RuggedPOD Proto 1 bugs SDS team Wolfe Engineering.

Slides:



Advertisements
Similar presentations
ETF Activities Boyle’s Law Lemon Battery.
Advertisements

Injection Molding MFG 355.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Manual Flo-tap Installation Instructions
Build Your Own Computer Ed Evans Information in this presentation Copyright 2005 PC Media, Inc. All rights reserved. Reprinted with permission from
1 FUEL SYSTEM SERVICE ENGINE CLEAN FUEL TOOL MODEL RX 777.
Installation. Indoor Unit Installation Typical Installation.
Cleaning of the Optical Block, Critical Orifice, and Focusing Nozzle of the Brechtel Model 1710 Mixing CPC.
Arc Welding Equipment
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
3U ATCA Shelf October Proprietary and Confidential-
2035 Series. Common Components The design of the 2035 Series valve includes many proven components for assured reliability. These items include: –Same.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
Building a Computer Kate Chapin Capstone Project.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application MekElekItroniks Design Review Battery Charger Project.
Installation. Indoor Unit Installation Typical Installation.
TP4-ENERSOL-TD/PV double function
Overview Test Interface (TIU PCB‘s) are extremely expensive.
Motherboards. Parts of a motherboard Motherboards connect the diverse elements of a PC, enabling them to communicate with one another and work together.
Sales Training Outline 2006 Jeff Roye Product Manager DIN Enclosures 35 Royal Road Flemington, NJ
Chapter 3 Computer Assembly. 3. Introduction Assembling computers is a large part of a technician's job. This Chapter will teach you how to work in a.
ELECTRONIC FUEL INJECTION COMPONENTS
Critical Current Probe Mid-Point Review Amy Eckerle Andrew Whittington Philip Witherspoon Team 16 NHMFL Applied Superconductivity Center 1.
June 2008 R&D Center / BCS HW Team Introduction to iPECS P5 Hardware.
ZTF Interconnecting Scheme Stephen Kaye
Gasoline fuel supply systems Function: store, transport, Pressurize and filter gasoline going to carburetor or fuel injection system.
Building a PC Tim Wells. What You Need Required:  Case  Power Supply  Motherboard  Processor & CPU Fan  RAM  Graphics Card  Hard Drive  Keyboard.
Setting up the Ricoh C305 Press F5 to start the Presentation
Your Connectivity Partner. Locations Main Office: High Tech Products Lallio, Italy USA Office: HTP Connectivity Parsippany, NJ.
Please read all the instructions carefully before the installation. Installation shall be carried out by experienced mechanic. Follow the steps in the.
© Penn State Food Safety and Sanitation for Food Manufacturers Course Equipment Sanitary Design.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco PublicNew CCNA Jianxin Tang IT 1 V4.0 Ch3. Computer Assembly—Step by Step.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
-Proprietary and Confidential-
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
FUEL TANKS, LINES, FILTERS, and PUMPS CBCAUTOMOTIVERKCBCAUTOMOTIVERK.
Smart Agent Installation Required Customer Connections 5 Core Power Cable To Laser Head 1.Power To Laser Head 2.Ethernet 10/100 Connector 3.Mains Input.
1 Polarimeter build up and details Robert Lee. 2 View 1 Material (Removable plate, leg supports and rail guide spacer): Aluminum Leg supports attached.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 13 Fastening Metal.
1 Jim Thomas - LBL Sector Tools – a conversation with Jon Wirth and Eric Anderssen August 28 th, 2015.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
Installing Guttering and Rainwater Systems
INSTALLING HARDRIVES AND FLASH DRIVES Objective: install a flash drive and test the installation. How is a Flash drive different to a Hard Drive? Hard.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
Arc Welding Equipment Welding Machines AC – (alternating current) used for most agricultural arc welding jobs and has low purchase cost compared.
AGRICULTURAL MECHANICS I UNIT I:METAL SKILLS COMPETENCY:AM26.00 Research arc welding equipment. OBJECTIVE:AM26.01 Compare types of arc welding machines,
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
Correspondence with HuntVac. Jan 13 Sven, Thanks for the call. Just to recap (and so I don’t lose my notes): · Redesign AL box vessels. · QTY.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
ELCO CONNECTOR PRODUCTS : JAPANESE AVX CONNECTOR PRODUCTS OVERVIEW Slide 3 Wire Products Memory Products Other Products ELCO Japan Products Summary.
Chapter 16 GMAW and FCAW: Equipment Assembly and Adjustment Miller Electric Mfg. Co.
HOW TO BUILD A PC Simple, quick and comprehensive beginners guide to how to build a personal computer.
HB RM prototypes Ianos Schmidt Aug 17, 2017.
Presentation created by Jared D.
Hawkeye Mechanical Design Snapshot
Nematron® EnduraTouch II 17” Enclosed Computer Launch
CL4NX +Dispenser (KITTING MANUAL)
Nematron® EnduraTouch II 17” Enclosed Computer Launch
Chapter 11 Lesson 3 Engine Top End.
Cryomodule Assembly Plan
1.11: Robot Controller.
Reader Swap out Guide.
Presentation transcript:

RuggedPOD Proto 1 bugs SDS team Wolfe Engineering

Liquid Leak Hypothesis – Liquid leak is coming from poor welding between panels – We did not experienced liquid leak on our early prototypes welded in France Panel material: AS7G03 – European aluminum alloy for die casting. Is it available in the US ? – Welded successfully in France with the following procedure – Pre-heating to C with a welding torch to remove oxidation, improve welding grip and reduce gas emission during welding process – Use TIG process with Argon and AG3 filler Rod – Is this ROD available in the US ? – Keep the material pre-heated during the process Liquid leak due to premature failure The original design was using locking mechanism between panel (see the following top view) This locking system was on top part of the panel and has been removed by the machining process reducing potential material to material contact and pushing the pressure support to the weld. Extreme forces on cube edge without locking mechanism which could probably led to weld failure if they are not strongly attached French proto style have in die casting rail support increasing thickness by 5 mm on some area making the panel much stronger

Gas Leak The top plate was misaligned on the prototype, not sharing the same plane than its support containing the Oring. We do not really know from where this misalignment is coming from, but it could be perhaps from the welding process of the support to the tank, which has involved some twisting of the support. Can we check ? One work around could be to use a thicker oring.

3 Pails doesn’t fit We need 3 Pails of 5 Gallons oil Oil is available as Pail or drum. Drum are much less expensive but contain 45 Gallons. Can we have a single drum of 15 Gallons compliant with oil ?

Blade bending Move to stainless steel material

Screw doesn’t fit SSD mounting hole

Wire length (bug 6/7/8/9/10) Before After Change wire routing, and add some wire strapping. (position will be transferred on sept 22th)

Wire length (bug 6/7/8/9/10) Before After Change wire routing, and add some wire strapping. (position will be transferred on sept 22th)

Wire length 5v/12V to DCDC cable lenght : 65mm DCDC power cable lenght : 75mm AC/DC to backplane cable lenght : 85mm Backplane to ethernet switch : 4x60mm Raspberry to ethernet switch : 100mm Switch power cable : 35mm All dimensions doen't inculde connectors head length

Soldered connection on Fisher are exposed We need to find a kind of threaded cork to hide the wires. Fisher do not seem to provide it and the threaded is a custom one. We didn't find something that fit at this time but can continue the dev program without it through thermal shrink protection Maybe the solution will be to make a custom one

Top cover cables are not guided

Raspberry PI mounting holes Standoff are now M2.5

Backplane PCB mounting screws Will be changed for next pass

USB power cable for RPI not pluggable after backplane positionned We can use this type of USB cable

Cables on Blade are loose

Need a slot for an optional Vacuum Pump Robinair Vacuum pump 1.5CFM/min Warning: Missing cable between vacuum inlet to POD. We need the vacuum cable Intake fitting: ¼ inch flare and ½ inch Acme intake port Voltage: 110V More info : Can Jabil supply us this pump ?

Need a slot for an optional oil transfer pump Bio-Diesel-Gas-Transfer-Pump-W-Meter-Hose- Nozzle-/ Bio-Diesel-Gas-Transfer-Pump-W-Meter-Hose- Nozzle-/ Can Jabil supply us this pump ?

Impossible to fully empty a POD

When serial is connected to a motherboard we observed some random POST failure on MSI core i7 board MSI board wiring Connectic board wiring COM 1 TX RX J52 RX TX Connect RX (com1) on RX(J52) and TX (com1) on TX (J52) This was a bad wiring approach

POD is hard to move (handle positioning)

Label on electronics part need to be withdrawn Will be done for next batch

Top cover not aligned with support We believe that this is a duplicate of Gas leak bug and that we can close this one. The main target is to avoid any gas leak

Mechanical conflict between raspberry pi, wires and power supply We will use right angle connectors to avoid collision, the raspberry positioning has been changed,

Define a sealing test procedure

Explain in documentation how to position O-ring

Lots of screws, deliver pods with electrical screwdriver

Mechanical conflict between ethernet wires and cover We can use this type of RJ45 cable 1

Mechanical conflict between power supply and rails The rail must be shortned by 15 mm

Add a cable guide for every internal cable even on blades

Add a GFCI to every ruggedpod We need to find one for north america market and one for european market

Blade collision with PSU

Add a network switch support