Environmental Scoping Meeting April 9, 2014. Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.

Slides:



Advertisements
Similar presentations
Public Scoping Meeting December 3, 2012
Advertisements

Scoping Meeting Yuba Goldfields 200-Year Flood Protection Project Environmental Impact Report June 23, 2014.
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
Sacramento Local Agency Formation Commission (LAFCo) Draft Environmental Impact Report SMUD Amendment of the Sphere of Influence and SMUD Yolo Annexation.
Solid Waste Integrated Resources Plan Draft Program Environmental Impact Report Solid Waste Integrated Resources Plan Draft Program Environmental Impact.
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
Draft Program Environmental Impact Report Public Meeting November 30, 2011.
1 State Water Resources Control Board Environmental Review for State Bond Funded Grant Projects Presented by Lisa Lee, Environmental Review Unit.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
City of La Habra Heights CEQA Scoping Meeting Matrix Oil Field Redevelopment Project Environmental Impact Report April 16, 2014.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Draft Equine Ordinance POD
WEST OAKLAND SPECIFIC PLAN (WOSP) & DRAFT ENVIRONMENTAL IMPACT REPORT Update to WOSP Steering / Technical Advisory Committees April 3,
JOHN WAYNE AIRPORT PROPOSED SETTLEMENT AGREEMENT AMENDMENT & EIR 617 Presented to: Orange County Business Council Infrastructure Committee Presented by:
Planning Area Standards May 18, Outline of today’s meeting Introductions Recap of previous community meetings Planning Area Standards Discussion.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
David Rizk, DirectorKevin Colin Development Services DepartmentLamphier-Gregory, EIR Consultant South Hayward BART/Mission Blvd Form-Based Code Draft Supplemental.
1 Cold Spring Canyon Bridge Proposed Suicide Barrier Project Information Meeting & Open House Sara von Schwind Caltrans Project Manager.
Skyline Heights City of Corona Scoping Meeting March 4, 2014.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
CA Regional Water Quality Control Board San Diego Region CEQA SCOPING MEETING: TENTATIVE CLEANUP AND ABATMEMENT ORDER (CAO) NO. R January 21,
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
Planning & Community Development Department Conditional Use Permit #5029 and Other Land Use Entitlements: Final Environmental Impact Report and Statement.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
1 Completing the CEQA Checklist Terry Rivasplata.
Solar Energy Research Center Project CEQA Public Scoping Meeting May 26, 2010.
CEQA and the Delta Plan Presentation to Delta Stewardship Council February 24, 2011.
U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS.
White Hill Middle School Initial Study/Mitigated Negative Declaration Ross Valley School District Community Meeting November 1, 2011.
Durham Villas Planned Unit Development TSM & REZ Morris Bud Keeney Butte County Board of Supervisors December 11, 2012.
Prepared by: Alex Fisch Planning Services Division.
City and County of San Francisco Scoping Meeting Environmental Impact Report (EIR) PURPOSE To solicit participation in determining the scope.
Community Development Department Neoga Lakes Future Land Use Map (FLUM) Amendment.
Inn at the Village DZA , VTTM , UPA , & DR Town Council Public Hearing November 19, 2014.
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Joint Public Hearing - Closed Redevelopment Agency & City Council Amended and Restated Redevelopment Plan for the North Stockton Redevelopment Project.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
Planning & Community Development Department Contract to provide Environmental Consulting Services for the Rehabilitation and Reuse of the Pasadena YWCA.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Buena Park General Plan Update Overview Presentation.
City of Oceanside Melrose Drive Extension Public Scoping Meeting March 13, p.m.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
July 4, 2017 AURORA UNITED CHURCH + SOUTHBOUND DEVELOPMENT LTD Yonge Street, 55&57/57A Temperance Street, 12&16 Tyler Street General Committee Meeting.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
Scoping Meeting April 20th 6:00 pm
Overview of the Draft EIR
Providence Saint John’s Health Center Phase II Project
Introduction to the California Environmental Quality Act (CEQA)
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Jefferson County Planning Commission Hearing April 10, 2013
Facebook Campus Expansion Project EIR
City of Los Angeles Department of Public Works Bureau of Engineering
NORTH TRUNK SEWER REPLACEMENT PROJECT
NORTH TRUNK SEWER REPLACEMENT PROJECT
Overview What is the CEQA environmental review process?
South San Gabriel Boulevard Pacific Square SG Scoping Meeting Case Planner: Tracy Steinkruger, Planning Manager.
Fifth Standard Solar Project Complex
City of Los Angeles Department of Public Works Bureau of Engineering
Tam O’Shanter Rezoning
SEQRA as a Tool to Review Energy Projects
Hercules Planning Commission
Vista Verde Residential Project Environmental Impact Report Public Scoping Meeting May 19, 2010 Michael Brandman Associates.
Brackish Water Desalination Project Draft EIR
Final Environmental Impact Report
Draft Equine Ordinance
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Environmental Scoping Meeting April 9, 2014

Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process Topics to be Addressed in the Environmental Impact Report Public Input

1.84 acres 50 Canyon Blvd, to the west of Minaret Road and north of Main Street/Lake Mary Road

Hotel  64,750 gross square feet of buildable floor area  a maximum lodging room count of up to 67 rooms North Village Specific Plan Amendments  an increase in the allowable development density for the project site by 30 additional bedrooms;  an increase in the allowable building height (an additional 40 feet plus an additional 1.5 feet for roof appurtenances); and  a reduction in the required front yard setbacks for the upper floors of the hotel along Minaret Road

Purpose of CEQA To disclose information about potentially significant environmental effects of a project; To identify ways to avoid or mitigate significant environmental impacts. To enhance public participation in the planning process; and To foster interagency coordination in the review of projects.

Purpose of the Scoping Meeting Inform the Public of the Proposed Project and the Town’s Intent to Prepare an SEIR; Present an Overview of the Environmental Review Process; Review Topics Requiring Further Study in the SEIR; and Receive Public Comments Regarding Environmental Topics and Issues of Concern.

The Initial Study/Notice of Preparation begins the CEQA Process  30-Day Public Review Period (March 26, 2014 – April 24, 2014) Prepare and Publish the Draft SEIR  45 day public review period  Respond to Comments Present the Final SEIR to the Planning and Economic Development Commission and Town Council

Tiered Analysis Approach  Program EIR covers many actions, or long-range plans characterized as one project. The 1991 North Village Specific Plan (NVSP) and associated amendments were considered as part of the 1991 NVSP Program EIR and 1994 Addendum.  Subsequent EIR addresses subsequent project activities in light of a previously certified Program EIR. In 1999, the NVSP underwent an Amendment that resulted in the 1999 Subsequent Program EIR.  Project-Level Subsequent EIR would be required for the proposed project. This project level analysis will tier from the previous program level environmental analysis.

Aesthetics  Scenic Vistas  Visual Character/Quality  Light and Glare

Air Quality  Short- and Long-Term Emissions  Consistency with GBUAPCD Policies Greenhouse Gas Emissions  Emissions from mobile and stationary sources Land Use  Consistency with the Town’s 2007 General Plan, North Village Specific Plan, North Village District Planning Study, and Town of Mammoth Lakes Municipal Code

Traffic and Circulation  Level of Service Impacts to Local Roadways  Construction Staging  Site Access  Parking

Utilities and Service Systems  Water Supply  Water and Wastewater Facilities Noise  Construction and Operational Effects  Effects to Nearby Residents

Cumulative Effects  Other Related Development Projects Alternatives  A range of Alternative in Accordance with the Requirements of CEQA

No Environmental Impact/Mitigated to Less Than Significant by the NVSP PEIR, Addendum, and SPEIR  Agriculture and Forestry Resources;  Biological Resources;  Cultural Resources;  Geology and Soils;  Hazards and Hazardous Materials;  Hydrology and Water Quality;  Mineral Resources;  Population and Housing;  Public Services; and  Recreation.

Written Comments on the Initial Study/Notice of Preparation are Due by: April 24, 2014 Comments Submitted to: Ms. Jen Daugherty Senior Planner Town of Mammoth Lakes 437 Old Mammoth Road, Suite R Mammoth Lakes, California