Highest Priority Projects from “Immediate Action” Category Immediate Action All Others.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Summer Projects 2010 Town of Beech Mountain Utilities Department (Click to Advance Slides)
Sea Level Rise 2014 City Council Update
Capital Improvement Program City of Snoqualmie Public Works Department.
Wastewater Collection (Sewer Alternatives). Sewer Basics Collection and transport of wastewater from each home/building to the point where treatment occurs.
Mid-Bay Bridge Connector Phase II and III December 2011 Project Update.
1 Water System Improvements Upcoming Construction for Drinking Water Capital Projects by Jodye Russell.
1 Fort Monroe: An Update on the Environmental Cleanup VDEQ Presentation to the Fort Monroe Federal Area Development Authority March 19, 2009.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
City of Berea North End Area Sewer Investigation Project- Phase I Commencing Fall 2011.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
AECOM Technical Services, Inc. February 18, 2015 Tiverton Wastewater District Sewer Construction Program Updates to Proposed Phase 1 Sewer Expansion Note:
Temple Hill Road: Path to Vision 2020 Temple Hill Road: Path to Vision 2020.
Bringing Hyundai to Montgomery MWWSSB’s Role as Part of the Economic Development Team Presented by: Thomas R. “Buddy” Morgan, General Manager Alabama Water.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
SPECIAL ORDER BY CONSENT EMC SOC WQ S SOC Attachment 1: Summary of Major Line Replacement Completed DescriptionTotal Linear Footage Meadow Greens.
April 10, 2002 Jon KreischerCVEN GIS Identifying Critical Sewer Lines.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
Special Order by Consent Wastewater Collection Improvement Projects Mark Fisher and Dennis Asbury Final Report to City of Eden October 20, 2009.
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
Infrastructure – Condition Assessment Overview & Purpose Infrastructure Condition Assessment – General Findings/Conditions –Streets/Sidewalks/Parking Lots.
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
Heavy Construction Association March 25, 2015 Robert Sharon, Director of Infrastructure Services Ken Brown, P.Eng., Manager of Public Works Kit Woods,
Downtown PRESENTATION Tuesday, May 3, 2011 R/C Theaters Movies 14.
DISTRICT A PRESENTATION Monday, April 18, 2011 Firwood Methodist Church.
DISTRICT D and E PRESENTATION Wednesday, April 13, 2011 Hollenback Fire Station.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
Former DuPont Barksdale Works Project Update October 5, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager August 29, 2012 Revised August 30, 2012 Operating Agency Workgroup.
Facilities Plan Update July 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP.
Heavy Construction Association March 20, 2013 Robert Sharon, Director of Community Services Kit Woods, P. Eng., Manager of Environmental Services Allan.
FME: The Catalyst for a Multi- Participant Hazardous Spills Database for Peel Region Doug Seaborn Project Lead: Enterprise GIS Development & Deployment.
2012 – 2016 Financial Plan January 13,  Provide sewer collection and treatment to the City of Nelson  Treatment plant built in the ‘60’s  Nearly.
Delon Hampton and Associates, Chartered EPMC 3B Joint-Use Facilities Capital Cost Allocation Study Presented to Environmental Quality & Operations Committee.
"Equipment Selection and Data Delivery Protocols for Permanent Flow Monitoring: A Case Study" Presented By: Keith Laguaite and Greg Anderson (McKim & Creed)
DISTRICT B PRESENTATION Thursday, April 7 th, 2011 Saint Anthony’s Church.
 Prepared by  Prepared for  City of Palm Coast, Florida  August 30, 2011  Drainage Study Sections 31 & 35/37 for Development of City Wide Stormwater.
El Niño SCAP Collections Meeting November 12, 2015 Wet Weather Planning.
Storm Sewer Map Development Presented by: Kurt Whited.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
Pump Station Change Order History A Look into Common Expenses Alex Furnish and Blair Bean Bureau of Environmental Services November 17 th, 2015 NICK FISH,
Spring 2009 Town Meeting Article 41 East Framingham Sewer Improvement Project (EFSIP) May 2009 Town of Framingham Department of Public Works "Preserving.
Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016.
February 26, 2013 City of Sausalito Status Update on EPA Order Compliance (and new 2012 NPDES Permit)
City of Woburn – City Council Committee on Water Update on Water and Sewer System Improvements Projects City Council ChambersJune 1, :00 pm City.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
National Organization of Minority Engineers Metropolitan Water Reclamation District of Greater Chicago June 30, 2016.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
I/I Reduction Efforts EBMUD and the Satellite Agencies
Sanitary Sewer Lift Station Rehabilitation Design Services Pre-Submittal Meeting September 20, 2016.
CTC 450 Review WW Characteristics.
Comprehensive Sewer Planning Update Meeting
MSD’s Second Annual “Can You Dig It?”
Planning Commission Hearing
An– Najah National University
Water Department has Six Divisions
City Council Meeting February 16, 2010
Town of Dunn Sanitary District No. 3
Parkland/Brookdale Interceptor Replacement
Colchester Interceptor System Improvements Project
Children’s Hospital Update
Facilities Plan Update
MS4 OVERVIEW 2015.
Risk-Based Prioritization for Investigating Illicit Discharges Along TxDOT ROW Prepared by: G.O.A.T. – Geographers of Austin Texas INTRODUCTION MAPS METHODS.
Presentation transcript:

Highest Priority Projects from “Immediate Action” Category Immediate Action All Others

Highest Priority Project Status Project ID – NameInvestigation Status B-River Road Force MainUnderway (CDM) C-PS12 Force MainUnderway (CDM) D-PS10 Force MainUnderway (CDM) G-Burnt Mill Creek OutfallUnderway (CDM) K-Downtown Sewershed 11Underway (CDM) M-Outfall South of Greenfield Lake to PS14Underway (CDM) I-Front Street InterceptorUnderway (CDM) F-Pump Station 11Complete J-Downtown Sewers Contributing to PS9Complete A-Northeast Interceptor (NEI)Underway (KH) E-Pump Station 34Underway (KH) H-McCumber’s Ditch OutfallComplete, Rehabilitated L-Mineral Springs InterceptorComplete, Rehabilitated

Project B: River Road Force Main u 18,500 feet u 20- and 24- inch Pipe u PCCP and DIP

Project C: Pump Station 12 Force Main u 5,300 feet u 20-inch DIP 5,300 Feet

Project D: Pump Station 10 Force Main u 5,300 feet u 30-inch DIP u Elevated Over Smith Creek

Ultrasonic Investigations of Ductile Iron Pipe Were Performed to Identify Corrosion Problems

Pipe Coupons Provide Ultrasonic Calibration and Corrosion Verification

Gravity Sewer Investigation u Manhole and Zoom Camera Inspection

Project G: Burnt Mill Creek Outfall u 3,100 Feet u 48-inch RCP/DIP u 18 Manholes

Project K: Downtown Sewer Contributing to PS11 u 1,300 Feet 6- inch u 25,600 Feet 8- inch u 500 Feet 10- inch u 1,400 Feet 12- inch u 131 Manholes

Project M: Outfall to PS14 South of Greenfield Lake u 7,500 Feet u 12-inch VCP u 30 Manholes

Project I: Front Street Interceptor u 3,400 Feet u 15 & 18-inch VCP/RCP u 15 Manholes

Current Phase 2 Status and Schedule: u Completed Field Investigation of High Priority Projects u Analyzing Results and Preparing Conclusions u Present Results and Conclusions to Council next week u Draft report in November with recommendations and costs u Update to Council with recommendations and costs in December