Ventilation A presentation for Presented by Tim Kaye 14 th May 2015.

Slides:



Advertisements
Similar presentations
Using Ground Source Heat Pump The Avenue Centre.
Advertisements

BUILDING AIR CONDITIONING
Heating, Ventilating, and Air-Conditioning
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Tas seminar/demonstration on Part L 2006 of the Building Regulations Presented by Alan Jones EDSL February
TYPES OF MECHANICAL SYSTEMS
The Role of Controls for Indoor Air Quality Kent W. Peterson, PE, Fellow ASHRAE P2S Engineering, Inc. Mid Columbia ASHRAE Chapter.
Heat Recovery for Commercial Buildings
Pollution Control PPT03A 1 POLLUTION CONTROL an Overview POLLUTION CONTROL an Overview.
Key HVAC Design Concepts. Agenda Discuss relevance of thermal enclosure system to HVAC system. Present the three major steps to design an HVAC system.
Components of HVAC System
HVAC: heating, ventilating, and air conditioning this is a thermostat: it sends signals to the heating/cooling system.
pae consulting engineers, inc. Nick Collins, P.E., LEED™ AP
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
BRE Energy Efficient Office of the Future
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
Engineer Presentation
Lindab Pascal - Simplified VAV solution with full potential...
Passive House Seminar for the Professionals from the Building Sector.
Energy Management with the use of an Intelligent Building Management System.
Brett Graham Habegger Corporation Midwest Regional Sustainability Summit May 1, 2015.
A GLOBAL CORPORATION WITH EUROPEAN ORIGINS No. 1 in Europe 5 continents 40 countries 92 regional offices worldwide 630,000 units sold.
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Passive Technologies and Other Demand-Side Measures.
Air Side System Evaluation
Objectives of NatVent This seven nation pan European project aims to reduce primary energy consumption (and consequently CO2 emissions) in office type.
Energy Performance Certificates
1 HVACR416 – Design Principles Air Exchange. 2 HRV’s (Heat Recovery Ventilators)
PASSIVE HOUSING By Serena Mehta Passive housing or Passivhaus  “A Passivhaus is a building, for which thermal comfort can be achieved solely by.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Energy efficiency in buildings Monga Mehlwana Tuesday, 05 October 2010.
Lindab Solus - Simply the natural choice.... lindab | comfort Chilled beam revolution! + Save up to 45 % cooling energy!* + Installation and investment.
Group 21: Sustainable Building Materials By: Lynda Angus ( ); David Duffy ( ); Leanne Fitzgerald ( );
The Renson Headquarters Renovation issue Renovation issue Major findings Major findings The RENSON- The RENSON- Headquarters More information... More information...
The EWZ building Presentation of the building Presentation of the building The design issue The design issue The building concept The building concept.
Design of HVAC systems for bld 3862 – LHCb control room and for bld 2885 – LHCb new workshop.
Maintain IAQ with Energy Recovery Ventilators (ERVs) A ENTERPRISE Visit us at INTRODUCTION TO ERV.
Heat Exchange Ventilation Heat Exchange Ventilation.
Work Package 1 Perceived Barriers to Natural Ventilation Design of Office Buildings The objective of the study was to identify perceived barriers restricting.
Air quality made simple A Balanced Approach Whole House Ventilation and IAQ Airflow Control Make-up Air Solutions Application by Geographic Region.
We can…. 2 GLOBAL REFERENCES Rev: 00 References :
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
CIBSE HCNW 28 August 2014 Modular boilers. Traditional or low-tech replacement boiler installation; Multiple boilers eg 2 no 66% of load for security.
FLEXIBILITY = Tecniplast is ready and willing to satisfy all the customers needs and provide the right solution for a professional outcome STAND ALONE.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for buildings - Calculation methods for the determination.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for non-residential buildings - Performance requirements.
The key to comfort and reduced fuel use for all heating and cooling The key to comfort and reduced fuel use for all heating and cooling.
1 Energy Solutions for Production Supported by: The sole responsibility for the content of this presentation lies with the authors. It does not necessarily.
Location: Rockler Headquarters, Medina, MNRTUs: 1 Founded in 1954, Rockler Woodworking & Hardware is a specialty store dedicated to bringing woodworking.
Architecture Supported by:
Product Awareness, Commissioning & Maintenance
Heat transfer Steady state conditions not for dynamic systems in buildings through walls, roofs, floors, windows, doors building structures and U-values.
Free Air Cooling for Data Centres
Air source heat pump Understand the fundamental principles and
ENV-5022B/ENVK5023B Low Carbon Energy
Maria’s Restaurant Chapter 1 Section 4
Wega & Wega Power chilled beams
CHAPTER 8 Ventilation.
Heating Ventilating and Air Conditioning
Voyager II and III – Energy Recovery Modules
Chilled Beam Performance:
Heat recovery feature Competitive approach
CHAPTER 3 VENTILATION.
CAPRI Cables Private Limited
ENV-5022B/ENVK5023B Low Carbon Energy
Frenger “Radiant” chilled beam performance at 1 Shelly St - Sydney
FBE03: Building Construction & Science
Objective Revie the Cooling Cycle Learn about air distribution systems
Presentation transcript:

Ventilation A presentation for Presented by Tim Kaye 14 th May 2015

Airmaster – a recap… What’s it all about? Approaches to ventilation Regulation changes Next steps Presentation Outline

We manufacture highly efficient decentralised heat recovery ventilation systems Our product philosophy Flexible ventilation solutions No ducts Demand controlled Highly efficient Innovative Energy saving Quiet* * more on this later… Introduction to Airmaster

Localised ventilation – no ductwork Ventilation units located in the rooms they are serving So what is “decentralised ventilation”? Traditional system Central AHU Ductwork throughout the building Decentralised system Local AHUs No Ductwork throughout the building Intelligent demand controlled ventilation Perfect for new build, simple to install for refurbishment projects

Air Supply Air Extraction Air Intake Air Exhaust What do we do? principles

WALL MOUNTED RANGE

How do we do it? Installation Examples

AM 900 AM1200

How do we do it? AM 1200

Cooling module FOR AM 100, 500, 800 & 1000 units ”Plug and Play” ® solution Cooling module is attached to the ventilation unit. No external components. Low noise Inverter controlled Energy efficient New product development

AMS m 3 30dB(A) 0.9W/l/s SFP Bypass damper Filter choices including M5, F7 & F9 No ducting Delivers over 9l/s per person for typical classroom New product development

Why do we do it? Noise Options with ambient noise level of 65bB(A) Natural ventilation – classroom noise level 55dB(A) Airmaster decentralised heat recovery ventilation – 35dB(A)

Founded in 1991 by Kim Jensen and Henrik Stæhr. Today we employ 78 colleagues in Denmark and manufacture in 3 premises. We have 9 people in R & D. Airmaster A/S is represented in Several European countries, and has it‘s own sales companies in Sweden & the UK. Number of factors to consider when selecting ventilation including: Approaches to Ventilation Single sided Cross flow Stack Natural Ventilation Natural supply & mechanical extract Central air handling unit Decentralised heat recovery system Mechanical Ventilation – Location of school and ambient noise levels – Exterior pollution levels – Energy demands – Climate – Security – Room layout

Benefits No energy used during operation Can use windows as a method of ventilation Uses natural cooling therefore removing the need for mechanical air conditioning Reduces energy consumption required for cooling Can use night time purging to cool thermal mass No noise from mechanical fans or motors Natural Ventilation

Limitations Uses 12 times more energy than high efficient heat recovery systems No heat recovery Limited or no controls available – often relies on manual operation Inconsistent air volume compared to demanded rate CIBSE suggest over 3,000 climatic conditions which can affecting ventilation Limits on room design and layout Noise transfer through terminal/window Draughts No filtration of supply air If windows used to provide ventilation, security issues need to be addressed Natural Ventilation

Can use either Air handling units – central system Decentralised units Range of different types of heat exchangers… Heat Recovery Ventilation Plastic Good efficiencies Retains condensate Airflow creates static – dust sticks to surface Easily deteriorates Paper Ermm… Aluminium Good efficiencies Long lasting Clean

Benefits All mechanical components contained within the air handling unit Easy to service and maintain – air handling unit Heat recovery of energy from the exhaust air Range of different heat recovery options available – Thermal wheel – Plate heat exchanger – Run around coils Commissioning of mechanical elements of the air handling units is relatively quick Lower capital cost (excluding ducting and grilles & diffusers) Heat Recovery Ventilation – Central Plant

Limitations Expensive installation cost Need space for ductwork to run through the building Difficult to retro fit Air handling units sized for a particular application, difficult to extend onto the system when building’s requirement changes “One size fits” all approach to air supply, conditioned at the air handling unit and supplied to all the rooms connected Can provide demand controlled ventilation however very expensive solution with dampers to control air volume – need to be serviced annually in Denmark Penetrates fire compartments throughout the building requiring additional intumescent measures (fire collars, fire dampers, duct wrap etc.) Attenuators required on ductwork to ensure transmitted noise is minimised Heat Recovery Ventilation

Heat Recovery Ventilation – Decentralised Self contained supply and extract ventilation system Complete with counter flow heat exchanger Filters on both supply and extract air Connected to outside through wall or roof Air volume is regulated depending on demand

Heat Recovery Ventilation – Decentralised Benefits Ventilation only in those rooms that require it Simple to install No ductwork through the building Large savings on what additional heating is required Can be used to extend ventilation requirements on existing buildings No pressure losses through ductwork No energy used moving air volume through ductwork resulting in very low specific fan power (SFP) <1 W/l/s No additional components required (attenuators, diffusers)

Worked Example Primary School – Input parameters LocationLondon Classroom60m 2 No. Classrooms8 No. People/classroom25 Fresh air per person8l/s Total fresh air 1,600l/s Hours operation per day8 No. days per year194 Indoor temp22  C Supply air temp16  C Boiler typegas Boiler efficiency85%

Results Ventilation Alternatives

Results Results - CO 2 Emissions Natural Ventilation & mechanical extract Heat Recovery 50% efficient Heat Recovery 84% efficient Natural Ventilation 100%89%64%22%

Results – Energy Usage Natural Ventilation & mechanical extract Heat Recovery 50% efficient Heat Recovery 84% efficient Natural Ventilation 100%97%35%8% Results

Best practice Incorporate high efficient heat recovery exchanger Incorporate energy efficient components wherever possible; – Low energy EC fans – Counterflow heat exchanger – Summer bypass damper Incorporate night time cooling Ensure ambient noise transmission is reduced to minimum levels Ensure ventilation system can be simply serviced/maintained Key Figures Natural ventilation uses 12 times more energy compared to high energy efficient heat recovery decentralised units Natural ventilation produces over 4 times more carbon emissions Airmaster can reduce ambient noise transmitted through the unit by over 54dB(A) Summary of ventilation options

Founded in 1991 by Kim Jensen and Henrik Stæhr. Today we employ 78 colleagues in Denmark and manufacture in 3 premises. We have 9 people in R & D. Airmaster A/S is represented in Several European countries, and has it‘s own sales companies in Sweden & the UK. Quality of Ventilation in the Classroom There are a wide range of ventilation strategies adopted throughout the schools in the UK. Studies show that ventilation rates in classrooms vary massively Old classrooms make use of windows and infiltration/exfiltration Recent trends have been to use “natural” or “passive” ventilation” Indoor Air Quality in Schools – what happens in reality Teachers didn’t open the windows; – Noise/disturbance from outside – Cold draughts – Wasting energy

Airmaster’s reality – Primary School data log Key Highlights 13/2/14 Average outdoor CO 2 concentration 455ppm Average CO 2 concentration during school day 770ppm Highest CO 2 concentration during school day 1040ppm Running cost£0.21 per day Heating energy saved 20kWh CO 2 saved4kg Heating cost saved£2.89

BB93 updated last year BB101 currently going through review Insight into my first meeting… Still heavily biased towards natural ventilation I have added an alternative voice for mechanical ventilation Want a level playing field Should be trying to create the best, healthiest learning environment for the children Changes to regulations

BB101 due to be published end of this year Some key changes include; – No draughts – air needs to be mixed before entering occupied zone – Can no longer “pre heat” air using radiators – Air can’t be cooler than the room by more than 5⁰C – Need to incorporate “night cooling” into any scheme Observations from Airmaster include; – Focus on overheating in summer time – Focus on cooling classroom using thermal mass – No recognition on heating requirement – Difference between CO 2 concentration depending on ventilation systems – Reference made to controls but appears to be reliance on teacher operation Changes to regulations

Airmaster would like to; Build on the relationships with the Modular Building companies Understand your typical project type Develop strong relationships with all key influencers including; – Consultants – Architects – Contractors – End users Why should we do this? Move forward together to create healthy learning environments Raise the energy issue Provide simple to operate, quick to maintain solutions Offer demand controlled ventilation – only ventilating when required Next steps