PAC Meeting July 2, 2014. Agenda  Introductions and thanks  Project to date  Next steps  Questions.

Slides:



Advertisements
Similar presentations
U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
Advertisements

expansion-to-claim-vital-Iron-Range-highway KARE 11 News Story 2.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Environmental Impact Statement and Preliminary Engineering Public Scoping Meeting Tuesday, November 15, 2011,
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
ODOT – FHWA Environmental Performance Measures February 2012.
NEPA and Property Acquisition May 19, 2014 Elizabeth Patel Environmental Protection Specialist FTA Office of Planning and Environment.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
New I-65 Interchange at Worthsville Road Welcome!.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Environmental Assessment Public Meeting
Longmeadow Parkway Fox River Bridge Corridor
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Forest Plan Revision Using the 2012 Planning Rule Process Overview Steps and Expectations (I don’t know….but I’ve been told…if the horse don’t pull….you.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
I-90 Snoqualmie Pass East Project Tanya Lamb Urban Geography, GEOG 481 Description 15-mile stretch Hyak (MP 55.1) to Easton (MP 70.3) 2010 scheduled to.
August 30, 2012 Cost Estimate Review Closeout Presentation St. Croix River Crossing Project Minnesota and Wisconsin.
New I-65 Interchange at Worthsville Road April 11, 2013 Welcome!
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
Orlando-Orange County Expressway Authority Project Development Process.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
Planning Commission Study Session: Preferred Plan July 23, 2015.
ECNM Meeting October 1, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects.
RIVERSTONE CONNECTION STUDY Task Force Meeting #4 June 19, 2013.
 Working with FHWA on review.  Submit to Cooperating Agencies (EPA and Corp of Engineers)  45 day review May  Respond to agency comments  Publish.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
FHWA CMGC Workshop October 23, Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue.
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
Available at: hwy53relocation/sco ping.html hwy53relocation/sco ping.html.
 HDR, Ott Constructability, Dan Brown  Visit and boat tour of Rouchleau pit ◦ Access better than potrayed ◦ Challenging geotechnically 
 HDR, Ott Constructability, Dan Brown  Visit and boat tour of Rouchleau pit ◦ Access better than potrayed ◦ Challenging geotechnically 
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
2035 General Plan Update Planning Commission Study Session on Draft Circulation Element February 2, 2016.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Willow Meadows Civic Club Meeting September 13, 2011
Environmental Critical Areas Regulations
Draft Transportation Element September 6, 2017
Fifth Standard Solar Project Complex
Construction Management & Inspection
Brackish Water Desalination Project Draft EIR
Presentation transcript:

PAC Meeting July 2, 2014

Agenda  Introductions and thanks  Project to date  Next steps  Questions

Project Purpose The purpose of the US 53 project is to address the termination of the 1960 easement agreement that affects the current highway location in order to continue to provide a transportation facility that will safely maintain adequate roadway capacity and mobility as well as local, regional, and inter-regional connectivity

Project Needs  Respond to the roadway easement terms; address the requirements set forth in agreements between the State of Minnesota and the land owner  Provide a facility that meets regional and inter-regional system connectivity needs and inter-regional highway corridor performance targets  Maintain local connectivity to the regional system and maintain efficiency of local connections  Provide a facility that serves current and future capacity needs while maintaining system mobility and safety

Project Goals  Constructing a permanent direct connection for US 53  Allowing United Taconite to mine the existing US 53 area in a timely manner  Minimize future resource encumbrance

Key Milestones  Scoping Document  February 2012  Scoping Decision Document  September 2012  Amended Scoping Decision Document  September 2013

Routes in the Amended Scoping Decision Document

Alternative M-1  Pros  Cons

Alternative E-1A (Reinforced Soil Slope Fill)  Pros  Cons

Alternative E-1A (Bridge)  Pros  Cons

Alternative E-2  Pros  Cons

Environmental Work To Date  Traffic  Right-of-Way  Economic and Business  Parks & Recreation/Section 4(f)/6(f) Lands  Cultural Resources  Land Use  Environmental Justice  Social, Neighborhood, and Community Facility Impacts  Visual and Aesthetic Impacts  Utilities  Water Supply and Water Body Modification  Wetlands  Surface Water/Water Quantity and Quality  Geology and Soils/Soil Erosion  Noise  Air Quality  Vegetation and Cover Types  Fish & Wildlife/Threatened & Endangered Species  Hazardous Materials and Contaminated Properties  Excess Material  Geotechnical and Earthborne Vibration  Climate Change  Construction Related Impacts

Technical Work To Date  Subsurface Taconite Assessment and Drilling Report  Alternative M-1 Air Quality Mitigation Assessment  Traffic Analysis Technical Report  Water Management Study  Water Resources Technical Report  Cultural Resources Evaluation Reports  Estimate of In-Situ Resources  Environmental Site Assessments  Noise Impacts Technical Report  Geotechnical Engineering Report  Seismic Study  Economic Impact Study

Draft Environmental Impact Statement  Status  Reviewed by FHWA  Final revisions then ready to be reviewed by other agencies  EIS Process  Publication of Draft EIS  Public comment period  Identification of the preferred alternative  Final EIS  Record of Decision

Engineering Issues (for all alternatives)  Probably the most challenging project in the nation  Geotechnical  Unknown, non-homogenous mine fill  No similar examples worldwide  Stability for high fills and bridge foundations

Examples of Challenges  Alternative E-1A – highest reinforced soil slope in the country  Bridge foundations – fill  Hardest rock in the world  Limited construction seasons  Accessing the pit areas  Seismic impacts  Water quality concerns/drinking water  Mine standards

Geotechnical Impacts  Costs  High fill  Material needed  Placement techniques  Time and seasonality  Bridge structure and bridge foundation type

Fill Type

What is being done to address issues?  Drilling in the Rouchleau Pit (2013 and 2014)  Test cores  Seismic testing  Rotosonic sampling  Soil borings and exploration along routes  Geological mapping  Researching old records  Dewatering study  Numerous technical experts on specific topics from MnDOT and nationwide working as a team

Test Foundations Contract  Three different types of bridge foundations  Drilled shaft  16” and 24” drilled pile  Project letting – July 25  Anticipated start date – August 11  Pre-bid meeting – July 9 (view site and access)

Drilled Shaft and Drilled Pile

Test Foundation Results  Determine feasibility of construction within the existing fill material  Indicate best type of foundation and time to place  Will guide the bridge or fill type specified  Provide schedule and cost information

Next Steps Upon Test Contract Completion  Analyze test results  Determine bridge type/fill specifications  Update cost estimates  Continue with EIS process  Refine construction schedule

Frequently Asked Questions  Will the road be closed?  MnDOT is working to avoid a road closure  What is the new timeline?  Unknown at this time, but the next steps are…

Frequently Asked Questions  What is the current project cost?  Alternatives range from $240 million to $460 million  Where will the money come from?  Funding is being sought from state and federal sources, including grants and special programs

How will the project schedule be expedited?  Concurrent activities  Design  EIS  Easements being negotiated  Design factors include rapid construction techniques  CMGC construction

Questions?

Coffee & Conversation  Thursday, July 3, 2014  10:00-11:00 am at MnDOT  Thursday, August 7, 2014  10:00-11:00 am at MnDOT