CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.

Slides:



Advertisements
Similar presentations
Cryogenic Experts Meeting (19 ~ ) Helium distribution system for Super-FRS dipoles and multiplets MT/FAIR – Cryogenics and Magnets Y. Xiang,
Advertisements

February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
ESS Cryogenic System Design
ITER Cryoplant System Status
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Hall B Cryogenics CLAS and CLAS12 David Kashy Hall B Lead Engineer May 26, 2010.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
The ESS Cryogenics System J. G. Weisend II, P. Arnold, J Fydrych, W. Hees, J. Jurns, A. Lundmark, X. T. Su, X.L. Wang June 2015.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
Test Lab Cryogenic Requirements Kirk Davis Director’s Review of Cryogenic Capacity 26 May, 2010.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Performance analysis of cryogenic system and cryomodules for the complete superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
TAC2 Alpi consolidation in Cryogenics and Cryomodules.
ITER Liquid Helium Plants Status and Test Protocol ICEC June 29th, 2015 / Grenoble / FranceY. FABRE.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
Manoj Kumar, B. N. Duttagupta, Rajvir Singh Doohan, S. K. Joshi, A. K. Sagar, L. Chowdhary, Rekhya Naika, Prabhat Kumar Gupta, Vivek Nema, Hemant Kumar.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
LCLS-II Cryoplant Overview
CMTF Cryogenics Arkadiy Klebaner May 6, Outline CMTF cryogenic system scope Goals Key functional requirements Conceptual layout Cryoplant Current.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Jonathan Creel Electrical / Cryogenics Engineer Cryogenics.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
1 Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion Research Institute Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion.
CRYOGENIC SYSTEM of RAON Chul Jin Choi CnC Team, Accelerator Division Chul Jin Choi CnC Team, Accelerator Division.
Internal review of superconductors and magnet laboratories 2nd part: SM 18 & b.163: current status, weak points, possible improvement Cryogenics Vladislav.
Study and Development of Large Cryogenic Systems in China
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Cryomodule test stand at ESS site
Process Simulation for the LCLS-II Cryogenic Systems
FRIB Cryogenic Support
at STFC Daresbury laboratory
Cryoplant Installation Scope
N. Hasan1, P. Knudsen2 and V. Ganni2
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
Cryogenic System Operation and the Progress of SSRF II
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
ESS RF Development at Uppsala University
Status of the cryogenic system for B180
Horizontal Tests in a Vertical Cryostat
Mathew C. Wright October 2016
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
ESR 2 Presented to Joint Hall A/C Summer Meeting
SNS Cryoplant Commissioning Past Experiences
CTF Users’ Perspective
ESR2 Process Cycle Design
ESR2 Process Cycle Design
Presentation transcript:

CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 RISP Workshop

Contents  Schedules  RAON Cryogenic System  SRF Test Facility Cryogenic System  Summary Tasks /23/2013 – RISP Workshop - Chul Jin Choi

Schedules RAON Cryoplant Preliminary Design Contract Procurement Delivery / Installation Commissioning RAON Distribution System Design Contract / Procurement Install & Commissioning SRF TF Cryogenic System He Liquefier Delivery / Install / Comm Distribution & Sub-Systems 2013 Tasks *RAON Distribution System: Distribution Box(DB), Transfer Line(TL), Valve Box(VB), 2K VB Shop Test Engineering RFQ Preliminary 1.RAON Cryoplant : Preliminary Design (RFQ) 2.TF Cryoplant : Sub-system Design & Contract Proc/Install Test Facility Cryo Maintenance Procurement Cont RAON Comm. Design/Contract Contract (5/6) 1Y 7M 6M Procurement /23/2013 – RISP Workshop - Chul Jin Choi  NFRI  KEK  TRIUMF 3

RAON Cryogenic System SCL1 SCL 3 All-in-one type (For SCL 1,2,3) SCL 2 Separated type (For Future Extension) CRCR DB Cold box IF System 20 kW Compressor Station Option 1Option 2 5/23/2013 – RISP Workshop - Chul Jin Choi

Cooling Scheme for HWR, SSR1 & 2 Central LHe  2K LHe Central SHe  4.5K LHe  2K LHe 4.6K, 1.3bar LHe 3-4K Sub-atm 40-70K GHe / 77K LN K GHe / 80K GN2 6-8K GHe Valve box 2K Module Cryomodule Beam line JTJT s A Valve Box & 2K Module for Every Cryomodules 5/23/2013 – RISP Workshop - Chul Jin Choi

Cooling Scheme for IF Separator Satellite Refrigeration for HTS & LTS HTS: Dipole (1), Quadrupole (6) : LTS : Dipole (7), Quadrupole (15) : Bath (2.8K) Warm Comp. Booster Pump (~2.8K) Central He Dewar 300K, 5bar 300K, 0.05bar SCM Re-Cooler /23/2013 – RISP Workshop - Chul Jin Choi  Need to fix T_input & ΔT for every SCMs

SRF TF Cryogenic System SH e Schematic of Cryogenic System for SRF Test Facility V.3.5 Coldbox C OR S LN2 HX 80K Ads 20K Ads Dewar 3000L 4.6K, 1.3bar Portable Dewar Warm Pumping (for 2K) Recovery & Purification Horizontal Cryostat Gas Bag R-Comp 150 bar Impure Purifier & Air Bottle Pure ORS He Liquefier LN2 150 bar 9.8 bar Dryer JT 2K Module Cool-down (300-80K) LN2 Test Benches Distribution Box HX Vertical Cryostats  Linac Demo  CM Test He Buffer Sep. 2K2K 2K2K 4K4K /23/2013 – RISP Workshop - Chul Jin Choi 2K Return He Recovery

Test plan Maximum required cooling capacity (1) Liquefaction rate (2) Mass flow rate into 2 K module (2K/4K Heat Exchanger) (3) Static load of CM + “one” SSR2 cavity excitation /23/2013 – RISP Workshop - Chul Jin Choi TEST Required Capacity Mass flow rate (g/s) Liquefier Capacity 4K 1. Vertical80 L/h (1) 4.0 (1) 120 L/h (150%) 2K 2. Vertical30 W1.6 (2) 330 W (110%) 3. Horizontal9 W0.5 (2) 4. Cryomodule25 W (3) 1.4 (2) 5. Linac demo20 W1.0 (2)

Summary – 2013 Tasks 5/23/2013 – RISP Workshop - Chul Jin Choi 9 1.RAON Cryoplant : Preliminary Design (RFQ)  All-in for the Preliminary Design  Foreign Lab : KEK, FNL, TRIUMF 2. TF Cryoplant : Sub-system Design & Contract  Distribution System  2K Module  Recovery & Purification System 3. R&D Outsourcing  NFRI : RAON Cryogenic System Preliminary Design  KAU : 2K/4K Heat Exchanger Fabrication & Test