Ochre Volume Minimisation Matt Dey or Ochre Concentration The School of Engineering.

Slides:



Advertisements
Similar presentations
Overview of Water Treatment
Advertisements

North Texas Municipal Water District Water Treatment Process.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Biological Treatment Processes
Sewage and Effluent Treatment 2-4 November 2002 Seán Moran -The first few slides.
ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.
Treatment of Slaughterhouse Wastewater
Anne Arundel County Department of Public Works
Biological waste water treatment
Bioreactor Analysis and Operation Chapter 9&10 (textbook)
CE 370 Filtration.
Nutrient Removal Project: Chemical Phosphorus Removal Jill Crispell, Stephanie Wedekind, Sarah Rosenbaum.
Phosphorus Removal at Sand Creek Water Reuse Facility by Duane “Bear” Steib and Kathy Bill/City of Aurora Steve Polson/CH2M HILL by Duane “Bear” Steib.
INTRODUCTION TO THE TREATMENT OF TANNERY EFFLUENTS
1 Adelaide Poultry. 2 Onsite WW Treatment Brief Background ● Prior to mid-2002, a DAFF plant was installed ● Tonkin Engineering was consulted to design.
Surface Water Treatment Plant
Sustained Treatment of AMD Containing Al and Fe 3+ with Limestone Aggregate Neil Wolfe and Robert Hedin Hedin Environmental West Virginia Mine Drainage.
1) Introduction Koruma Industry Koruma Tarım Established in 1949
20,000 Barrel Per Day Produced Water Treatment System
Introduction to Odour Control Technologies
Aeration Approaches and Activated Iron Solids (AIS) for AMD Treatment By Jon Dietz, Ph.D. Environmental Engineering & Science Iron Oxide Technologies,
Attached Growth Biological WW treatment Systems
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Folklore in Activated Sludge Treatment Plant Operations
Remediation schemes to mitigate the impacts of abandoned mines Brian Bone Environment Agency for England and Wales.
CEE 453 Research Project Chris Garnic Nolan Rogers Creating Ideal Floc for Instant Startup of a Conical Flocculator.
Dissolved Oxygen Treatment Calculation Water Treatment Team June 23, 2015 Presenter: Phuong Mai Teammates: Greg Kirton D. Caruthers Cortez Rankin Robert.
Kavita Mahulikar and Taylor Reiss Cornell University 10 December 2005
CHEE 370 Waste Treatment Processes
LIPPO CIKARANG Wasted Water Treatment Plant
1 IV. Wastewater Treatment technologies Topic IV. 9. Wastewater Treatment Facilities with Suspended Biomass - Aerated Tanks: Kinds, Structures, Basic Technological.
CARBON DIOXIDE STRIPPING: -Fundamentals -Computer Design Model
PHOSPHORUS REMOVAL FOR LAGOON OPERATORS WHY THE CONCERN OVER P.
Phosphorus Removal in a Membrane Reactor System— A Demonstration Study Wayne Lorenz, P.E. and Matthew J. Gavin Wright Water Engineers, Inc. and Newell.
The Living Machine & Leachate
James M. Ebeling, Ph.D. Research Engineer
ENVE 420 Industrial Pollution Control
Processing, distribution and use of water.
DAF System Air Supply Pressurizing Pump Retention Tank
The Drinking Water Treatment Process
5.2 Freshwater Pollution. Water Pollution Is the introduction of chemical, physical, or biological agents into water that degrades the quality of the.
DECENTRALISED WASTEWATER TREATMENT AND REUSE Components and Designing
Materials Balances with Multiple Materials Only one equation can be written for each black box unless there is more than one material in the flow Example.
Sewage Treatment.
Chemical Treatment Precipitation and Reduction/Oxidation (Section 9-4)
SETA Water treatment plant maintenance
DESIGN OF WASTEWATER TREATMENT PLANT
Water Treatment for the Recycling of Process Rinse Water
1 IV. Wastewater Treatment Technologies Topic IV. 10. Wastewater Treatment Facilities with Attached Biomass - Trickling Filters: Kinds, Structures, Basic.
Flow Equalization 1.  To overcome operational problems caused by flowrate variations  To improve the performance of the downstream processes  To reduce.
Water Treatment Plant Austin and Alison.
Date: Monday, May 11 th 2015 Topic: Water Purification Objective: To recognize the stages of it.
© 2014 Evoqua Water Technologies LLC INTRODUCING THE CAPTIVATOR George Smith; Director of Biological Processes.
Chemical Engineering Department Government Engineering College Bhuj Prepared by: Kumar Satyam Guided By: Prof. Sejal J. Solanki Chemical.
Research on Tube Settlers and Flocculation
Investigation of affecting parameters on treating high-strength compost leachate in a hybrid EGSB and fixed-bed reactor followed by electrocoagulation–flotation.
Attached Growth Biological WW treatment Systems
Modified Ludzack-Ettinger Wastewater Plant
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
DAF System Air Supply Pressurizing Pump Retention Tank
High-Rate Clarifier / Thickener
Pre-Engineered Water Surface Water Treatment Plants
Experience Nordic Water WesTech / General Filter
Methods for Wastewater and Sludge Treatment
Water use and treatment
ENG421 (5c) – Water Treatment Plant Costs
Water Quality Vocabulary Oct 18, 2011
Presentation transcript:

Ochre Volume Minimisation Matt Dey or Ochre Concentration The School of Engineering

The Team Keith Williams Fred Pooley Liyuan Liang Devin Sapsford Chris Bullen Andrew Barnes

Active Treatment Industrial Partners

Neutralisation reactor Effluent Clarifier/Thickener Mixer/Aerator Neutralisation reagent Clean water Solids Standard chemical precipitation

Chemical precipitation

Neutralisation reactor Effluent Clarifier/Thickener Recirculated solids Neutralisation reagent Solids Floc reactor Flocculant reagent HDS

Bench tests

Different neutralisation reagents Ca(OH) 2

Different neutralisation reagents NaOH

Different neutralisation reagents Mg(OH) 2

Shear

Pilot Plant First stage reactor Second stage reactor Flocculation

Active Plant Horden

Passive Treatment Partners

Canal Worsley Delph & Bridgewater Canal Influent Pump Bed of sandEffluent

Results Flow rate (l/hr) IronRetention Time (Hrs) Approximate Operating Time * Total (mg/l)% Removed % 95% 94% hrs 96hrs 72hrs

Taff Merthyr IBC design Influent Effluent Bed of pea gravel

Results Feed rate (L/min) Average % removed Retention time (hrs) % % % % %1.4

EPSRC Funded Research Approximately 6 x 4m tank, 2m deep Up to 4l/s (14.4m 3 /hr) flowrate 3 years in the field operation Optimise ochre accretion/filtration Under drainage to aid in ochre thickening

Will it work? Palenna