Liquid Argon Detector Developments at Ciemat. Participation of Ciemat at the ArDM experiment in Canfranc. Luciano Romero Manuel Daniel María de Prado.

Slides:



Advertisements
Similar presentations
Present Status of GEM Detector Development for Position Counter 1.Introduction 2.GEM 3.Readout Board 4.Fabrication Test 5.Large GEM 6.Readout Electronics.
Advertisements

TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
I.Kreslo CHIPP workshop on Detector R&D, University of Geneva, June Development of Liquid Nitrogen Time Projection Chambers A. Ereditato,
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
GEM Detector Shoji Uno KEK. 2 Wire Chamber Detector for charged tracks Popular detector in the particle physics, like a Belle-CDC Simple structure using.
Particle Physics Design Group Studies Big Liquid Argon Neutrino Detector Subgroup Particle Physics Design Group Studies: The BLAND Subgroup BLAND.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
New Readout Methods for LAr detectors P. Otyugova ETH Zurich, Telichenphysik CHIPP Workshop on Neutrino physics.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
Ionization. Measuring Ions A beam of charged particles will ionize gas. –Particle energy E –Chamber area A An applied field will cause ions and electrons.
Detectors. Measuring Ions  A beam of charged particles will ionize gas. Particle energy E Chamber area A  An applied field will cause ions and electrons.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Status of EXO-200 Carter Hall, University of Maryland DUSEL town meeting November 4, 2007.
Photomultiplier Tube. What is it? Extremely sensitive detector of light in the ultraviolet, visible and near infrared Multiplies the signal produced by.
RPC (Resistive Plate Chamber)
Xiaodong Wang ( 王晓冬 ) School of Nuclear Science and Technology Lanzhou University, Lanzhou, China MPGD activities at Lanzhou University July 5, 2013.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
TE/MPE/EM/PMT Collaborations Rui de Oliveira on behalf of PCB workshop team 29/11/20121.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
QUPID Readout and Application in Future Noble Liquid Detectors Kevin Lung, UCLA TIPP 2011 June 11, 2011.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
High Energy Physics Group Department Of Physics Banaras Hindu University Prakhar Garg (A. Kumar, A. Prakash, B.K Singh, V. Singh & C.P Singh)
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
1 5-9 October th ICATPP, Como, Italy S. Maltezos NITROGEN MOLECULAR SPECTRA OF AIR FLUORESCENCE EMULATOR USING A LN 2 COOLED CCD S. Maltezos, E.
1 Satoshi Mihara for the   e  collaboration, review meeting at PSI, Jul 2002 Photon Detector Satoshi Mihara ICEPP, Univ. of Tokyo 1.Large Prototype.
1 Liquid Argon Dark Matter: Synergies with R&D for Neutrino Detectors: Chemically clean Argon for drifting electrons and light output (Oxygen and H20 relevant.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
GEM basic test and R&D plan Takuya Yamamoto ( Saga Univ. )
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
MUCH - related activity at PNPI A.Khanzadeev, for PNPI team ● R&D on muon chamber for MUCH central part ● Test of the materials for chamber modules ● Preparations.
PSD-V, London, September 1999 Two dimensional readout in a liquid xenon ionisation chamber V.Solovov, V.Chepel, A.Pereira, M.I.Lopes, R.Ferreira Marques,
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Luke or MTS Q anode. MOBY DICK  Purpose of Moby Dick:  Can we even get to ~10 ppb O 2 and H 2 O?  What other things in Moby will cause loss of LAr.
Preliminary results on Copper filters, with FLIC test chamber F. Pietropaolo, A. Zani, M. Meli CENF General Meeting – 22/10/2015.
1 Two-phase Ar avalanche detectors based on GEMs A. Bondar, A. Buzulutskov, A. Grebenuk, D. Pavlyuchenko, Y. Tikhonov Budker Institute of Nuclear Physics,
Ciemat Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas Daniel Cano-Ott, DAQ meeting in Huelva, July 18 th and 19 th A new flash.
Proportional chambers with cathode readout in high particle flux environment Michał Dziewiecki.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
The BoNuS Detector: A Radial Time Projection Chamber for tracking Spectator Protons Howard Fenker, Jefferson Lab This work was partially supported by DOE.
Installation of the T600 at Fermilab CSN2, September 22,
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Development of a Single Ion Detector for Radiation Track Structure Studies F. Vasi, M. Casiraghi, R. Schulte, V. Bashkirov.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
The ModuLAr Project LoI discussion INFN-LNL 21/11/2007 Legnaro (PD)
Thorsten Lux. Charged particles X-ray (UV) Photons Cathode Anode Amplification Provides: xy position Energy (z position) e- CsI coating 2 Gas (Mixture)
Cryogenic Test Stand Facilities at PAB: Stephen Pordes Neutrino R&D Workshop January 20 –
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
Installation of the T600 at Fermilab Fermilab, February 15,
High Pressure Electroluminescent TPC CIEMAT/IFAE
ICARUS T600: low energy electrons
Installation of the T600 at Fermilab
Plans for this week MWPC: wire stretching today
DC56 R&D Goals, Schedule and Status
First operation of a double phase pure liquid Argon THGEM-TPC
A. Badertscher, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P
Development of Liquid Nitrogen Time Projection Chamber
10/month is the present production rate 2 FTE + sporadic contributions
PAN-2013: Radiation detectors
Status of n-XYTER read-out chain at GSI
A DLC μRWELL with 2-D Readout
Presentation transcript:

Liquid Argon Detector Developments at Ciemat. Participation of Ciemat at the ArDM experiment in Canfranc. Luciano Romero Manuel Daniel María de Prado

Index 1.Motivations. 2.Liquid argon detector development at Ciemat. a.Basic Infrastructure. b.Detector accesories. c.Drift Chamber. 3.Participation in ArDM experiment. 4.Tasks and Objectives of this project. 5.Schedule chart. 6.Project budget.

1. Motivations During 20 years the Ciemat built wire drift chambers for the big experiments at Cern (L3, CMS) When CMS was finished, a new detector development program was launched at Ciemat using liquid argon technology. Liquid argon drift detectors are the natural refinement of gaseous wire chambers. This research program was supported both by the Ciemat directorate and the high energy physics group (CICYT FPA ). The Ciemat directorate is interested in the research of detector technologies with possible medical aplications. Liquid argon detectors may be used as a PET detector.

1. Motivations At the same time, we get involved in the ArDM experiment for dark matter detection in the Canfranc laboratory. This application for financing has two aims: 1- Complete the development of the CIEMAT liquid argon detector. 2- Fulfill our commitment with the ArDM experiment.

2. Detector development at Ciemat a)We wanted to install at CIEMAT a basic infrastucture with a high vacuum system, cryogenic facilities and gas system that allows us to develop liquid argon detectors. This infrastructure is an asset for the future because may be useful to test and develop future detectors. b)Development of ancillary instrumentation for liquid argon detectors. Level sensor. Oxygen contamination sensor OXISORB purifier. Electronic purifier.. c)Development of a dual drift chamber. Mechanical design and construction of the chamber Development of the read out electronic. Test of the chamber with cosmic muons. d)Measurement and PET reconstruction of a pointlike positron source.

2a. Basic infrastructure. 450 liters liquid nitrogen dewar. 2 cryostats of 70 liters, high vacuum grade, for liquid argon. Turbomolecular pump for high vacuum.

2a. Basic infrastructure. Liquid nitrogen distribution system. Cryogenic filling electronic control. Crane. Gas distribution system. Alarm system for personal security. Sensor of atmospheric oxigen concentration. Ambient air renovation pump. Autonomous breathing masks.

2b Detector ancillary systems Level Sensor –Capacitive transducer. –Read out electronic Cleaning system. –In order to clean the liquid argon of electronegative elements, like oxigen, a chemical absorber is used (OXISORB). –To be included in the gas system. In parallel, an innovative electronic cleaning system, developed by us, will be tested.

2b Detector ancillary systems Oxygen contamination sensor. –Is a small drift chamber. –Photoelectrons are produced in its cathode by a pulsed xenon flash lamp. –The difference between the signals of the electrons departing the cathode and the electrons arriving to the anode is a measurement of the oxigen contamination.

Two cells of 100x100x180mm each. Each cell is made of. –Signal cables. –Layer of 32 sensor wires. –Layer of 32 induction wires. –GEM. –Extraction of electrons from LAr. –Drift electrodes. –High voltage divider. –Transparent cathode. –Photomultiplier for the trigger. With a thin layer of TPB (wavelength shifter) Total number of channels: 128 A hole between both cells allows to introduce samples. 2 c Drift Chamber

2 c Read out Electronics. The electronics use commercial signal preamplifiers and shapers (CR-110 and CR-200 from CREMAT). A printed circuit board with 16 channels has been designed. ADCs and TDCs for data adquisition are commercial boards from CAEN. The firm CAEN is developing, for ArDM, a new data taking system optimized for liquid argon detectors. We are interested in adquiring a 128 channels unit. Out preamp Out amp Out shaper CAL in Signal CAL is 8mV in 1pF (8fC)

3. Participation in ArDM experiment (Canfranc) Because of the small size of our group, our involvement in ArDM is limited. Our contribution to the construction effort is the design and construction of mechanical parts. These tasks are easied by the excellent mechanical workshop of CIEMAT. The 30 drift electrodes of the ArDM detector have already been produced.

3. ArDM detector and drift electrodes. (CERN)

3. Neutron shielding for ArDM. We have the commintment with ArDM for the design and construction of the neutron shielding. We have designed a cylindrical container, 3m diameter and 3m heigth, to be filled with polyethylene pellets. The total volume of the container is 16,5 m 3. The total amount of polyethylene is 10 tons.

3. Neutron shielding container

3. Top view of the neutron shielding container.

4. Tasks and Objectives of this project. This project is continuation of previous efforts to build a liquid argon detector. The duration of the project is two years. With respect to the 128 channels CIEMAT detector, the first objective of the project is to put it in working condition. The milestone of this objective is the PET reconstruction of a pointlike positron source located in the central hole. This objective is to be achieved in the first year of the project. In the second year of the project, we want to improve the spatial resolution of this detector by a factor 4, from 2.5 mm to 0.6 mm.

4. Tasks and Objectives of this project. On the matter of our participation in the ArDM detector, our objective in the first year of the project is to fulfill our commitment of building the detector neutron shield. During the second year of the project, we want to participate in the detector data acquisition. Another aim of this project is the writing of a doctoral thesis by one of us. (M. de Prado).

5. Schedule Chart

6. Project budget An amount of 10.9 K€ is requested for small instrumentation of the CIEMAT detector. –HV power supply. –ADC –Capacimeter. –High vacuum hardware. This amount is to be spent in the first year of the project.

6. Project budget We request 15k€ to install the personal safety system and 3 k€ for the gas system. This amount is to be spent in the first year of the project. In the second year we request 30k€ to buy a CAEN data acquisition system

6. Project budget For our participation in the ArDM experiment we request 30k€ for the 10 tons of polyethylene pellets and 3k€ for the shield container.

6. Project budget Finally, we request money to travel. 4800€ during the first year 6800€ in the second year, including long term travels to Canfranc.

6. Project budget The total amount we request is € € during the first year 39760€ in the second year.