Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Update on the bakelite gluing Feb 2002: first warning from BaBar  13 gaps (over 48) accepted (27%) (i.e. max 2 non contiguous unglued spacers)…the remaining.
sTGC for ATLAS Small Wheel upgrade
MAGIC II Mirrors and reflector M. Doro Udine. MAGIC Collaboration Meeting. 2006/05/10-13.
Status of the LHCb RPC detector Giovanni Carboni - Roma 2 Introduction Detector requirements Ageing tests Oil vs. No-Oil Conclusions Report to LHCC - March.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
PNPI in LHCb A.Vorobyov HEPD Scientific Board meeting, December 26,2003 Status report for 2003.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
Atsuhiko Ochi Kobe University 25/06/2013 New Small Wheel MicroMegas Mechanics and layout Workshop.
Ferrara 8 june 2004M.Savrié1 Production Readiness Review Ferrara MWPC Production Site.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Production Readiness Review Production steps and quality control 1.Panel production 2.HV bar gluing 3.Preparation of side material 4.Wiring and gluing.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
September 9, 2003A. Cardini / INFN Cagliari1 M. Alfonsi 1, G. Bencivenni 1, W. Bonivento 2, A.Cardini 2, C. Deplano 2, P. de Simone 1, F. Murtas 1, D.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Panel production status Panels needed according to official plan Oct-05 A rate of 250/month is mandatory to match the chamber production schedule.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
30 October 2003V.Souvorov / B.Schmidt - MWPC PRR CERN site1 MWPC Aging Studies Outline: Overview of aging tests done Results in terms of gain variations.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43.
G. PassalevaFirenze - September 8, 2004 Production Readiness Review Firenze MWPC Production Site G. Passaleva.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Concept Design for LBNF Far detector (LAr single phase)
Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Soldering Basics.
Drift Chamber Prototyping Plans at ODU Gail Dodge, Tom Hartlove, Mac Mestayer Nov. 18, 2005 Goals for FY06: Design 144 cell prototype of R1 Drift Chamber.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Profiler Mechanics Update
We started last December: 32 channels prototype “Julich like” to:
Year 7 Resistant Materials- Prep Work
Gaseous Beam Position Detectors, with Low Cost and Low Material Budget
Situation of Yb:YAG Thin Disk Laser for A1 Ground Laser Hut
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)

Panels As discussed in our last meeting 2 main activities on panels 1)Produce a batch (6-10) with same technique and few upgrades 2)Prepare the mould for preseries production (Dec-Jan) This work is ongoing (5 new panels this week) In the meantime we got 6 new (small, 35x25 cm2) panels from the new company contacted at the end of September (Internormal, Chieti, 250 km east of Rome) Internormal is a mid-size company (20-30 employees) with a production of large size polyurethane elements (eg. train seats) and several different injection machines, thermal stabilizing circuits and experience in large productions. Controlled areas also available for “clean” productions

The 6 panels show good quality, both in term of planarity and foam quality. They look also very clean. The panels were kept in the mould 20’-40’ As example, the weight of the panel is controlled at 3%. Noticeably, the result achieved with no interactions with the company ! This test witnesses very good expertise in mould design and in foam technique Smaller panels could be obtained without cut from larger moulds We also got a preliminary quotation for a production of 30 panels/day with 2 moulds This new fact suggested us to shorten the test we are doing, bring back to LNF the mould, speedup the mechanical upgrade of it and send to Internormal for a production test

Soldering tests with the machine after mechanical upgrades

Parameters of the tests performed last week Laser power (range 50-80% of 20 W) Soldering speed (and sequence of movements). Now 2 s / wire Speed of the soldering wire feeder Soldering on gold plated pads “less” easy (more power needed, or maybe, slower). Past tests all performed on tin plated printed boards Even in this case, very good quality, fast, clean (on L-head#1) On the L-head#2, erratic distribution of tin, more polluted, probably due to different soldering wire feeding (under check and correction) Safe operation between two pads (final check with longer HV bars) Rescan with laser can correct local imperfections Final goal: optimize parameters to reduce power (cleaner soldering)

Site and tooling status Wiring machine : combs ordered and mechanics under completion Wire tension measurement : drawings ready, material procurement underway (Rome 1). Ready by Feb. Panel planarity check tool : Rome 2 is taking care of it HV bars gluing tool : Firenze is taking care of the test of a new (simpler) solution LNF clean room : room completed, waiting for filters and conditioning (bid had to be repeated, ready by Jan)

HV bars and Cathodes Semi final cost quotation (after a long discussion) Tooling for large cathodes production : 100 keuro Total cost estimate in our CORE : 870 ksf 4 configurations considered 1.R4 copper, rest 1 cathode + 1 ground g.plated : 880 ksf 2.R4 copper, rest 2 cathodes g.plated : 970 ksf 3.M1 1 cathode + 1 ground g.plated, R4 copper, rest 1 cathode + 1 ground g.plated : 945 ksf 4.M1 2 cathodes g.plated, R4 copper, rest double cathode g.plated : 1040 ksf Synergies with CSC-ALICE ? Under consideration

Aging tests December, 16-20, one week to study ENEA-Casaccia Co 60 irradiation site (free of charge) and to prepare the real one 2 small chambers and 2 GEMs will be installed at different distances from the source to find suitable locations Real aging test 30 days at 100 nA/cm = 0.25 C/cm equivalent to (if G=10**5) 2.5 y of LHCb in M1R3 or 5 y in M2R1 Can we go to higher current densities ? Gas heating due to high rate (W=VI=3000 x 1 mA = 3 W / gap) ? True test in spring ? Final materials needed

+7 cm layout, available on LNF-LHCb web site, together with all other numbers

Conclusions Soldering tests with final setup show no surprises An industrial production seems now feasible. Struggling against required precision and systematic effects Tooling and site (LNF) : should be ok for June start ! Warning : with lack of decisions (or continuously changing layout) no material will be available by June Big bids (Panels, Cathodes, HV bars, Wire) = long administrative time (at least 6 months)