ATLAS TRT Duke University CERN, Feb. 2003 1 Fuse Box Status Duke University.

Slides:



Advertisements
Similar presentations
Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa 1 STATUS REPORT.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Chiho Wang ATLAS TRT Duke University Hampton, May Xe-CO 2 Stability Chiho Wang Duke University.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
27/9/2007, T Water =19°C No Box screwed onto cooling block: T min =37°C, T max =48 °C.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Seog Oh/ Duke University/September, 2003 TRT Workshop/ Peniscola, Spain Duke TRT Progress.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
W. EbensteinDOE Review Duke UniversitySeptember 1999 TRT Barrel Cooling: Electronics  Motivation: u Overheating of electronics causes premature failure.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Status of Gain Mapping at Duke.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
ATLAS TRT Barrel Design Review, 1998 Barrel TRT Electronics Cooling Chiho Wang Duke University.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
FE Electronics - Overview ASD TDC L0 Buffer L1 Buffer biasL0 BXL1 50 fC DAQ counting room ~100m FE Electronics on the detector GOL Electronics Service.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
Status of straw-tube tracker V.Peshekhonov, D.Peshekhonov, A.Zinchenko JINR, Dubna V.Tikhomirov P.N.Lebedev Physics Institute, Moscow Presented on the.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
The Alice-ToF HV system and the PVSS control system E. Scapparone for the Alice-Tof group DCS Workshop, June 16 - The ToF High Voltage layout ; - Component.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Service box / Patch panel Cabling detector counting room Power supplies LV and HV LHCb Outer Tracker Services and Infrastructure.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Chiho Wang ATLAS TRT Krakow Workshop Duke University May, HV Plate Design & Assembly Chiho Wang Duke University.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Chiho Wang ATLAS TRT Duke University IU, Oct Fuse Box Design & Mounting Chiho Wang Duke University.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuse Boxes Chiho Wang Duke University.
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
Chiho Wang ATLAS TRT Barrel Duke University U. Penn. Workshop, 2000 Module Thermal Analysis Chiho Wang Duke University.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
W. EbensteinDOE annual review Duke UniversitySeptember, 1998 TRT Barrel Cooling: Electronics  Motivation: u Overheating of electronics causes premature.
Chiho Wang ATLAS TRT Duke University CERN, Feb Gas-Flow Measurements Chiho Wang Duke University.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
A few points that need discussion today (Gerard) UH needs golden front boards (2?), golden HVB (1), and HV cabling to PS with the correct connectors. IU.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
GEM Integrated PCB readout and cooling
Test beam straw prototype production status
We started last December: 32 channels prototype “Julich like” to:
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Jack Fowler Duke University Spain Workshop
Barrel TRT Module Cooling
ROBOX modification plans
Design of the He and HB ODU
First of all we will remind some numbers:
Summary of Fuse Testing for Barrel Module Fuse Boxes
Module Production and Testing at Duke
LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov
Testing of the EMCO Prototype Boards
HUBER+SUHNER ACS Confidential ACS May 2013.
SALTRO16 activities in Lund
Presentation transcript:

ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University

ATLAS TRT Duke University CERN, Feb Latest Fuse Box Design  1 type of fuse box for each module type  Dimension: R x  x Z u Based on June, 2001 prototype fuse size: 2.4 x 5.8x 4.3 mm u Type 1 : 71 x x 12 mm u Type 2 : 98 x x 12 mm u Type 3 : 148 x x 12 mm  HV granularity: u Type 1: 6 HV lines/module = 3/fuse box u Type 2: 6 HV lines/module = 3/fuse box u Type 3: 10 HV lines/module = 5/fuse box  Current draw range: u type 1: 565uA – 1,087uA per HV line u type 2: 999uA – 1,253uA per HV line u type 3: 498uA – 735uA per HV line

ATLAS TRT Duke University CERN, Feb Beam test prototype  Simulates actual fuse box, except fuses and HV cables.

ATLAS TRT Duke University CERN, Feb Summary  All components & design within fuse box are defined. u Max current draw per HV line is 1,253uA u Max number of straws per HV line is 96 (192 ch)  Yet to be defined components outside the fuse box: u HV connector at PPB1 u Fuse box ground connection at cooling plate or roof board  Parts are being quoted for manufacture, expect to start production ……  Fuse size can impact fuse box dimension. If it’s different from 2001 prototype we need to know ASAP.