Subseasonal to Seasonal Prediction Research: A WWRP/THOPEX and WCRP Initiative Gilbert Brunet WWRP/JSC Chair CAS MG meeting, 15-17 November 2011 Madrid,

Slides:



Advertisements
Similar presentations
© GEO Secretariat THORPEX-TIGGE Overall Concept What? –TIGGE: THORPEX will develop, demonstrate and evaluate a multi- model, multi-analysis and multi national.
Advertisements

WMO 1 CAS Technical Conference (18-19) and CAS-16 (20-26) November 2013 Antalya T. Nakazawa RES/ARE.
WWRP THORPEX PDP WORKING GROUP MEETING 5.15 pm Tuesday 21 June (Buffet Supper) 6.00 pm Meeting Starts ECMWF Meeting Room 1 OFFICE BLOCK EXTENSION.
WWRP 1 THORPEX Summary Paper David Parsons U of Oklahoma School of Meteorology
Sub-seasonal to Seasonal Prediction (1-90 days) -
Sub-seasonal to seasonal prediction David Anderson.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
26th WGNE Meeting, October 2010, Tokyo, Japan. REPORT OF THE PRESIDENT of the COMMISSION FOR ATMOSPHERIC SCIENCES Dr. Michel Béland.
WWRP CASNEW PROJECTS Polar Prediction project – The Commission concurred with the Executive Council Panel of Experts on Polar Observations, Research and.
World Meteorological Organization Working together in weather, climate and water Other Cross-Cutting Matters WMO Polar Activities and Global Cryosphere.
WWRP The Sub-seasonal to Seasonal (S2S) Prediction Project Co-chairs: Frédéric Vitart (ECMWF) Andrew Robertson (IRI) 1 “Bridging the gap between weather.
WMO Competency Standards: Development and Implementation Status
Actions from DAOS-4 Action 2: WMO to set up the DAOS web pages and implement appropriate links to other projects and monitoring sites (T. Nakazawa) Action.
World Weather Research Programme (WWRP) Report Gilbert Brunet WWRP/JSC Chair THORPEX 9th Session of ICSC, WMO, Geneva, September 2011.
WWRP Sub-seasonal to Seasonal Prediction (1-90 days) - A Seamless Approach WWRP/THORPEX, WCRP Kick off meeting on Sub- seasonal to Seasonal Prediction.
WWRP Toward a Seamless Process for the Prediction of Weather and Climate: On the Advancement of Sub-seasonal to Seasonal Prediction TTISS, September 2009,
1 Joint Working Group Forecast Verification Research  Beth Ebert (BOM, Australia) co-chair  Laurie Wilson (CMC, Canada) co-chair Barb Brown (NCAR, USA)
A WWRP, THORPEX, WCRP POLAR PREDICTION WORKSHOP: “A THORPEX CONTRIBUTION TO THE IMPROVEMENT OF POLAR PREDICTIONS ON WEATHER-TO-SEASONAL TIMESCALES” (6.
International CLIVAR Working Group for Seasonal-to- Interannual Prediction (WGSIP) Ben Kirtman (Co-Chair WGSIP) George Mason University Center for Ocean-Land-Atmosphere.
Available products for Seasonal forecasting J.P. Céron – Direction de la Climatologie.
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
WWRP Open Science Conference and Summer School on Earth- system Modelling Gilbert Brunet WWRP/JSC Chair CAS MG meeting, November 2011 Madrid, Spain.
World Meteorological Organization Working together in weather, climate and water WIGOS – WMO Foundation for Meeting the Observing needs of Weather, Climate,
CAS MG1/Doc. 2.1 (Valid September 27, 2010) REPORT OF THE PRESIDENT of the COMMISSION FOR ATMOSPHERIC SCIENCES Dr. Michel Béland.
Geneva 2-3 December 2011 Proposal for a sub-seasonal research data set.
World Weather Research Programme (WWRP) Report Gilbert Brunet WWRP/JSC Chair.
Global Framework for Climate Services 1 World Meteorological Organization Working together in weather, climate and water ER 2: Enhanced capacities of Members.
WWRP The THORPEX Mid-Term Review David Burridge Of no particular abode.
Report on the 25 th WGNE meeting Hosted by DWD in Offenbach, Germany 2- 9 November 2009 Presented by Pierre Gauthier Department of Earth and Atmospheric.
WWRP OUTCOME OF CASXV (November 2009) David Burridge and Gilbert Brunet WWRP & THORPEX IPO CASXV report – ftp://ftp.wmo.int/Documents/PublicWeb/mainweb/meetings/
WWRP Implementation Plan for the WWRP Polar Prediction Project Thomas Jung, Steering Group Chair Neil Gordon, WMO Consultant November
WWRP THORPEX Alan Dickinson Chair THORPEX ICSC and David Burridge THORPEX IPO.
© Crown copyright Met Office WMO CBS operational collection/display of seasonal (and sub-seasonal) forecasts Richard Graham, Met Office Hadley Centre.
Interactions between the Madden- Julian Oscillation and the North Atlantic Oscillation Hai Lin Meteorological Research Division, Environment Canada Acknowledgements:
Incheon, South Korea, November 2009
High Impact Weather Emerging challenge identified at CASXVI Mariane DIOP KANE Mariane DIOP KANE CASMG9, Geneva, April 2014.
DAOS WG 5 th Meeting University of Wisconsin, Madison Sept Items 2.1 and 2.2 Jim Caughey THORPEX IPO.
WWRP Commission of Atmospheric Sciences - new projects Polar Prediction project – “The Commission concurred with the Executive Council Panel of Experts.
WWRP An International Polar Prediction Project Chair: Gilbert Brunet Rapporteur: Barry Goodison 1.
Modes of variability and teleconnections: Part II Hai Lin Meteorological Research Division, Environment Canada Advanced School and Workshop on S2S ICTP,
Slide 1 Thorpex ICSC12 and WWRP SSC7 18 Nov The Sub-seasonal to Seasonal (S2S) Prediction Project 1 “Bridging the gap between weather and climate”
Sub-seasonal to seasonal Prediction Project. Background  Several operational centres are now producing sub-seasonal forecasts. There is a need to fill.
MJO Research at Environment Canada Meteorological Research Division Environment Canada Hai Lin Trieste, Italy, August 2008.
The Polar Prediction Workshop, Oslo, Norway, 6-8 October 2010.
Polar Weather Prediction Research Gilbert Brunet WWRP/JSC Chair CAS MG meeting, November 2011 Madrid, Spain.
THORPEX Legacy Projects Progress Report (Agenda Item 5.1) T. Nakazawa C/WWRD.
Report on the WWRP, THORPEX, WCRP Workshop “Improvement of Weather and Environmental Prediction in Polar Regions” (6 to 8 October 2010, Oslo, Norway) Gilbert.
Sub-seasonal to seasonal Prediction Project. Index  Background  S2S Planning group  Implementation plan: - Applications - Research and modelling issues.
WWRP 1 THORPEX-WCRP Collaborations and other climate relevant activities of the WWRP WCRP/JSC31 WMO/WWRP/THORPEX
Marcel Rodney McGill University Department of Oceanic and Atmospheric Sciences Supervisors: Dr. Hai Lin, Prof. Jacques Derome, Prof. Seok-Woo Son.
11 9th ARC Meeting 3 November 2012, Kunming, China Report from ICSC 10 Jim Caughey, THORPEX IPO.
Subseasonal forecast data exchange with LC-LRFMME:
The Sub-seasonal to Seasonal (S2S) Prediction Project
Current Activity of WMO LC-LRFMME
Review of RA-I 16th Session Resolutions related to
Key Questions What are the key priorities in prediction on timescales from a hour to a season? 5 Societal needs 5 Key prediction/science questions 5 technological.
S2S sub-project on verification (and products)
Roadmap to Enhanced Technical Regulations of WMO
REPORT BY THE CHAIR OF THE OPEN PROGRAMME AREA GROUP ON THE DATA-PROCESSING AND FORECASTING SYSTEM Ken Mylne
IPET-OPSLS: Activities and Achievements (after April 2016 Beijing Meeting) Arun Kumar Chair, CBS/CCL IPET-OPSLS Climate Prediction Center, USA
Reports to TIGGE – 9, Geneva Aug 31- Sept 2, 2011
THORPEX report to the CAS Management Group Alan Dickinson ICSC Chair
Links with GEO.
Causes of improvements to NWP (1979 – 2009)
Caio Coelho (Joint CBS/CCl IPET-OPSLS Co-chair) CPTEC/INPE, Brazil
Organisation Météorologique Mondiale Pour une collaboration active dans le domaine du temps, du climat et de l’eau OMM Operating principles of the WMO.
Commission for Basic Systems (CBS) Technical Conference 2018
IPET-OPSLS/CCl-17 relevant issues before EC-70
Background on the IPET-OPSLS
CAS MG 6 Meeting, Nov , 2011, Madrid, Spain.
Presentation transcript:

Subseasonal to Seasonal Prediction Research: A WWRP/THOPEX and WCRP Initiative Gilbert Brunet WWRP/JSC Chair CAS MG meeting, November 2011 Madrid, Spain

Centres participating in the WMO Long Range Forecast Verification System WMO Commission for Basic System prediction time range definitions – MEDIUM-RANGE WEATHER FORECASTING: BEYOND 72 HOURS AND UP TO 240 HOURS DESCRIPTION OF WEATHER PARAMETERS – EXTENDED-RANGE WEATHER FORECASTING: BEYOND 10 DAYS AND UP TO 30 DAYS DESCRIPTION OF WEATHER PARAMETERS, USUALLY AVERAGED AND EXPRESSED AS A DEPARTURE FROM CLIMATE VALUES FOR THAT PERIOD. – LONG-RANGE FORECASTING: FROM 30 DAYS UP TO TWO YEARS – CLIMATE FORECASTING : BEYOND TWO YEARS

MJO connection to Canadian surface air temperature: a significant impact Lagged winter SAT anomaly in Canada Significant warm anomaly in central and eastern Canada 1-2 pentads after MJO phase 3

Predicting the Low Frequency Variability Extended-range forecasting of the NAO with the Canadian GEM Monthly ensemble prediction System Medium-range forecasting the 500hPa height with the ECMWF deterministic prediction system

Impact of the North Atlantic Oscillation on the forecast skill of the Madden-Julian Oscillation Hai Lin and Gilbert Brunet (GRL, 2011)

World Meteorological Congress WWRP World Meteorological Organization 2011 Congress Polar Prediction project – “Congress acknowledged the success of the ten projects of the International Polar Year THORPEX cluster, and supported the CAS recommendation that, as a legacy of the IPY, a THORPEX Polar Research project be established to improve the understanding of the impact of high impact weather over Polar Regions. Congress also emphasized the need to have an adequate observational and telecommunication network for the Polar Regions in order to provide the relevant high impact weather services for the region. “ “Congress strongly urged all those concerned to ensure that such a Polar Prediction Research project is established in support of, inter alia, the Global Framework for Climate Services. Furthermore, the EC-PORS, at its Second Session in Hobart in October 2010, agreed to the concept of a major decadal initiative to develop a Polar Prediction System (Global Integrated Polar Prediction System - GIPPS). Congress recognized the importance of effective coordination between these various initiatives, and invited Members to contribute as appropriate. “ Sub-seasonal to Seasonal Prediction – “Congress noted that the JSCs of the WWRP and the JSC for WCRP and WWRP/THORPEX ICSC set up an appropriate collaborative structure to carry out and international research initiative on sub-seasonal to seasonal forecasting. This initiative should be closely coordinated with the CBS infrastructure for long-range forecasting and with the future developments of climate service delivery and the Global Framework for Climate Services. “ “Congress was pleased to note that the WWRP-THORPEX / WCRP workshop on “Sub-seasonal to seasonal prediction” (Exeter, December 2010) had recommended the establishment of a Panel/Project for Sub-seasonal Prediction Research and Applications - Panel members being drawn from WWRP- THORPEX, WCRP, CBS, CCl, JCOMM, CHy, CAS and CAgM and their relevant programme bodies. “

Sub-seasonal to seasonal prediction The Report from the Workshop on “Sub-seasonal to Seasonal Prediction” (Met Office, Exeter 1 to 3 December 2010) has been published to the web ( ndations_final.pdf; ndations_final.pdf The major Workshop recommendation was that a Project for sub-seasonal to seasonal prediction research should be established; Planning Group should include representatives from WWRP-THORPEX, WCRP, CBS and CCl and their relevant programme bodies; The first task for the Planning Group should be the preparation of an Implementation Plan, which is consistent with the contents of the Workshop Report and Recommendations. 99

Sub-seasonal contd. The Implementation Plan should give high priority to: Sponsorship of a few international research activities; The establishment of collaboration and co-ordination between operational centres undertaking sub-seasonal prediction to: – ensure, where possible, consistency between operational approaches to enable the production of data bases of operational sub-seasonal predictions to support the application of standard verification procedures and a wide-ranging programme of research Facilitating the wide-spread research use of the data collected for the CHFP - Climate-system Historical Forecast Project (and its associate projects), TIGGE and YOTC for research; The establishment of a series of regular Workshops on sub-seasonal to seasonal prediction.  10

Sub-seasonal contd. the WWRP/SERA Working Group and the WCRP should outline plans for a number of regional projects; Drs. Frederic Vitart (ECMWF) and Andrew Robertson (IRI) are the co-Chairs of the Planning Group and should be approved at this meeting; WWRP/THORPEX/WCRP Sub-seasonal to seasonal implementation kick-off meeting. WMO headquarters, 2-3 December  11

Sub-seasonal to Seasonal Prediction Initiative Planning Group Planning Group Co-Chair 1 Frédéric Vitart ECMWF (WWRP) Co-Chair 2 Andrew Robertson IRI (WCRP) Arun Kumar CPC/NCEP Harry Hendon CAWCR CSIRO/BoM Yuhei Takaya JMA Hai Lin EC Alberto Arribas UKMO June-Yi Lee IPRC Duane Waliser NASA Hyun-Kyung Kim KMA Ben Kirtman IGES/COLA Liaison Group Carolina Vera WCRP JSC Liaison Richard Graham UKMO CBS12 Jean-Pierre Ceron Meteo-France CCL Barbara Brown SERA/Verification Consultant David Anderson

Thank you! Merci!