© Crown copyright Met Office EUMETNET- SRNWP verification programme -Met Office Responsible member Clive Wilson – Project manager 31st EWGLAM/16th SRNWP.

Slides:



Advertisements
Similar presentations
© Crown Copyright Source: Met Office Dale Barker, Tomas Landelius, Eric Bazile, Francesco Isotta, Phil Jones 17 April 2013 EURO4M – WP2: Regional.
Advertisements

Page 1 NAE 4DVAR Oct 2006 © Crown copyright 2006 Mark Naylor Data Assimilation, NWP NAE 4D-Var – Testing and Issues EWGLAM/SRNWP meeting Zurich 9 th -12.
Page 1© Crown copyright 2007SRNWP 8-11 October 2007, Dubrovnik Draft Interoperability Proposal Terry Davies SRNWP Meeting October 8-11, 2007.
© Crown copyright Met Office SRNWP Interoperability Workshop, ECMWF January 2008 SRNWP Interoperability Alan Dickinson Met Office.
COSMO General Meeting September 2012 Gergely Bölöni C-SRNWP: Coordination on Short Range Numerical Weather Prediction EUMETNET C-SRNWP Programme:
EWGLAM/SRNWP Annual Meetings 2005 SRNWP Business Meeting 5 October 2005 Ljubljana (Slovenia) Short-Range Numerical Weather Prediction Programme.
Operational Quality Control in Helsinki Testbed Mesoscale Atmospheric Network Workshop University of Helsinki, 13 February 2007 Hannu Lahtela & Heikki.
© Crown copyright Met Office SRNWP Interoperability Workshop, ECMWF, January 2008 SRNWP Interoperability Terry Davies Met Office.
Regional Report on the current status of the exchange of weather radar data. RA VI Stuart Matthews, UK Met Office on behalf of EUMETNET OPERA April 24th.
Performance of the MOGREPS Regional Ensemble
Short-Range NWP Programme 13th SRNWP Meeting 11 October 2006 Zurich (Switzerland)
Expert Team on System Aspects and Interoperability Programme Glenn Greed, UKMO, Project Manager Interoperability Ulrich Schättler, DWD, Chairman of the.
SRNWP data pool Jean-Marie Bettems / MeteoSwiss Claudia Heret / DWD COSMO GM Roma, September 5 th, 2011.
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
Interoperability between the European NWP modelling systems Ulrich Schättler, François Bouttier, Xiaohua Yang, Radmila Brozkova, Alan Radford A Report.
1 Joint Working Group Forecast Verification Research  Beth Ebert (BOM, Australia) co-chair  Laurie Wilson (CMC, Canada) co-chair Barb Brown (NCAR, USA)
NWP Activities at INM Bartolomé Orfila Estrada Area de Modelización - INM 28th EWGLAM & 13th SRNWP Meetings Zürich, October 2005.
“Initiate the reorganisation and strengthening of the SRNWP Programme” EMN/C27/Doc12 C27 took place the 4-6 April 2006 in Toulouse 13th SRNWP Meeting 12th.
Page 1© Crown copyright 2007SRNWP 8-11 October 2007, Dubrovnik SRNWP – Revised Verification Proposal Clive Wilson Presented by Terry Davies at SRNWP Meeting.
Page 1© Crown copyright 2005 SRNWP – Revised Verification Proposal Clive Wilson, COSMO Annual Meeting September 18-21, 2007.
COSMO Annual Meeting September 2005 Zurich (Switzerland) Short-Range Numerical Weather Prediction Programme.
NOAA’s National Weather Service National Digital Forecast Database: Status Update LeRoy Spayd Chief, Meteorological Services Division Unidata Policy Committee.
9° General Meeting Adriano Raspanti - WG5. 9° General MeetingAthens September Future plans CV-VerSUS project future plans COSI “The Score” new package.
SRNWP meeting, Dubrovnik OMSZ PROPOSAL October, OMSZ proposal for becoming responsible member of the C-SRNWP programme ANDRÁS HORÁNYI
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
Page 1© Crown copyright 2004 Quality Management of a European Wind Profiler Network (CWINDE) Tim Oakley TECO-05 Bucharest, 4 th -7 th May.
© Crown copyright Met Office Preliminary results using the Fractions Skill Score: SP2005 and fake cases Marion Mittermaier and Nigel Roberts.
The Centre for Australian Weather and Climate Research A partnership between CSIRO and the Bureau of Meteorology AGREPS – ACCESS Global and Regional EPS.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Priority project « Advanced interpretation and verification.
9th COSMO General Meeting September 2007 Athens (Greece) Programme Short-Range NWP Report of the Programme Manager.
P1.85 DEVELOPMENT OF SIMULATED GOES PRODUCTS FOR GFS AND NAM Hui-Ya Chuang and Brad Ferrier Environmental Modeling Center, NCEP, Washington DC Introduction.
CARPE DIEM 6 th meeting – Helsinki Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches.
VERSUS2 – A new priority project for verification Pj Leader – Angela Celozzi.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG4 activities Pierre Eckert, MeteoSwiss, Geneva.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 4 activities.
EurEPS The Realization of an Operational LAM-EPS in Europe A SRNWP Project under EUMETNET Proposed to the EUMETNET Council at its 30 th meeting by Norwegian.
© Crown copyright Met Office WAFC CAT verification Objective verification of GRIB CAT forecasts Dr Philip G Gill, WAFS Workshop on the use and visualisation.
World Meteorological Organization Working together in weather, climate and water THE GLOBAL FRAMEWORK FOR CLIMATE SERVICES (GFCS)
Strategic Intervention A novel use of Ensembles in Forecast Guidance
U. Damrath, COSMO GM, Athens 2007 Verification of numerical QPF in DWD using radar data - and some traditional verification results for surface weather.
Overview of WG5 future activities Adriano Raspanti Zurich, September 2005.
Page 1© Crown copyright 2005 Met Office Verification -status Clive Wilson, Presented by Mike Bush at EWGLAM Meeting October 8- 11, 2007.
Page 1© Crown copyright 2004 The use of an intensity-scale technique for assessing operational mesoscale precipitation forecasts Marion Mittermaier and.
Verification of ensemble precipitation forecasts using the TIGGE dataset Laurence J. Wilson Environment Canada Anna Ghelli ECMWF GIFS-TIGGE Meeting, Feb.
Trials of a 1km Version of the Unified Model for Short Range Forecasting of Convective Events Humphrey Lean, Susan Ballard, Peter Clark, Mark Dixon, Zhihong.
Short-Range NWP Programme 8th COSMO General Meeting Organisation: Romanian National Meteorological Administration September 2006 Bucharest (Romania)
10th COSMO General Meeting, Cracow, Poland Verification of COSMOGR Over Greece 10 th COSMO General Meeting Cracow, Poland.
WG4 Oct 2006 – Sep 2007 plans COSMO General Meeting, 21 September 2006 Pierre Eckert.
C-SRNWP (SHORT RANGE NUMERICAL WEATHER PREDICTION NETWORK) AND THE FORECASTING CAPABILITY AREA OF EUMETNET Responsible member: Hungarian Meteorological.
New results in COSMO about fuzzy verification activities and preliminary results with VERSUS Conditional Verification 31th EWGLAM &16th SRNWP meeting,
The CED’s & DED’s role in the Tenure & Promotion of Agents
Review of verification activities and developments
Responsible member: Hungarian Meteorological Service Period:
LAM and Short Range NWP Some thoughts from Brussels
Systematic timing errors in km-scale NWP precipitation forecasts
External Projects related to WG 6
Workshop Results WG5 COSMO General Meeting
ESB Networks Market Release Meeting of the IGG, March 5th 2009
Student Administration and Support Programme and Project Timelines
Student Administration and Support Programme and Project Timelines
TOP6 – WP4 Coordination and Management JPICH Coordination Office
2nd Workshop on Short Range EPS 7th–8th April 2005, Bologna
Student Administration and Support Programme and Project Timelines
SRNWP-PEPS COSMO General Meeting September 2005
IPET-DD-1 meeting Feb 2019 Thorsten Busselberg -DWD
Some ideas on verification targeted to the use of the forecasters Pierre Eckert, MeteoSwiss, Geneva Some ideas on the presentation to the forecasters.
TOP6 – WP4 Coordination and Management JPICH Coordination Office
Strategic Intervention A novel use of Ensembles in Forecast Guidance
HOME AFFAIRS IDENTIFICATION SYSTEM (hanis)
Presentation transcript:

© Crown copyright Met Office EUMETNET- SRNWP verification programme -Met Office Responsible member Clive Wilson – Project manager 31st EWGLAM/16th SRNWP meetings – Athens 29 Sep 2009

© Crown copyright Met Office EUMETNET/SRNWP programme - Deliverables Main objective this year is D1: Operational verification comparison of deterministic forecasts from one version of each of the 4 regional models of Europe (available for all the participating members) D2: Additional intercomparison of other versions of the consortia models including high resolution models D3: Inventory and recommendations of “new” scale-selective verification methods. D4: Catalogue of sources of non-GTS data D5 Exchange methods and code for verification of severe weather forecasts- NEW

© Crown copyright Met Office D1. Operational model intercomparison Exchange of forecasts* from models at 3-4 centres Met Office NAE - 12km Hirlam reference - 15km Aladin France - 10km COSMO-EU - 7km Use existing packages at different verification centres Accept different station selection, QC (difficult to mandate/change at op. centres) Verify common scores for same parameters over common areas Compare, contrast & pool results to reach “consensus” Extension of existing precipitation verification done by Met Office * Format – GRIB1 then GRIB2 as adopted by interoperability

© Crown copyright Met Office Hirlam UM COSMO ALADIN

© Crown copyright Met Office Outline Plan – 1 st year D1, Jan- Apr 2009 Review methods, agree parameters & format for exchange Agree contact points & participating centres May : start exchange Aug : publicise results on web site Dec : Report on intercomparison results D3, Jun:High res. methods workshop- Helsinki Dec: 1 st recommendations for high res verification methods

© Crown copyright Met Office Deliverables D2, D3, D4, D5 D2. Add more models/configurations including higher resolution forecasts to intercomparison D3. Methods/code for high resolution forecasts Collaborate on investigation of new methods Provide/exchange code for new methods Publicise verification studies D4. Non-GTS data Catalogue sources Enable access to radar composites (OPERA) D5 - Exchange methods and code for verification of severe weather forecasts

© Crown copyright Met Office Agreed Contact points for each consortia for D1 Met Office Clive Wilson, Marion Mittermaier, ALADIN Joël Stein, COSMO Francis Schubiger, Ulrich Damrath, HIRLAM Carl Fortelius, ALADIN-LACE Dijana Klaric,

© Crown copyright Met Office Requested Models & responsible contacts NAE 12km Unified Model – Met Office Responsible person – Rob Darvell, Also In charge of Verification suite ALADIN- France – MeteoFrance Responsible person - Joël Stein COSMO – DWD Responsible person – Ulrich Damrath HIRLAM reference – FMI Responsible person – Carl Fortelius

© Crown copyright Met Office Work to date Programme decision completed by EUMETNET Ex- committee at 26th March 2009 Contract Agreement between Met Office & Directors of the participating members The forecast parameter list and other fields such as land sea masks and orography specified. Method of collecting the forecast data agreed and commenced with June 2009 data (commenced July) intend to back-fill with forecasts from January 2009 Data decoded from GRIB to internal Met Office format (fieldsfile) Verification suite built and under test A station list of synoptic observations to be used for comparison areas will be agreed and publicised.

© Crown copyright Met Office Problems & delays to plan Verification suite could not commence until an upgrade of the computing resource was made end of May. Problems with transfer of operational verification suite to IBM supercomputer delayed start on SRNWP suite (August) Some issues with rotated grid (Hirlam) still need ironing out Meteo_France supply of dddff winds need transformation to components

© Crown copyright Met Office Indication of participating verification centres besides the Met Office At present only the Met Office has agreed to verify all the forecasts. The intercomparison would benefit from another centre verifying them independently, as proposed in the programme Agreed at ET meeting in Helsinki to return results for each model to suppliers to check against their own verification for QC of Met Office process Xiaohua Yang, indicated DMI maybe interested in independent verification using Hirlam verification system

© Crown copyright Met Office Very preliminary test results MSLP, Block to 03900

© Crown copyright Met Office Very preliminary test results T 2m, Block to 03900

© Crown copyright Met Office Successes: Few problems in organising supply and transfers – Thanks! GRIB1 mostly OK “Operational” SRNWP verification suite built Greater resource effort now available Speed up of processing Exchange of results for QC by suppliers

© Crown copyright Met Office Plan for next 3 months for D1 Iron out remaining GRIB/rotation problems Exchange results for QC checks Include EC high resolution forecasts Backfill from January 2009 Establish results pages on EUMET portal All ET participants to be given access Report on results for first year (end Dec)

© Crown copyright Met Office Plan for next 3 months for Methods/code for high resolution forecasts Produce review of current methods used in SRNWP and elsewhere – seek contributions/input from: Met Office – Intensity/scale & Fractional Brier Skill Meteo_France Fuzzy- BSS_SO, BSS_NO MeteoSwiss- D phase tests of methods DWD – Fuzzy techniques FMI- SAL Others WAF Spatial Forecast Verification Methods Special Collection NCAR,RAL, Spatial Forecast Verification Methods Inter- Comparison Project

© Crown copyright Met Office Outline Plan 2 nd year Continue intercomparison & report Dec D2: Add high res. models D4: Construct catalogue of non-GTS data D3: Aug: final recommendations for high res verification methods & code D5: Exchange methods & code for severe weather forecasts

© Crown copyright Met Office Responsible member duties Model Intercomparison organise the exchange of forecasts from the 4 reference models coordinate the participating verification centres verify the reference models using its verification package produce the graphics and compute the consensus verification scores maintain up-to-date the model intercomparison pages on its web site store on its computer system all the verification results Use of the non-GTS observing data in verification Establish a catalogue of data sources Publicise verification studies and routine use of such data motivate the NMS to provide their non-GTS observation data for verification use

© Crown copyright Met Office Dates & Cost (per year) Start 1 January 2009 End 31 December 2010 (2 years) Costs of the Responsible Member 0.3 Full time equivalent scientist: € 30,000.- Travel expenses of the 0.3 full time equivalent scientist:€ 2,000.- Total cost per year: € 32,000.- Project managers – Clive Wilson & Marion Mittermaier