FESS/Ops Shutdown Summary Week Ending 3Aug12. CUB Shut-Down Activities Shut Down Plant on July 21 hrs. Electrical – High Voltage Air Switch/Fuse.

Slides:



Advertisements
Similar presentations
Enrollment No Enrollment No Enrollment No Enrollment No Enrollment No UNIVERSAL COLLEGE.
Advertisements

Air and Water Chiller Basic Class
Substation L1/ MCC L1 Update March 21 st, Current Location.
1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
GNI0003H PP1 Loop Trainer. GNI0003H PP2 Reason for Study Because the Loop Trainer gives instructors the capability to control water flow, pressure and.
AFFILIATED ENGINEERS, INC. THE UNIVERSITY OF TEXAS MEDICAL BRANCH (UTMB) AT GALVESTON Presented to Houston Area Association of Hospital Engineering July.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
Technician License Course Chapter 9 Lesson Module 20: Electrical Safety.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Flanders Electric – Engineering Division Welcomes Youto an Overview of Reconditioned Switchgear.
Electrical Power Systems
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Electricity Calculating Electric Power When installing new appliances, equipment, tools, or any type of electrical convenience, it is important to know.
Freedom Combi Inverter
© 2005 by West Pharmaceutical Services, Lionville, PA. All rights reserved. This material is protected by copyright. No part of it may be reproduced, stored.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
Electrical Review Electricity Resistance Insulator
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
Electricity Current Voltage Resistance Current, Voltage, Resistance characteristics AC DC Plugs Earth Fuses Power.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Computer Operations Group Data Centre Facilities Hitendra Patel June 2015.
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
Air Handler Terminology
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
N VAV system varies the air quantity rather than temperature to each zone n Single main duct is run from AHU n Branch duct are run from this main through.
PIP Update 3 September 26 th, L1 Future Plans  Installation is halted until further notice (plan for 2014 shutdown or when needed)  Substation.
EU 1000i and EU 2000i SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
1 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion & CCW Piping Thomas F. Joos, PE Lead Civil/Structural Engineer CFAC Review March 10-11, 2009.
Keeps heat indoors in winter and outdoors in summer – means lower heating and cooling bills Rated by it’s R-value. The greater the R- value the better.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
EN-CV interventions during YETS
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
Power Distribution System General Location. Power Distribution The Main Switchboard is the hub of the electrical distribution system. Everything ties.
What is POWERGRID??? The Power Grid Corporation of India Limited (POWERGRID), is an Indian state-owned electric utilities company headquartered in Gurgaon,
Submitted to: Submitted by:
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Staying in Compliance Dispensing Equipment Spill/Overfill Presented by Travis Benton United Pump and Controls, Inc.
JPMorganChase Data Center Houston, Texas.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
FESS/Ops Shut Down Summary Week Ending 9/7/12. – FESS needs a CUB Cooling Outage for installation of Barriers in the CUB Chiller 4160 Volt Starter Cabinet.
Recycler/Ecool Shutdown Planning Meeting (6/4/2010)
FESS/Ops Week Ending 1/20/13. CUB Status – Boiler #1 ON LINE CB Kramer due in to Wire in second recirculating Pump and install NFPA 70E mitigations –
FESS/Ops Shutdown Summary Nov 9 th, CUB Status – Boiler #1 ON Primary Recirculating Pump repaired Second Belly Pump to be Wired – Boiler #2 OFF.
7 A/C System Components, Operation, and Service.
TC meeting P2 planning wks 3&4 A.Tauro
FESS - OPS SHUTDOWN UPDATE. ELECTRICAL Feeder 46A Cable tie in - COMP. A0,C0, E0 CRYO Transformers & Switchgear - Not Complete Master Substation - COMP.
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
This talk is not a summary of costs for conventional facilities This talk is Review of conventional facilities used by CDF Discussion of status of systems.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
S A Griffiths CM42 June 2015 Electrical & Control.
1 Taming the Data Center SDR 1.3 Butch Adkins Infrastructure & Operations.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
Automotive Heating And Air Conditioning
Air-cooled Lineup OR WHOLE HOUSE TRANSFER
Unit 13 Oil-Burning Equipment
Introduction to Mechanical Engineering
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Engineering Technology Division
CUB Outage Schedule April 21, 2006.
Cooling technology Main components and equipments
EN-CV interventions during EYETS for PS and PSB
Electrical Gas Plumbing Heating & Cooling
Aziz AMAMOU EACM – 21th May 2019
Presentation transcript:

FESS/Ops Shutdown Summary Week Ending 3Aug12

CUB Shut-Down Activities Shut Down Plant on July 21 hrs. Electrical – High Voltage Air Switch/Fuse Annual PM – Measured 4160 Cabinet for protective Barrier Installation – Replaced Chiller # X120 Volt Transformer – Found 4 Ea. Damaged Control Circuit Plugs on 1500 Amp DHP Breakers Called in Machinists to fabricate replacement parts

CUB Shut-Down Activities Electrical (Continued) – CUB E Gen Transfer Switch Repaired – Repaired LCW De-oxygenation Skid Starter Connections (identified through Thermography) – MCC2 Replaced Faulted PONI Modules

CUB Shut-Down Activities Mechanical – Replaced 12” Suction Valves on CP10/CP11 Process Chilled Water Pumps for Muon/MI60/MI65 – Chgd. Muon LCW Filters – Performed PM on all Circulating Pumps – Inspected and Cleaned tower Water Pump Strainers Restarted Plant July 22 nd 1530 hrs

4 Bay S&C Switch Maint.

13.8 X 480 Volt Transformer Maint.

1500 Amp DHP Breaker Control Circuit Plug Stationary Receptacle

1500 Amp DHP Breaker Control Circuit Plug

Chiller # X 480 Volt Transformer

4160 X480 Volt Transformer Replacement

E Gen Transfer switch Repairs

CP10/CP11 Suction Valve Replacement

Process Chilled Water Strainer Media Found in CP10/CP11 Valves

Additional ICW Filter to Softeners Installed

Temporary AC Units Set up to provide required Cooling

XG Computer Room West

XG Computer Room East

Control Room

MAC Computer Room

WH Telecom Switch Room

XG FIRUS Room

WH Basement 90 Ton Chiller

G2 Service Bldg./Beam Pipe Grout Removal Cooling

WH Storm Water Pit Sump

~ 15 Cu. Yds. Of Gravel in Sediment Basin

We all Float Down Here