Subsidence at Conaway Ranch, Yolo County Tad Bedegrew October 29, 2015 North Central Region Office - DIRWM Geology and Groundwater Investigations Section.

Slides:



Advertisements
Similar presentations
Nebraska Water Management Nebraska Department of Natural Resources September, 2004.
Advertisements

Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Simulation of Potential Mobility of Contaminant Plumes Prepared for Sacramento Central Groundwater Authority July 13, 2011.
Bob Mashburn Army Regional Environmental Office Atlanta, Georgia ARMY CLEANUP PROGRAM – Status Update –
Mine Construction. Start of Barge Landing area. A trailer, excavator and generator. Early Barge Landing June 2007 with one trailer to start construction.
Kansas Water Congress July 31, District Update  Multi-Year Flex Account  Hays – R9 Ranch  Index Well installed.
“That’s Not A Levee Boil !” or “How to do more with less” By Glen Pearson, Northern District 2005 Annual Geology and Groundwater Meeting Geology and Groundwater.
NC Department of Public Instruction Division of Financial Business Services School Allotments Section.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
The Nevada Department of Agriculture Water Quality Program The Nevada Department of Agriculture has been involved in groundwater protection since 1990.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.

Well Systems. Well System Capacity Well system capacity needs to be large enough to supply daily water need in 10 to 12 hours. Some designers assume 5.
Impacts of Open Arctic to Specific Regions By: Jill F. Hasling, CCM Chief Consulting Meteorologist – MatthewsDaniel Weather September 2014.
For more info visit at For more info visit at
Agenda August 5, Introduction – Natalie Robottom 2.Background and History – Rob Delaune 3.Present Conceptual Engineering Design Proposed Tasks -
 Remembering Joan on the 5 th Anniversary of her death.
Droughts, Climate Change, and the Energy System
PG&E and CISN: An Earthquake Country Partnership Stu Nishenko CISN Advisory & Steering Committees Meeting October 13, 2010 Sacramento CA.
Presenter: Scott Prinos, Hydrologist, USGS February 17, 2012
Heat-Related Illness in Older North Carolinians Sara Smith, CHES Lauren Thie, MSPH October 2, 2015 Triad Aging Conference.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
“Saving York Factory” Project 2007 Hydrology Report LeeAnn Fishback Scientific Coordinator Churchill Northern Studies Centre January 15, 2008.
Downtown Project Scope Downtown Project Reality.
Cedar Valley/ Northern Utah Valley July 9, Agenda   Background   Groundwater Hydrology   Current Conditions   Water Rights   Proposed.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Calendar for 2011 Months of the Year with Holidays.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
TDL Forum JULY 16, 2013 DEBRA HANKEN KURTZ, Executive Director RYAN STEANS, Director of Operations KRISTI PARK, Program Coordinator.
Orange County/City of Maitland Joint Planning Area Agreement Twelfth Amendment Public Hearing Board of County Commissioners October 5, 2010.
© Hamilton Trust Keeping Up Term 3 Week 3 Day 3 Objective Count up to find a difference between four-digit numbers.
An Overview of Other Ongoing DWR Programs. Other Programs Turf and Toilet Rebates Model Water Efficient Landscape Ordinance Leak Detection Desalination.
 Household Water Consumption By: Saagar Enjeti. My Household Impact MonthGallons Used June41,140 July20,944 August19,448 September5,984 October5,236.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
SBN Near Detector Building Conventional Facilities Update Steve Dixon LAr1-ND Collaboration Meeting 16 September 2014.
June 13, 2013 Presented by: California Department of Water Resources Flood Management Programs Status and Interactions.
Tobacco Retail Licensing Yolo County Steven Jensen: LLA Project Director (530) (before November 30)
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
Plaistow BOS Meeting 7/24/2017
Stormwater Management
Deadline for Requisitions Payment Processing Date
A Quick Look at the 2017 Water Level
Chris Bonds, PG, CHg CA-DWR Stream Depletion through the SGMA Lens:
Deadline for Requisitions Payment Processing Date
Engineering Technology Division
Regional Water Supply Plan Team
Presented By: Fran Borcalli, P.E. Program Manager
Desirable Results Since 1998
Pine cove pit time lapse drone photos
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Hoptown-Christian County WINS Project Updates
August 28, 2018.
McDonald’s Kalender 2009.
Marija Mokorić and Lovro Kalin
McDonald’s calendar 2007.
Strategic Planning Timeline Overview
Tropical cyclones movement
February 2007 Note: Source:.
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
Sacramento Environmental Commission January 2019.
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Simulation of Potential Mobility of Contaminant Plumes
Presentation transcript:

Subsidence at Conaway Ranch, Yolo County Tad Bedegrew October 29, 2015 North Central Region Office - DIRWM Geology and Groundwater Investigations Section

Presentation Outline Background Information Construction Info Period of Record Recent Activity Future Plans Continuous recording/CDEC 2

Location 3 Davis Woodland West Sacramento Yolo County Sacramento County

Construction Information

Extended Period of Record 5

2013 Water Transfer 6 20 Pumping Wells ~5,700 AF Pumped for Transfer July – September

2013 Displacement 7

2014 Water Transfer 8 22 Pumping Wells ~14,000 AF Pumped for Transfer May – early September

2014 Displacement 9

2014 Survey 10 Extensometer Survey showed ~6” of subsidence at Extensometer location

2014 Survey Comparison 11

2014 Extensometer Modifications 12 ~2” May 27, 2014

2014 Extensometer Modifications 13 5/27/14 6/16/14 7/8/14 8/7/14 ~1” ~2” ~4”

2014 Extensometer Modifications Round 2 14 ~4” August 12, 2014

Slip Joint seized up? Subsidence occurring between 620’ and the surface? Combination of the two? Why?

2015 Water Transfer Pumping Wells ~5,400 AF Pumped for Transfer Late May - June

2015 Displacement 17

Current Recording Equipment years old No longer continuous recording, must move pin manually Visiting Conaway Extensometer weekly since May 2014 due to activity

Future Plans 19 Installation of digital shaft encoder Continuous recording using CR1000 Data Logger Cellular Telemetry CDEC?

NASA JPL InSAR 20

Questions? 21