I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.

Slides:



Advertisements
Similar presentations
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Advertisements

Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Capital Beltway HOT Lanes Project Project Update March 2009.
Capital Beltway HOT Lanes Project Project Update April 2009.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Grade Separation Alternative
The Hale Street Link Project. Project Vision The Hale Street Link Alliance will build a landmark, inner city bridge to enhance accessibility and livability.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Titusville to Edgewater Bike Loop PD&E Study
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
West Contra Costa Unified School District
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Santa Maria River Bridges Widening. Project Location.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Current Construction Projects Major Projects Pinellas County.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
I4Ultimate.com: the I-4 Ultimate website TransComm2015 Awards 9a) Website, with consultant.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
Presented by: Department of Transportation - Toll Bridge Program New Benicia-Martinez Bridge Project.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
San Diego Trolley. Current Current/future expansion Propose extension.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
Peachtree Road Transformation Project: Operations and Safety Analysis P.I Fulton County August 25, 2015 Buckhead CID 1.
JOHNSON STREET BRIDGE PROJECT COUNCIL WORKSHOP MAY 21, 2009.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
District 11 CEAL Meeting: Bike/Ped Update SETH CUTTER DISTRICT BICYCLE AND PEDESTRIAN COORDINATOR APRIL 13, 2016.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Major MnDOT Highway Improvement Projects West Metro
Monet & Treviana HOA ― Construction Open House November 17, 2016
Orange County Transportation Authority
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
Highway 169 Bridge Replacement & Pavement Resurfacing
The Construction team appreciates this opportunity to discuss the work that will begin in October on State Road 397 over Toms Bayou. My name is Mike Sasser,
Coffee & Construction Developer Meeting
Contract 60X10 Informational Meeting Weber I-55
Metropolitan District | mndot.gov
Presentation transcript:

I-5/Genesee Avenue Interchange Project

Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and widen existing Genesee Ave. overcrossing Construct new, separated bike facility west of I-5 linking Sorrento Valley train station with UC San Diego and area businesses Accommodate local and regional employment and population growth Accommodate future carpool lanes on I-5 2

3 New Bridge Cross-Section Convert the existing six lane overcrossing into 10 lanes

New Bridge Cross-Section 4

Bridge Simulation 5

Sorrento Valley to UCSD Area Bike Path 6 A new, separated bike path on the west side of I-5 will connect the Sorrento Valley train station & the UCSD area Currently, cyclists must use freeway shoulder to travel from Sorrento Valley to UCSD. Rendering The new bike facility will allow bicyclists to travel in both directions from Roselle Street to Voigt Drive separated from vehicles.

Project Schedule and Funding 7 Construction begins in February 2015 Construction completed in 2017 $1.7 $22.9 $47.9 Funding (in $ millions) $11.7 $21

Project Timeline – Stage 1 (3 weeks) 8 What to expect this stage: Intermittent traffic delays but no lane closures No pedestrian access within project limits Bike access maintained via I-5 shoulder Placement of concrete barriers for construction preparation

Project Timeline – Stage 2 (16 months) 9 What to expect this stage: Intermittent traffic delays, overnight lane closures as needed Genesee Ave. widening Genesee Ave. bridge construction (north side of bridge) Retaining wall construction Bike access maintained via I-5 shoulder No pedestrian access within project limits Bike facility construction west of I-5

10 Project Timeline – Stage 3 (9 days) What to expect this stage: Median work on Genesee Ave. Traffic on Genesee Ave. bridge shifts to new north side of bridge Genesee Ave. reduced to four lanes within project limits I-5/Genesee Ave. on/off ramp weekend closures No pedestrian access within project limits No bike access during on/off ramp weekend closures Retaining wall construction

11 Project Timeline – Stage 4 (Approx. 14 months) What to expect this stage: Intermittent traffic delays, overnight lane closures as needed No pedestrian access within project limits Northbound bike access maintained via I-5 shoulder Southbound bike access available via new bike facility Retaining wall construction Genesee Ave. bridge construction Genesee Ave. widening

12 Project Timeline – Stage 5 (4 months) What to expect this stage: Construction of bike/pedestrian overcrossing Final re-striping of new Genesee Ave. bridge Project completion!

What to Expect During Construction 13 Regular traffic operations The majority of lane closures will take place overnight Access points to nearby hospitals will be maintained throughout construction Bike access during construction will be maintained on the I-5 shoulder

Other Golden Triangle Area Projects 14 Gilman Dr. Bridge Project (Construction begins early 2016) Voigt Dr. Widening Project (Construction begins fall 2016) Genesee Ave. Interchange Project (Construction begins early 2015) MidCoast Trolley Project (Construction begins 2016) Bridge Structure North

Stay Informed Sign up for project updates at: KeepSanDiegoMoving.com/contact You’re Invited! – Construction Workshop: January 21, 2015 –La Jolla Country Day School – 9490 Genesee Avenue –5 – 6:30 p.m. Check out alternative commute choices at icommutesd.com Call the project hotline at (888) or us at 15