Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Presentation of designs to YKK Team leader : Poon San On (Zen) Team members: Lee Man Kit(Jason) Kong Yau Choi(Eddie) Mak Fu Shun(Vincent) Wong Ching Pong.
1. 2 RE Case Study What was the Project Objective? When did it all Start? What was the Plan? How did Negotiations take place? What were the Benefits of.
January 7, 2013 Changing or replacing G460 sensors Slide 1 November 9, 2012 Changing or replacing G460 sensors.
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
Industrial Engineering Program King Saud University
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Automatic Dental Bur Loader NCDA Dental Products Development Group Progress Review Team 99.06: Jason Dickey, Greg Frantz, Allison Martin, Nancy Meyer Sponsor:
19 Costing Systems: Process Costing Principles of Accounting 12e
Palletizing the Easy Way
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
Network Storage and Appliance Box Build By: Cubatic Engineering 01/09/2015.
Automated HIC assembly A. Di Mauro ITS-MFT mini-week
Measuring Leakage Current on Singles and Ladders P. Riedler and S. Ceresa, August 2005 Sensor Chip Manipulator Needle for sensor back side contact Probe-card.
ROBOT APPLICATIONS.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
Institute of Physics ASCR, Prague Strip Sensors R&D for SCT and ITk Marcela Mikeštíková.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
Precision Dispensing Purdue takes advantage of the gantry’s precision by fixing a 150 micron inner diameter dispensing tip to an EFD dispensing pressure.
Workshop Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Training, Operations.
LASER AND ADVANCES IN METROLOGY
1 NSF Engineering Research Center for Reconfigurable Manufacturing Systems University of Michigan College of Engineering Cylinder Bore Inspection Engineering.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
Test station for ALICE pixel chip Confidential Information COMMENT by Y. Kwon Strategy : make sure commitment can be achieved before main commitment to.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Update on tendering for HIC automatic assembly system A. Di Mauro ITS Upgrade Plenary,
Progress in UCSD Chamber Simulation Experiments – Initial Results from Fast Thermometer Farrokh Najmabadi Sophia Chen, Andres Gaeris, John Pulsifer HAPL.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
NIKHEF B-field monitors Paul Balm November 11 th, 1999.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Sensor design and mass test system development Y. Kwon (Yonsei Univ.)
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
PHENIX upgrade possibilities in Finland Detector Laboratory/Helsinki JYFL/Jyväskylä 1) Organisation 2) Detector Laboratory premises & equipment 3) Silicon.
The Kick out Delivery Chute is a reload station for line operators to manually reload a block. After manually loading the block onto our Kick out chute,
UNIT-IV Shop Floor Control and Flexible Manufacturing Systems
Thomas Kern | The system documentation as binding agent for and in between internal and external customers April 24th, 2009 | Page 1 The system documentation.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Optical Manufacturing Solutions 1 Setting Vacuum Sensor Level.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
Insert date here Presentation to 4 th PANI 3 Management Committee PANI 3 Results – Ultrasonic Results.
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Chip design and mass test system development Y. Kwon (Yonsei Univ.)
MM Status Mostly unchanged (Feb. 3 rd 2016). Parts Mildly modified bridges, allowing to actually move 130nm pickup tools along r*phi –Turned out to be.
Name each of the following moon phases..
13 June 2006 R. Bonnefoy, C. Carloganu, E. Conte, R. Cornat, E. Delage, J. Lecoq, M.-L. Mercier, S. Monteil, P. Perret LPC Clermont PS Front-End Electronics.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
ATLAS pixel module assembly flow
Scintillator testing in Prague (update from Aussois)
Detector building Notes of our discussion
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Brief Status SPS Prototype PSB Prototype Installed in LS1
Mentored by Brian Schuster and Jonathan Ligda
LIU Wire Scanner Milestones June 2017
Probe-card Healthness Check-up
Outdoor LED display & Indoor LED display
CALICE Collaboration Meeting KEK/Japan – April 2015
Jackson Ntw You have just taken over as plant manager for K-LOG manufacturing which makes playground equipment. There are four primary stations and parts.
Automatic compression control for the LCLS injector laser
Basic Check Link Principles
Jackson Ntw Soln: For Fab Station, l=103, m=40, s=3, r= 103/120=0.86
Prevention Cohort May 4, 2016.
Presentation transcript:

Automatic Test Equipment Development with C-ON Seo Dong Gon Yonsei University

Introduction We strive to build the infrastructure for the sensor test for ITS4 chips upgrade now. It was proceeding on the basis of accumulated experience in the development and testing of silicon sensors used for the MPC-EX detectors, through the process in the past. I have been doing the job for the system design for ALICE chip probe station and the environment tested on silicon sensors from last August. In particular, let's talk about the situation and progress in the preparation for Automatic Test Equipment designs that we aim in our laboratory. In this process, C-ON corporation’s technology, has significant advantages in automation machinery manufacturing, in need will be technical assistance to achieve the final results through collaboration in the future. Frequently, visiting the C-ON Company, we has conducted a consultation. 2

Test System Upgrade 1. Vision system 2. Fine adjustment 3. Communication 4. Contact 3

System configuration 4 1. Warpage of chips 2. Tilt for chuck

System configuration 5

Automatic Test Equipment 15mm 30mm 6

Automatic Test Equipment The model Corea-YS-01 is the first prototype of Automated Test Equipment dedicated to academic research. 7

Automatic Test Equipment 8

· Flow Step 0(Initial calibration) : Probecard needle alignment(microscope 7) Step 1: sensor index (linear stage 1 & 2) Step 2: Sensor pick-and-place (linear stage 3, grip, and chuck) Step 3: Sensor movement to visual inspection (linear stage 4) Step 4: Visual inspection (line scanner 5) Step 5: Sensor alignment (vision 6) Step 6: Sensor movement to probing position (linear stage 4) Step 7: probecard placement (linear stage 8 & 9) Step 8: Once full contact is established, hand over the control to the data acquisition PC and wait for the completed test signal by the data acquisition PC Completed test signal will be defined by CERN Step 9: When completion signal arrives, resume control and return the tested sensor to the tray and repeat step 1- step 9 cycles for the remaining sensors in the loaded trays 9

 Gripper 1.The tray index is moved to the pick-up position. 2.The gripper head moves to sensor tray. 3.The gripper head is picking up the sensor(vacuum on) Sensor P&P Tray Prevent warpage by using the gripper

 Vacuum chuck 1.The work Index is moved to the P&P position. 2.The gripper is placing the sensor on the vacuum chuck. 3. At the same time sensor is placed, the vacuum chuck is turned on.( Gripper vacuum off, chuck vacuum on) Work Index Stage Stage Sensor P&P Vacuum chuck X-Motorrized Y-Motorrized Y angle-Motorrized Rotary-Motorrized X angle-Motorrized 11

 Line scanner 1.The work index is moved to a line-scan position to inspect the face of sensor. 2. Start the line scan. Line Scanning Vision Light 12

 Align vision for sensor 1.The work index is moved to inspection area. 2.Four vision observes the corners of sensor. 3.Use information from the vision to adjust the position of the sensor. Mirror Align Vision 13

 Chip inspection 1.The probe card is moved downward into contact with the sensor. 2.When finished, the process proceeds in the reverse order. Probe Card Sensor 14

Conclusions C-ON is ready to fabricate the ATE COREA-YS-01 after 8 months of operation once order is made. The ATE, which will be a property of the ALICE Collaboration, will be installed and operated at the Yonsei University for the period needed to complete the series test ( ) 1) Continuous communication with C-ON 2) Liaison for ATE