QCG Report Francesco Forti University and INFN, Pisa.

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

16/12/02GS/ALICE TB 1 Update on the ALICE Grounding Plan From draft document (June 02) The grounding plan for ALICE proposed in this document is based.
Configuration Management
Quality Assurance U. S. ITER Project Office U.S. ITER Project 1 November 15, 2006 U. S. ITER QUALITY ASSURANCE Gail Okulczyk, Presenter U. S. ITER Quality.
Requirements Specification and Management
Step by Step Guide for Regulations S HELLY B EZANSON K ELLY O FFICE OF G ENERAL C OUNSEL S EPTEMBER 5, 2012.
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
EQUIPMENT VALIDATION.
Business Management CPD Presentation External Verification School SQA Co-ordinators will receive notification of Verification Selection and Verification.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Computer Engineering 203 R Smith Requirements Management 6/ Requirements IEEE Standard Glossary A condition or capability needed by a user to solve.
1 Software Requirements Specification Lecture 14.
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
CBIIT Quality Assurance Process Preston Wood NCI CBIIT Government Quality Representative (GQR) January 2014 RS.
Software Configuration Management
Configuration Management Avoiding Costly Confusion mostly stolen from Chapter 27 of Pressman.
Auditor Responsibilities January 16, 2014 State Training Webinar 2014 CSP Contract Compliance Audit 1 AD14002.
Hot Checkout System for Accelerator Operations at JLab Ken Baggett (Team Leader) Theo Larrieu Ron Lauzé Randy Michaud Ryan Slominski Paul Vasilauskis.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Amr Zeid Cherouk Aly Mohamed Salem
BP, OQ & You. 2 Why do we have OQ? Walnut Creek 3 Bellingham Washington.
Health & Safety Site Verification Audit Procedural Training F b RevNo: 0 / Omni Facility Services Health & Safety Site Verification Audit.
S oftware Q uality A ssurance Part One Reviews and Inspections.
INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
Dreamweaver Domain 3 KellerAdobe CS5 ACA Certification Prep Dreamweaver Domain 6 KellerAdobe CS5 ACA Certification Prep Dreamweaver Domain 6: Evaluating.
S Q A.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
 CS 5380 Software Engineering Chapter 2 – Software Processes Chapter 2 Software Processes1.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Selecting Evidence Based Practices Oregon’s initial attempts to derive a process Implementation Conversations 11/10.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
Copyright 2010, The World Bank Group. All Rights Reserved. Recommended Tabulations and Dissemination Section B.
Science & Engineering Research Support soCiety Guest Editor Guidelines for Special Issue 1. Quality  Papers must be double -blind.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
Dec
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Implementing Program Management Standards at Duke Energy.
Comments on ladder structure 5 Feb Toru Tsuboyama.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors and Applications.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
 System Requirement Specification and System Planning.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
Configuration Management
Final CALICE OsC meeting: Status and summary of project
Oral Exam Information Session
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Configuration Management
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
Meetings.
SVD group organization, schedule, milestones
Presentation transcript:

QCG Report Francesco Forti University and INFN, Pisa

Outline Jan 21, 2015SVD QCG2 view/Detector/SVD/SvdQCQAGrou p

Site Qualification Sites need to be officially qualified before starting to work production level components Class definition of components: So far we have done class C qualification: o Requires all final assembly steps except for the electrically functional class B module o Necessary to move to the class B modules Nov 9, 2014F.Forti: QCG, Qualification3 ClassDefinition AProduction quality component. Good for installation BFully functional component, but of reduced quality. Not installed CMechanical, not electrically working component, but with all the features and precision of a class B (chips, sensors, wirebonds) DMechanical component, posssibly with missing chips, no wirebonding, aluminum sensors, reduced precision

Site qualification reviews The reviews help the groups to o Design stable and reliable procedures o Document the procedures and the QC/QA o Communicate with other sites o Organize the manpower and schedule It should not be a one-time event, but rather a work method The SVD QCG is responsible for qualifying the sites. The QCG will appoint a review committee that will report to the SVD group A qualification site visit the committee is required. Nov 9, 2014F.Forti: QCG, Qualification4

Outcome of the reviews (I) Pisa on Oct 4, IPMU on Oct 31, HEPHY on Jan 19. o All sites have demonstrated the ability to build class C modules and also to test modules electrically o Reviews are positive, with some comments. Pisa (Fwd/Bwd assemblies) o Only backward class C modules were produced with final jigs and procedures: confirmation will be needed for forward modules o Some adjustements and final checks are required IPMU (L6) o Produced module C-1/C-2 are not fully class C (not all wirebonds are present, some parts are not class C) o Procedures are nearly, but not completely final and require some adjustement and finalization o Required to produce C-4 with completely final procedures (including documentation and DB usage) Try to use working (class C) origamis/sensors  get a partially working module. Nov 9, 2014F.Forti: QCG, Qualification5

Outcome of the reviews (II) HEPHY (L5) o Produced Class C module is not mechanically qualified yet: need to survey it to verify precision o PA1/2 gluing procedures need further optimization o Required to produce another class C to finalize procedures (also needed for mechanical interference tests). Followup o We will need to schedule the followup class C reviews (they can be done remotely) as soon as the sites have resolved all the issues. o Time frame: february – march o They could be combined with the class B review, depending on the situation at sites. Jan 21, 2015SVD QCG6

Sign-off To ensure we obtain good quality components, we need to increase the level of formality with which we define the component specification and approve them. Sign-off is the process by which the entire collaboration ensures that a portion of the design is compatible with all the rest and authorizes the corresponding fabrication It has technical and an administrative components: o Full specifications and production plan o Verification and sign-off o Change control 1/8/2015F.Forti: Sign-off procedures7

Full specification and production plan Before production can start a component needs to have: Full technical specifications including: o Mechanical and/or electrical schematics drawings. In case the final design is produced by the company, only a conceptual/preliminary design is included o Quality assurance and quality control plan. What design checks need to be done What production tests needs to be done and by whom A full production plan: o Schedule for the delivery of components o Schedule for the tests and qualification of components 1/8/2015F.Forti: Sign-off procedures8

Verification and sign-off After the technical specifications and production plan are defined (typically by a single person or a subgroup): They should be made available to the full collaboration on a twiki page (the verification and sign-off page) The QCG/SVD Leaders will produce a full list of people who should be checking the design and notify them o The list will be published explictely on the twiki page o People will have to explicitely send a positive sign-off via , or make comments/change proposals o In particular one needs to check all the points of interface to other pieces of the system Final sign-off (authorization) will be produced after alla the relevant people have said YES. 1/8/2015F.Forti: Sign-off procedures9

Change control After sign-off production can start The design of that part is FROZEN. It cannot be changed without a proper change control procedure. Change control procedures: o Specific and written proposal to change the design with a new version of the specifications published on the twiki page o Again fully checked by all relevant people The list needs to be revised to make sure the changes are correctly reviewed Also review administrative/financial implications if production has already started. o The new specifications are approved after all relevant people have said YES. 1/8/2015F.Forti: Sign-off procedures10

Sign-off implementation Sign-off page created: o nsSignoff Try to use this system for the PA production, which should be starting in a few days. It is essential that we all agree on the system an collaborate to make it work. Jan 21, 2015SVD QCG11

QCG Open issues Ladder design o Definition of ladder mechanical tolerances Now possible after feedback from assemlbly procedure o Verification of thermal (-30 to +60 C) and mechanical properties on ladders (deformations and vibrations) Planned in next 2 months at different sites o Verification of possible ladders mechanical interference on rings Needs to be planned – requires precisely assembled cooling rings. Verification of a full electrically working ladder o With simultaneous readout of all sensors Jan 21, 2015SVD QCG12

QCG Open issues Ladder assembly procedures o Clear definition of all coordinate systems and survey points o Finalization of several assembly procedure details Wrapping/gluing of PA1/PA2 Glue reinforcement of PF1 and PB1 to avoid peeling Definition of bonding redundancy and bonding tests in production Gluing of the cooling pipe clip on the FW slanted detector o Streamline the database usage for production checklist and measurements storage and comparison o Definition of the ladder transport container o Detailed definition of production ladder thermal tests Ideas proposed, but need to be finalized o Detailed definition of electrical QA during production Now possible after experience with pinhole plucking and module testing Jan 21, 2015SVD QCG13

QCG Evolution Initially focused on assembly procedures and sites qualification o Need to define how to track quality during the production period Naturally expanding into defining the QC/QA procedures for the entire system Probably a redefinition of membership is needed o Also using the new SVD organization that is picking up speed. Jan 21, 2015SVD QCG14