PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.

Slides:



Advertisements
Similar presentations
FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.
Advertisements

BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
Injection test? Mike Lamont For initial discussion.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Injector De-cabling Project Project Team Meeting #
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Injector De-cabling Project Enlarged meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
ADT re-commissioning after LS1 A. Butterworth, W. Höfle, F. Killing, G. Kotzian, T. Levens, D. Valuch with many thanks to BE/OP LBOC, ADT re-commissioning.
EPC Power Converters and the Linac4/PSB Beam Interlock System B. Mikulec, B. Puccio & J-L. Sanchez.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
YETS PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? Many thanks.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
LHC machine status ~ Daily Summary ~ Daily beam commissioning meeting Week 42 - October 14 th, 2015 CERN, Geneva, CH M. Lamont and S. Redaelli for the.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
Booster identification/disconnections Follow-up Enlarged project meeting, E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Planned activities during (E)YETS… up to LS2 for PSB-PS equipment Etienne CARLIER On behalf of TE/ABT/EC.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
SPS Personnel Protection System Renovation Project
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
LHC Beam Commissioning Meeting V. Kain & R. Alemany
TE-MSC activities in SPS during LS2
EYETS David Hay EN-OSS.
ELENA installation and commissioning status
LIU – EVM status and next steps
Injectors BLM system: PS Ring installation at EYETS
Planning and Installation
The ELENA Safety Documentation «time to prepare the safety clearance»
Status of the BI Work Package in the LIU-PSB frame
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
SPS Planning for the EYETS Meeting 8 (07/12/2016)
Update on the Ethernet Network Installation Campaign
WPs concerned by L4 connection:
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Status of the BI Work Package in the LIU-PSB frame
SPS Injection BIS - Draft requirements
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec

Summary of Last Week W5 1HW TESTS DECABLING CAMPAIGN MonTueWedThurFri AM 08:30 PSB stay in general access mode, Machine Cleaning (magnets stay grounded and access can be given until 17h30) BE-OP: PSB Beam Patrol TE-EPC: F. Boatini MPS group 2 repair TE-MSC: Access 'Special Permit' MPS pulsing for magnet tests TE-MSC: Special Permit MPS pulsing (suite) TE-ABT: Verify hydraulic connections of all septa (Suite) 10:30 TE-MSC: remove the grounding on the main magnets and the reference magnet TE-ABT: Kickers unlocking Firstline: The power converters and MPS unlock BE-CO: B. Ninet GSBDL investigation TE-MSC + Firstline: MPS lockout BE-RF: C16 Section 5L1 Finemet Section 6L1 C02 Section 7L1 C02 Section 10L1 C04 Section 13L1 PM 13:30 EN-CV: Water is back from N. Roget PSB stay in general access mode, Machine Cleaning (magnets stay grounded and access can be given until 17h30) DSO test TE-MSC: Replace all magnet covers TE-ABT: Verify hydraulic connections of all septa TE-ABT + TE-EPC: Auditive patrol 15:30 DSO tests (CANCELLED) but MPS OK at 17:30 BE-CO: Jochen and David inspect the CVORB driver for the GSBDL

Report from Equipment Groups (BE) BE-BI – LHC-type BLMs connected and powered; ACEMs OK; final check with beam – BPMs: Connections tested; new FESA3 class version for injection PUs to be tested with beam; final checks with beam – Ring BPMs: Checked with calibration, to be checked with beam – BTMS: Frontend hybrids repaired and reinstalled, tested and work – BTVs: OK – SEM grids: OK for PSB, ISOLDE: some channels to repair – DCCT: Rings 1-3 OK, ring4 updated electronics – FBCT: Injection and ejection OK – Tune: Software new FESA version to finalize, Hardware OK

Report from Equipment Groups (BE) BE-CO – Timings – Timing signal renaming campaign?? – OASIS: Complete check done by OP; some follow-up from the OASIS team BE-RF – Cavity maintenance finished last week – Status of LL-RF?? – Status of TFB??

Report from Equipment Groups (TE) TE-EPC – Installation of additional FGC3 PC finished; to be tested by OP – To be checked: New shaver powering scheme (+polarity checks) – PowM1553: OP+EPC check new FESA class operation (including multi-ppm) TE-ABT – Hydraulic check + auditive patrol OK, BISMV, BISMH, BESMH, BT1, BT4 and SMV20 OK ready for OP TE-MSC – Ring magnet covers back ON and Shaver covers OFF TE-MPE – WIC (new orbit correctors?), BIS to be tested with all conditions TE-VSC – Vacuum valves still closed; good vacuum level right now E-8/9;BR20?

Report from Equipment Groups (EN) EN-STI – RADMONs and dump monitoring OK EN-ACE – Alignment could be partially done; ring elements in GEODE; waiting for BI elements EN-CV – PSB dump ventilation – fan moved outside machine? Tested? EN-EL – Intervention on PSB machine lighting control on 11 th of February  no access! Sockets in PSB building also affected. – February: Installation of cable tray containment above racks in BCER + BAT EN-HE – Lift maintenance on 10 th of February.

Planning for This Week 10/02: Lift maintenance 11/02: Intervention on PSB lighting control PowM1553 dry run to be organized with TE-EPC TE-MSC+TE-EPC Polarity check 4L1, 11L1, 4L4, 10L4, 7L4 and 9L4 (Machine Access Monday 08 morning) Measurements without beam for BTP.BPM20 (kickers ON and OFF) Start debugging injection HW + timing and continue with ring and extraction elements BCT: [PS SWY tunnel] Transformers to removed

General Remarks Next meeting Monday 15/02 9am Please provide us steady feedback on the HW test status!