Block 17 (L) & Overton Apts (R) THE SITE

Looking south on 11 th – Block 17 (R) & Block 15 (L) THE SITE

Looking at site from Quimby & 12 th – Encore in background THE SITE

Looking south on 12 th – site (L) & The Parker (R) THE SITE

Looking at north on 11 th – Block 17 on left THE SITE

41 NE corner of site looking at dog park entry THE SITE

Looking east at park from Pettygrove THE SITE

CONTEXT – Policy ZONING FLOOR AREA RATIO HEIGHT EXd, Central Employment w/ Design Overlay

Base FAR 4:1 North Pearl 9:1 w/ bonuses, transfers >9:1 if transfer from landmark CONTEXT – Policy ZONING FLOOR AREA RATIO HEIGHT

CONTEXT – Policy ZONING FLOOR AREA RATIO HEIGHT Base Height Eastern ½ - 100’ Western ½ - 225’ Max Height - North Pearl Sub Area unlimited: -floors above 100’ are 12,500 SF or less -Façade length above 100’ not exceed 120’ or up 150’ with Modification

PROJECT OVERVIEW 21-story building 149 residential units ~2,000 SF retail 1 small loading space 192 parking spaces Height 246’ FAR 2.3:1 across larger site Amenities Ecoroof garden Outdoor amenity deck Balconies most units Materials Stucco, GFRC (Equitone) curtain wall glazing, aluminum storefront & windows

PROJECT SUMMARY Reviews Design Review Type 3 – Project value exceeds $2.1 million Central City Fundamental Design Guidelines River District Design Guidelines Modifications (PBOT & BDS supportive) Reduce 1 large to 1 small loading space Reduce bike Parking spacing 2’ to 18” Increase façade Length 120’ to 122’-4” Section approval criteria

Loading 1 large or 2 small required 1 small proposed (9’ x18’ x 10’) Loading Analysis & PBOT support reduced size/number Adequate for use & allows for more active ground floor PROJECT SUMMARY Modifications

Bike Parking 225 bike spaces for residents – 1 st & 5 th floor rooms 2’ width reduced to 18” with 6” vertical stagger Functional & compact for more area for active uses PROJECT SUMMARY Modifications

Façade Length North Pearl Height Opportunity area - unlimited –Building above 100’ is 12,500 SF (12,214 SF) –Façade length < 120’ or < 150’ thru Modification (122’-4”) Shadow Study – more light access to park than code prescribed Access to views, dynamic skyline, towers w/podiums in area PROJECT SUMMARY Modifications

NW 12 th Active ground floor limited to N & S ends Service / vehicle areas – consolidated, coherent, decorative ¼ frontage bike storage – not active use Shifting bike room inboard of façade & extend retail to north & glazing to match lobby Alternate proposal to be presented Outstanding Items Ground Floor

NW Pettygrove Retail primary active component Remainder is residential – above grade, bedrooms, one porch Increase active uses & transparency - increasing glazing at retail, additional stoops, enlarging stoop Alternate proposal to be presented Outstanding Items Ground Floor

NW 11 th Residential along park – better activate street & provide “eyes on the park” Block 17 – e.g. successful ground floor residential uses –no bedrooms at street, more elevated, greater setback – enough separation between public & private uses while maintaining clear views of activities of both potential solutions - decreasing width of raised planter, expanding the porches, no bedrooms along sidewalk, and/or increasing ground floor setback. Outstanding Items Ground Floor

10’ deep canopy at lobby on Quimby 5’ deep recess at park lobby on 11 th & 4’ at retail 5’-10” projection over recessed 1 st level along 12 th Additional canopies over sidewalk - retail entries, etc. Outstanding Items Canopies

Large louver at main lobby entry Elevator pressurization relief – emergency only Decorative metal screen to match garage /service area metal Detail needed for opacity of decorative screen Outstanding Items Decorative Screen Detail

STAFF RECOMMENDATION Outstanding items: 1. Ground Level 2. Canopies 3. Decorative Screen Detail Design Guidelines not met: A8 Contribute to the Cityscape, Stage and the Action. A8-1Design Fences, Walls and Gateways to be Seen Over. B1-1Provide Human Scale to Buildings along Walkways. B5Make Plazas, Parks and Open Space Successful. B5-1Recognize the Roles of the Tanner Creek Parks. B2Protect the Pedestrian B6Develop Weather Protection Not yet recommending approval of Design Review Approval recommended for 3 Modification (loading height, bike parking, façade length)