NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 (DB Phase 3) Terry Rd. to Gibbs Pond Rd. Design-Build Project PIN 0054.18, Contract No. D900033.

Slides:



Advertisements
Similar presentations
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Drawings of Sufficient Detail
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Bangor Water Districts Experience With Gas. Bangor Water Districts Experience With Natural Gas.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION I-390 Interchange Improvements Design-Build Project (PIN ) City of Rochester & the Town of Brighton,
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 15 Publication No. FHWA-HRT Bicycle Lanes.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
New York State Department of Transportation
Utilities in MaineDOT’ s Right of Ways. MaineDOT’ s Jurisdiction All State and State Aid roads. All Facilities and.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Administration & Finance November 18, 2014 Utility Corridor and Roadway Relocation Project Update (UCRR)
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
MAJOR REVISIONS TO THE POLICY FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS Presented By: Mark Attaway March 29, 2011.
Harrisburg Area Transportation Study Cross-river Connections Study Capital Area Cross-River Connections Study prepared for Harrisburg Area Transportation.
Florida Department of Transportation, November 2009
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
New York State Department of Transportation
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Safety Audit Components Safety assessment for risk Management.
Ch. 7 – Parallel Parking NY State DMV.
Module 5 Displaced Left Turn (DLT) Intersections
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
New York State Department of Transportation
COPYRIGHT © AREMA : 1 of 24 Module 17: Utility Occupations.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges Over Route 80 Town of Tully, New York Region 3 PIN , Contract No. D Onondaga.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION SR 427 over Chemung River Design-Build Project PIN , Contract No. D Town of Chemung, Chemung County.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Chapter 4. Your number one priority as a driver is to drive your vehicle carefully and safely. Your speed and manner of driving must create a safe environment.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Roundabout Study and Design EDSM Revisions
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 Route 111 to Mount Pleasant Road Design-Build Project Request for Qualifications Informational.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Phase 2: 30% Design Plans September 4 th, 2012.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
STA Safety Project PID #76439 December 12, 2006.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
New York State Department of Transportation
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
Steps 6 to 8 Lesson 4 | The Eight-Step RSA Process 4-86.
Temporary Pedestrian Accommodations in Utility Work Zones Rebecca Klein, PE Regional Work Zone Engineer ,
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Draft Transportation Element September 6, 2017
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Walker Street Reconstruction Project 25% Design Public Hearing
Construction Considerations
Presentation transcript:

NEW YORK STATE DEPARTMENT OF TRANSPORTATION NY Route 347 (DB Phase 3) Terry Rd. to Gibbs Pond Rd. Design-Build Project PIN , Contract No. D Town of Smithtown, Suffolk County Request for Proposals RFP Utility Meeting December 18, 2015

Catherine Traina Attn: NY Route 347 (DB Phase 3) Design-Build Project Office of Contract Management New York State Department of Transportation 50 Wolf Road, 6 th Floor Albany, New York NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Rules of Contact 2

NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) General Location TOTAL FEIS PROJECT LIMIT Design-Bid-Build Project (Completed) Design-Build Phase 3 Project Location Design-Build Phase 1 Project under construction 3 Design-Build Phase 2 Project under construction

NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Outline  General Scope of Work  Background Information on Utility Coordination  Utility Coordination – Existing Utilities  Required versus Potential Relocations  Utility Relocation – By Others  Utility Relocation - By DB  Questions On Utilities? 4

NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) General Scope of Work  Reconstruction of NY Route 347 with additional travel lanes and shared-use path for pedestrians and bicyclists in a Manner that Maintains the Corridor Theme;  Pedestrian facilities;  Bus turnouts and enhanced bus stop;  Landscape  Invasive species;  Concrete sound wall; 5

NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) General Scope of Work (Continued)  Relocation and/or preservation of existing utilities;  ITS Installation and integration with the existing INFORM system;  Traffic signals;  Installation of street and pedestrian lighting;  Signing & pavement markings;  Work Zone Traffic Control;  Drainage. 6

NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Background Information on Utility Coordination 7  Part 131 of Title 17 of the Official Compilation of Codes, Rules, and Regulations of the State of New York - identifies the rules and regulations associated with the accommodation of utility facilities located within state highway rights of way. To be used by utility facilities that affect the use and operation of state highway facilities and by personnel progressing capital construction projects for letting by the Department.  Recognition must be given to the fact that if owners of utility facilities are to complete the adjustments of their facilities by the time desired, they must have ample opportunity and time to design the adjustments, budget the costs, procure the necessary materials and supplies, fit the work into operating schedules, assemble the required crews and equipment, and actually perform the work.

 All new or relocated installations of above ground utility elements shall be located, in order of preference, but not within the clear zone:  (i) At the rights-of-way line;  (ii) Between the outer edge of the sidewalk and the rights-of-way line;  (iii) A minimum of one foot six inches behind the face of curb or edge of shoulder (where appropriate).  (iv) If such one foot six inch minimum offset cannot be physically attained, a lesser appropriate distance behind the face of curb may be considered and/or authorized by the Department and, where applicable, the Federal Highway Administration. NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Background Information on Utility Coordination 8

 All new or relocated longitudinal installations of underground elements shall be located, in order of preference:  (i) Between the outer edge of sidewalk and the rights-of-way line;  (ii) Underneath the sidewalk;  (iii) Between the curb and sidewalk;  (iv) Underneath the roadway pavement of a parking lane;  (v) Underneath the roadway pavement, only if other locations are neither feasible nor practicable, and only if the Department after examination finds that the safety and integrity of the highway traffic operations … NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Background Information on Utility Coordination 9

 Depth of bury. - 3’ and 5’,  Vertical and lateral clearances 18’, signals 5.5’ and 10’. 5’ Lateral  Abandoned Facilities - The utility shall remain responsible for all abandoned utility facilities, the Department may cause the removal of the facility.  Work Zone Traffic Control Traffic flow is to be maintained at all times during the progress of work. All work shall be performed in such a manner as to minimize hazards to the traveling public. NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Background Information on Utilities at Work 10

 Pavement crossings for underground utilities shall be accomplished by jacking, driving, drilling, boring, or tunneling. The edge of the excavation (nearest the pavement) used for driving or jacking shall not be less than 10 feet, measured laterally from the curb, or edge of shoulder at shoulder break, whichever provides more clearance.  "Open cut" installation may be approved by the Department only upon a clear demonstration of. maintenance of the utility. When the highway configuration or other circumstances preclude the minimum offset, the Department may consider approving an alternate configuration and offset. NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Background Information on Utilities at Work 11

NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Utility Coordination – Existing Utilities  Verifying utility facility locations; including vertical data  Coordinating with owners for utility relocations;  Protecting existing utilities;  Identifying Avoidance and Minimization Options.  Ex: Altering drainage, offset structures and cantilevered signals  Identifying & resolving conflicts;  Providing stakeout and final layout of utility relocations;  Cost to repair damages to utilities caused by Design-Builder;  Informing the Department of all meetings/correspondence with utility owners;  Development and Completion of 3 Party UWA 12

NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Required Relocations Versus Potential Relocations  This DB project is different, edge lines and intersection design have not been provided as preliminary plans. The result is …  Existing Utilities running parallel within the median and under left turn lanes are to be removed to the edges of roadway. This includes National Grid and SCWA (portion of project).  All other relocations discussed are potential and are provided as a reference to what may be encountered and times frames for relocation if necessary. 13

NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Utility Coordination – Existing Utilities – Relocations by Others 14 Aerial – LIPA / Verizon / Cablevision:  There are approximately 87 utility poles within the project limits (NY Route 347 Sta to and assumed side road improvements). These poles are owned by LIPA and Verizon - LIPA owns 54; Verizon owns 33.  Assuming 75 % or 65 utility poles. LIPA, Verizon and Cablevision will require approx. 10 to 12 months to relocate utility poles and aerial facilities within the Project Limits.

NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Utility Coordination – Existing Utilities – Relocations by Others 15 Underground – Verizon:  Verizon has various buried cables within the project limits. The more notable placements include:  1) originating in the NE corner of Southern Blvd crossing NY Route 347 and runs approximately 2100’ on the south side of NY Route 347,  2) at both Lake Avenue and Gibbs Pond Road Verizon utilizes multiple pole to pole drops to span the intersection both east / west and north / south.  Verizon’s Conduits may require relocation due to conflicts with new drainage lines; Verizon will require approx. 1 to 2 weeks per offset (Manholes cannot be re-located).

NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Utility Coordination – Existing Utilities – Relocations by Others 16 Underground – Cablevision:  Cablevision has a PVC duct bank system Serving Avalon Commons from a pole drop on the north side of NY route 347.  Cablevision will require 2 to 3 weeks after coordination with Design-Builder to relocate underground cables.

NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Utility Coordination – Existing Utilities – Relocations by Others 17 Underground – National Grid (Gas):  National Grid will require 8 to 10 weeks to relocate the 8” Steel Gas Main from the Center Median to the South Side of Route 347;  National Grid will be responsible for relocations and tie-ins to services and crossing mains.  There are 4” steel & PE gas mains on Southern Blvd, Lake Ave and Gibbs Pond Road. There are also 2”, 4” & 6” building gas service lines crossing under NY Route 347 at numerous locations within the project corridor.  In the event of side road drainage improvements gas mains should be maintained and protected if possible.

NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Utility Coordination – Existing Utilities – Relocations by DBer 18  Design-Builder will coordinate with impacted utilities 2 weeks in advance of a relocation and conduct surface preparations and rough grading as needed prior to the relocation.

NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Utility Coordination – Existing Utilities – Relocations by DBer Suffolk County Water Authority:  The 12 inch water main on NY 347 in the vicinity of the center median from Terry Rd to Lake Ave. shall be relocated to the north side of NY 347 by the Design-Builder;  There are also 8”, 10” & 12” diameter water mains that run under Southern Blvd, Lake Ave and Gibbs Pond Road. In addition to 4” & 6” building water service lines crossing under NY Route 347  The Design-Builder shall be responsible for all costs to design and reconstruct these mains as well as all service connections, hydrants, valves, water meters, etc. 19

NY Route 347 (DB Phase 3) Design-Build Project (PIN , D900033) Questions and Answers Questions On Utilities? 20