Campus Kiosk Project Fall, 2009 University Technology Fee Advisory Board & College IT Administrators.

Slides:



Advertisements
Similar presentations
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Advertisements

Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
Campus signage – Internal
Campus Recreation Advisory Board October 26, 2012 CAMPUS RECREATION FY 14 BUDGET PROPOSAL.
Here is an office or den.. You see a desk with computer on top and a big chair.
Bond Proposal May 12,  I.E.Clark Fine Arts Center – Problem – Consistent separation of walls and foundation over the years. Summary – The Fine.
City of Scottsdale Senior Center at Granite Reef
Overview of Wireless Network Steven Fetcie Infrastructure Manager Information Services.
Warm Springs Community Park 1 Administrative Building 3 School of Engineering (EAST) 2 Library and Student Service Center (WEST) 1. Administrative Building.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
Summer IT Project Update Tech Talk September 11, 2007.
Central Plant Solano Nursing Sim Lab Student Union Decision Center Construction Plan Summer 2008 Bell Tower Crawl Space Data Center Upgrade.
Main Campus Branch Campus Instructional Site Special Purpose Center IFAS Regional Center Florida A&M University Florida Atlantic University Florida Gulf.
Effective Customer Service: Exploring the process from beginning to end.
THE QUE GROUP WOULD LIKE TO THANK THE 2013 SPONSORS.
Lory Student Center 2009 Student Fee Review Board Presentation Presented by Mike Ellis, Executive Director, Lory Student Center Jeffrey W. Rosenberry,
Computing/Tier 3 Status at Panjab S. Gautam, V. Bhatnagar India-CMS Meeting, Sept 27-28, 2007 Delhi University, Delhi Centre of Advanced Study in Physics,
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
CIC/VOIP/Construction Update to the IAC 9/7/12 …on behalf of the NOC
CBPA Computer Lab Redesign Development of the Career and Placement Center Ted Strickland Department of Computer Information Systems March 21, 2005 DRAFT.
OPEN – FIN – INFO 2-42 June 13-14, 2013 OPEN – FIN – INFO 2-42 June 13-14, 2013 FY2015 Preliminary State Capital Appropriations Request and Campus Capital.
1 “WinSun”: Deploying the Windows Desktop on a Sun Ray Anita Schwartz Carol Jarom.
Prayer Endeavor:  Breakthrough Revival  Radical Hospitality  No Child Hungry.
2013 Bond Task Force Proposal Presentation & Proposal by Cory Baker Director Scottsdale Center for the Performing Arts 3 Vice President Scottsdale Cultural.
1 Budget Conversations Vice President of Administration and External Affairs.
C O L L E G E O F E N G I N E E R I N G Thin Clients: The Key to Our Success SIGUCCS 2006 Thin Clients: The Key to Our Success Mark R. Ritschard Director,
C O L L E G E O F E N G I N E E R I N G CSU PDI 2010 Thin Clients as Desktop Computers Mark R. Ritschard Director, Engineering Network Services College.
Campus Kiosk Project Spring, 2006 University Technology Fee Advisory Board & College IT Administrators.
Virtual Desktop Infrastructure Data Center Presented by Moe Yousof.
Wireless LAN Expansion Proposal Presentation to the UTFAB Monday, March 5, 2007 Scott Baily, Associate Director for Networking,
SDN Dev Group, Week 2 Aaron GemberAditya Akella University of Wisconsin-Madison 1 Wisconsin Testbed; Design Considerations.
CLASSROOM REVIEW BOARD Proposal Presentation to the UTFAB Tuesday, March 1, 2005, 5 PM, Library Tom Maher, Dir. of OIS,
Sun Fire™ E25K Server Keith Schoby Midwestern State University June 13, 2005.
Georgetown ISD Citizen’s Advisory Committee On July 14, 2015 the Georgetown ISD Citizen’s Advisory Committee unanimously voted to recommend to the Georgetown.
Information Technology Update University of Alabama at Birmingham Sheila M. Sanders September 15, 2005.
HPCVL High Performance Computing Virtual Laboratory Founded 1998 as a joint HPC lab between –Carleton U. (Comp. Sci.) –Queen’s U. (Engineering) –U. of.
Guinn Hall Project, Summer 2014 Scope of Project Painting Flooring Tub surrounds Tile in bathrooms Electrical upgrades Light fixtures New doors Ceilings.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. November 5, 2007 Prepared.
1 Management Information Systems NYC Human Resources Administration Richard Siemer – Deputy Commissioner MIS.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Windows 7. Upgrade to Windows 7 Upgrades to Windows 7 from the following operating systems are not supported: – Windows 95, Windows 98, Windows Millennium.
POV Renovations November 14,2014. Repairing the East Wall.
North Augusta High School Design Development Presentation.
Learning, Health, and Safety Capital Project Alternates and Change Order
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
HALL HIGH SCHOOL NEW SCHOOL PROJECT MARCH 28. Main entrance & cafeteria windows Main entrance.
Wireless LAN Expansion Update Presentation to the UTFAB Monday, October 16, 2006 Scott Baily, Associate Director for Networking,
Carnegie Public Library Renovation Project 2008 More than thirty years have passed since the library interior was last remodeled. Public demand for library.
Thin Client Pilot Project UTFAB : ACNS / LTS Prepared by Jason Huitt February 2, 2010.
SMITHVILLE R-II SCHOOL DISTRICT Tradition of Excellence The Power of One … One Community … One Future! November 4, 2014 SMITHVILLE R-II SCHOOL DISTRICT.
University Technology Fee Spring Presentation to the SFRB Patrick J. Burns Jason Huitt Pete Winterscheidt Garrett Pichler - Vice President for IT - ACNS.
Replacement Proposal Jason Huitt, ACNS November 15, 2011.
Wireless LAN Expansion Scenarios Presentation to the UTFAB Tuesday, Dec. 9, 2008 Greg Redder Interim Associate Director for Networking
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Wireless Expansion Update and Three Year Plan Considerations
Cambrian School District March 19, 2015
Signage Upgrade Project 2016
Installation 1. Installation Sources
Windows Server 2008 and SQL 2008 Windows Server 2008.
VIRTUALizing the lab Richard Toeniskoetter
Wireless Expansion Update and 3 year plan considerations
Wireless Expansion Update
Zero Clients and Virtual Desktops in Academic Environments
Administrative and security issues
Design Unit 26 Design a small or home office network
Classroom support 2019 Report & request
UTFAB Wireless Briefing Spring 2018
Building and infrastructure management
North Augusta High School – Phase 2A and 2B
Presented by: Mrs. Phyllis Alpaugh, Superintendent of Schools &
Presentation transcript:

Campus Kiosk Project Fall, 2009 University Technology Fee Advisory Board & College IT Administrators

Kiosks 66 Sun Ray 170 thin clients 9 Sun Ray 270 thin clients

Kiosk Servers Two Sun Fire V210 (11/05) –Dual processor (1.34Ghz UltraSparc III) –8GB RAM each One Sun T1000 (9/07) –6 core (1Ghz UltraSparc T1) –8GB RAM One Sun T5120 (1/09) –4 core (1.2GHz UltraSPARC T2) –8GB RAM Four Redundant Servers

Kiosk Locations

System Policies No authentication (changing?) Home Page (currently CSU) no USB support (due to kiosk mode) Kiosk managed by colleges & LSC Kiosk Server maintained by College of Engineering

Timeline

For Consideration Possible Kiosk Expansion Expand the reach of the kiosks? Ongoing replacement plan? –6 yr. cycle for kiosks? ($5475/yr) –4 yr. cycle for servers? ($5700/yr) Long-term management –Who’s responsible for kiosk repairs –…kiosk upgrades –…infrastructure

Kiosk Expansion (have requests for 42 units) 4 - Art (2 each: outside H101 and just inside the metals courtyard ) 1 - Clark A Wing Lounge (location totally ready for kiosk) 3 - Clark C Wing (Outside C145, similar to current kiosks, opposite end of hall) 8 - Eddy (Outside Eddy 212: 4 on each side of curve or all 8 centered on curve) 1 - Engineering second floor: Physics (location totally ready for kiosk) 2 - Engineering Research Center (main entry atrium) 3 - Glover (first floor, west entrance lobby) 3 – Housing: IHouse Lobby, UV office lobby, Aggie Village lobby 10 - Lory Student Center (exact location? is this number correct?) 2 - Natural Resources (just north of existing along the east wall) 1 - Shepardson first floor hallway (location totally ready for kiosk) 4 - Student Recreation Center: "Horsetooth Lounge" (location totally ready)

Cost to Grow (max) Per Kiosk Sun Ray 270 kiosk$400 Shelving, Network, & Power$900 Security$15 Installation$50 Server Support$300 $1,665

Questions?