L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

Electrical and thermal testing at Glasgow and Liverpool.
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
January 6. January 7 January 8 January 9 January 10.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 6” Origami Module and Front End Electronics 6 th Open Meeting of the.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
PH-DT Infrastructure Investments M.Capeans SPOB meeting CERN, 20/3/14.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
Origami Chip-on-Sensor Design: Progress and New Developments 19th September 2012 TWEPP 2012, C. Irmler (HEPHY Vienna) TWEPP 2012, Oxford University.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
Status of AMS02 Integration Area in Building 867 January 10, 2007.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
8. February 2012 Thomas Bergauer (HEPHY Vienna) SVD Construction Database SVD-PXD meeting.
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
SunSatFriThursWedTuesMon January
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Dec
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 1 Towards Ecal Assembly Julien Bonis
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Brussels Gantry Ê Problems with vacuum chambers in plate 4 mostly solved by the workshop in Aachen (thanks) Ë Problem with rotation motor (U-motor) 4 motor.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Comments on ladder structure 5 Feb Toru Tsuboyama.
SVD assembly S.Tanaka. Outline SVD assembly work is individual with Beam pipe, heavy metal shield and PXD system. –Assembly work will be done on two assembly.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
Logistics 1 – To/Between Assembly Sites M.Friedl (HEPHY Vienna) 2 October 2014.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors and Applications.
ALD Technology Transfer – Progress Update LAPPD2 Godparent Review Aileen O’Mahony 5 th April 2013.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
25 April 2013 Thomas Bergauer (HEPHY Vienna) Components and ladder quality control and testing procedures Belle II Vienna-Pisa meeting.
L5 Assembly 10 Sept C. Irmler (HEPHY Vienna) 8 th Belle II VXD Workshop OS5.905.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Status & schedule of ladder parts production Oct. 2, 2014 Koji Hara (KEK)
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
ELENA installation progress F. Butin / ELENA collaboration.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Summary Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 6 February 2013.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
BM&N STS ladders assembly in VLHEP
Florian Buchsteiner (HEPHY Vienna)
Ladder Assembly All tools and jigs produced Glue dispensing works
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
SVD Ladder assembly at IPMU
Katsuro Nakamura Sep. 10, 2015 VXD meeting
News about the WA104 Programme
Ladder Assembly All tools and jigs produced Glue dispensing works
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
Overview of the Frascati Production Facilities
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
UK RFD Pre-Series cryomodule
Module/Ladder Assembly
Teleconference ACS – FREIA 20th February 2018
HL-LHC upgrade at IPHC news
SVD group organization, schedule, milestones
C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna
Presentation transcript:

L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany

L5 Ladder Assembly 2Christian Irmler (HEPHY Vienna)5 February rectangular HPK + 1 trapezoidal Micron sensors 2 Origami hybrids (-z, ce) Complex assembly procedure Several consecutive gluing, wire bonding and measurement tasks –aligned sensors fixed on assembly bench by vacuum –all tasks to be performed in a climate controlled environment Glue dispenser, coordinate measurement machine and wire bonder should be in the same room

Present Situation at HEPHY Two cleanrooms –Large (42 m²): houses sensor test facility and wire bonder –Small (16m²): coordinate measurement machine (CMM) and gluing equipment Need to change location between gluing and wire bonding –How to solve continuous vacuum supply of jigs? (assembly bench) –Continuous climate control impossible Non-satisfying and DANGEROUS! 3Christian Irmler (HEPHY Vienna)5 February 2013

Present Situation at HEPHY 4Christian Irmler (HEPHY Vienna)5 February 2013 Clean rooms Wire bonder CMM Electronics assembly Removable wall (metal)

Present Situation at HEPHY 5Christian Irmler (HEPHY Vienna)5 February 2013 Small clean roomLarge clean room Wire bonder CMM

Comparison: Situation at IPMU Single clean room housing –Coordinate measurement machine –Wire bonder –Gluing equipment –Assembly tables –Whole assembly possible in the same room We want to set up a similar assembly room 6Christian Irmler (HEPHY Vienna)5 February 2013

HEPHY Clean Room Extension 7Christian Irmler (HEPHY Vienna)5 February 2013 Clean room for sensor tests Ladder assembly clean room Electronics assembly stuff will be moved to another room Wall will be removed Clean room can be extended to almost twice its actual size

New Ladder Assembly Clean Room 8Christian Irmler (HEPHY Vienna)5 February 2013 CMM Wire bonder Climate chamber CMM, wire bonder, assembly table and storage in the same room Plan to purchase a climate chamber for thermal testing Central vacuum tubes (maybe suspended from ceiling)

Schedule 9Christian Irmler (HEPHY Vienna)5 February 2013 January 2013: Clean up future room for electronics assembly Early February 2013: prepare services for electronics assembly 5+6 February 2013: paint and clean the room End of February 2013: Transfer and reinstall electronics assembly machines March 2013: –Prepare electrical installation and services in new clean room –Remove the wall –Paint (with special non-dusting paint) and clean the room April 2013: –Relocate wire bonder –Commissioning of new ladder assembly clean room

Thank You! 10Christian Irmler (HEPHY Vienna)5 February 2013