Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Birdfield Building Services is an institution that has an experience as commercial building contractor, specializing in construction, property maintenance.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Background Presenters Work done in preparation for WHS changes
[Organisation’s Title] Environmental Management System
MANAGEMENT OF SMALL/MEDIUM FIRM Paweł Bilski Piotr Mazur Paulina Wawryca.
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
Contractor Safety Management
EPC & EPCM contracting.
Sewon Kim Kevin Tran Mary Svennerborg. Contents  The size of construction firms  The size of business  The small firm  The medium-sized firm  The.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Chapter 1 Professional, Architectural Careers, Office Practice, and Opportunities.
UK’s CDM Regulations 2007 and its Applications in Singapore
Maranda Hodge Marketing 1B 05/2011. DESCRIPTION OF DUTIES  First, the architect and client discuss the objectives, and budget of a project. The architect.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Jo Richardson Community School. BTEC First Diploma in Engineering Name: Unit 1: Structure of the Construction Industry: The Construction Industry Assignment.
Welcome to your music business. So what do you need to do to get started? PLAN & ORGANISE Otherwise you may never get started and even if you do, the.
H&S Consultants Consulting Services and Project Management.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Roles and Responsibilities
Constructionsite Roles in Construction Ron Gatepain.
Health and Safety Policy
1 Exotic Disease Response Training Introduction to Organism Management.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Specification & Quantities Estimating
LIANZA Sept Getting it together for libraries : Designing a collaborative learning centre Karen Kealy, Manager, Planning and Projects Information.
Overall Quality Assurance, Selecting and managing external consultants and outsourcing Baku Training Module.
UNIT 15 WEEK 9 CLASS 1 LESSON OVERVIEW Pete Lawrence BTEC National Diploma Organisational System Security.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
General Contractor Davon Woodard February 11, 2014 Career Tech.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
Agency Construction Management :CM NOT AT-RISK
Information System Project Management Lecture three Chapter one
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Project management Topic 4 Organisation.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Project Management “Project Planning & Scheduling” Lecture 07 Resource Person: M. Adeel Anjum.
Regional Dental Consultants’ Meeting Presented by Emerson Robinson, DDS, MPH Region II and V Dental Consultant.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Edexcel BTEC Level 2 Diploma in Construction Interactions between team members Unit 1 Structure of the Construction Industry.
Edexcel BTEC Level 2 Diploma in Construction Training and education Unit 1 Structure of the Construction Industry.
BTEC Nationals – Unit 5 Construction Technology and Design in Construction and Civil Engineering.
Arboricultural Association Approved Contractor Scheme NW Tree Officers presentation Paul Smith AA Technical Officer & Approved Contractor scheme manager.
CDM Construction Design and Management
PROJECT CONCEPTION AND MONITORING PRESENTED BY: OLOJEDE SAMSON OLUSOLA DEPUTY BURSAR UNIVERSITY OF IBADAN 5 TH APRIL, 2016.
Unit 210: How to communicate with others
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 29 PowerPoint presentation Types of organisation,
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
Constructing Recreation Facilities 8 chapter. Groundbreaking Before the construction begins, a groundbreaking ceremony is often held in recognition of.
Chapter 3 Project Management Parts of this presentation is extracted from Ian Sommerville’s slides located at
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Chapter 8 Construction. Groundbreaking Before the construction begins, a ceremony is often held to recognize the official start of the project. This step,
SACPCMP CONSTRUCTION MANGEMENT SUMMIT
Roles and responsibilities PM
The Design Team Carl James.
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Health and Safety Policy
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Lecture : Tasks and Responsibilities in the Management of Healthcare Wastes Which one do you want ? by Dr Mohammed Ali Al Zahrani.
RIBA Plan of Work 2013.
Quarry Operator and Contractor Code of Conduct
Temporary Works Co-ordination
Guidance notes for Project Manager
Site Management Structure
RIBA Plan of Work 2013.
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
CEng progression through the IOM3
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry

Edexcel BTEC Level 2 Diploma in Construction Aims Learning Outcome 3 Know about human resources in the construction industry nts/BTEC%20Firsts%20from%202010/BF Firsts-Construction-Issue3.pdfhttp:// nts/BTEC%20Firsts%20from%202010/BF Firsts-Construction-Issue3.pdf

Edexcel BTEC Level 2 Diploma in Construction Objectives To examine the members of the construction team To define roles and responsibilities of the construction team To undertake Assignment 1 P4 and P5

Introduction Let’s think about what it means to design and construct a successful building…….. IDEA! In all projects there is always two teams……..

client architectural tech architect site manager surveyors clerk of works contract manager safety officer craftsperson general operatives estimator buyer cons engineers subcontractors Arrange the different roles into two teams of design and contracting teams……..

Construction Teams Design Team Contracting Team There are two separate teams in all construction projects

Student Activity Edexcel BTEC Level 2 Diploma in Construction CategoryRole 1Role 2 operatives craftspersons technical supervisory managerial professional personnel State two examples of the below categories

Client The client is the person or organisation at the top of the pyramid – the ultimate employer. It is their project that everyone else is working on. The client may take an active role or delegate all or some of the decisions to a contractor. The client usually selects the team members, by appointment or by tender. Team members may be selected on the basis of their: reputation, expertise and quality of work being local to the area, therefore good for the local economy history of working with other members of the team before price.

Architect The architect must first consult very closely with the client about the design of the project, and then make sure that all aspects of the design brief are communicated clearly to all members of the team. For many large projects the architect will create a scale model to show what the finished structure will look like. Throughout the construction phase, the architect will: consult with all team members on the fine detail of the design and specifications assist with problem-solving as issues arise.

Architectural Technologist Architectural technologists work on-site more than the architect, dealing with team members on the development of the project. The technologist will gather information about particular design issues and pass this on to the team, assisting with problem- solving as necessary. The information gathering could include: clarifying the client’s preferences on details of the design researching: legal requirements relating to the design selection of materials feedback from the client and stakeholders on: the progress of the project the quality and suitability of the final structure.

Surveyors A building surveyor may be responsible for a number of areas, for example: valuation of property for lenders scheduling building defects refurbishments and undertaking different types of building surveys, such as home information packs.

Clerk of works Also known as a site inspector, the clerk of works makes sure that the work on-site is completed to specifications. The site inspector will also keep records of on-site activities, people and events including: regular site personnel – numbers and job titles site visitors deliveries documentation received, such as: drawings, specifications and instructions, especially where changes have been made to the original plan weather and any other relevant events.

Contacts Manager Often the Contracts Manager will be responsible for a number of projects at any one time. The contracts manager has an overall responsibility for planning, management and building operations and will liaise between the Client, head office staff and the site agents on the contracts for which they are responsible.

Site Manager The site manager is responsible for making sure that the construction team ‘pulls together’ and the project is completed safely within the planned timeframe and budget. The responsibilities include: liaising with all team members planning work schedules supervising site preparation briefing the workforce monitoring progress reporting to the client.

Craftsperson Craftspeople usually work within their own team on large projects. The team leader will inform the main construction team about design, planning, materials and other information. Each member of the craft team is responsible for: the work being completed to the required standards, including safety and quality reporting any issues, problems or faults this is very important. Bricklayers Plasterers Joiners

General Operatives Undertake semi- skilled work Produce work that is of the correct quality Labourers Drain layer Steel fixers

Sub-contractors The subcontractors are brought in to do particular jobs, such as Plumbing or electrics. Contractors should be included in team notices, briefings and other communications. They should also be committed to the goals of the project and to open communication regarding mistakes, faults, breakdowns and other issues.

Safety officer The site safety officer is responsible for making sure that all site health and safety requirements are met. The safety officer communicates with all site personnel about specific precautions and safety rules, and checks that these are followed. If an accident occurs, the safety officer conducts an investigation to find the cause, and will make changes to safety procedures to ensure it doesn’t happen again.

Estimator The estimator works out the cost of the project, including materials, equipment, transport and labour. The project may be divided into components, which can be tendered out. For example the client may invite tenders for the plumbing component or the electrical component of the project. The estimator works out the specifications for the tender, consulting with other team members such as the buyer, surveyor and project manager. When the tenders come in they are compared to the estimator’s costing.

Buyer As the name suggests, once a contract has been won, the buyer is responsible for purchasing all the materials from suppliers. The buyer has to ensure that the materials are delivered on time and within the estimator’s costs stated in the tender.

Student Activity Edexcel BTEC Level 2 Diploma in Construction CategoryRole 1Role 2 operatives craftspersons technical supervisory managerial professional personnel State two examples of the below categories

Student Activity Task 6 (P4) (P5) Produce a report which identifies two examples of the following: operatives craftspersons technical supervisory managerial professional personnel (P4) Your report will also include the roles and responsibilities of each example (P5) Edexcel BTEC Level 2 Diploma in Construction