PAS Project 1 Benchmarking of urban water and sanitation in emerging economies PERFORMANCE IMPROVEMENT PLANNING MODEL Introduction CEPT UNIVERSITY.

Slides:



Advertisements
Similar presentations
Good governance for water, sanitation and hygiene services
Advertisements

Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
FINANCIALLY SUSTAINABLE ASSET MANAGEMENT PLAN WITH A FOCUS ON IMPROVING SERVICE DELIVERY Performance Assessment Systems (PAS) Project 1 Session : OPTIMISING.
First Evaluation of Good Governance for Medicines Programme Brief Summary of Findings.
Feasibility Study Preparation Venelina Varbova. Session Overview  Purpose of the Feasibility Study  The Feasibility Study process according.
M&E Issues: RAFIP and REP Kaushik Barua Accra, 12 Dec
Action Logic Modelling Logic Models communicate a vision for an intervention as a solution to a public health nutrition (PHN) problem to:  funding agencies,
The Times 100 Business Case Studies
Workshop on Swachha Andhra Mission 2 nd May 2015 Swachha Andhra Corporaion 1.
The Urban Infrastructure Challenge in Canada: Focusing on Housing Affordability and Choice Presentation by CHBA – [Name] to The Municipal Council of [Name]
Local Government Development Program and Poverty Reduction in Uganda: Lessons from Aid Policies Shuaib Lwasa Department of Geography Makerere University.
Australia’s Experience in Utilising Performance Information in Budget and Management Processes Mathew Fox Assistant Secretary, Budget Coordination Branch.
STRATEGIC PLANNING – Preparing for the future Module 1 of the SWITCH Training kit.
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
Role and Components of Project Evaluation
Steve Paulone Facilitator Financial Management Decisions The financial manager is concerned with three primary categories of financial decisions:  1.Capital.
Project Planning and Capital Budgeting
PAS Project 1 Service Level Benchmarking Workshop on Sustainable and Disaster Resilient Urban Development 9 th September, 2014 PAS Project.
ZHRC/HTI Financial Management Training
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Lesson 3: Monitoring and Indicator Macerata, 23 nd October Alessandro Valenza, Director, t33 srl.
LOCAL GOVERNMENT INFRASTRUCTURE NEEDS vs DEVELOPMENT CHARGES.
HSA 171 CAR. 1436/ 7/4  The results of activities of an organization or investment over a given period of time.  Organizational Performance: ◦ A measure.
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
JASPERS in the Environment, Energy and Municipal Sectors Cost – Benefit Analysis Prague, 28 th November 2007.
1 Action Planning to Address Corruption in Water Supply and Sanitation (WSS) Dr. Donal O’Leary Senior Advisor, TI Secretariat.
Institutional Development for Improved Water Quality | November 2010 Operation and Maintenance for Safe Drinking Water – Institutional development to achieve.
ELECTRIFICATION FOR DEVELOPMENT C T Gaunt University of Cape Town.
The implemented reforms and progress on developing a strategy for the WSS sector in Armenia The implemented reforms and progress on developing a strategy.
Delivery of Basic Urban Services to the poor : City Government experiences A Presentation By MHT.
Finance strategies for environmental infrastructure Xavier Leflaive Paris, 23 February, 2007 EAP Task Force.
RiPPLE Theme 3 WSS, Livelihoods & Growth London November, 2007.
Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Workgroup: Delivering and Accounting for Development Results
P A L M E R D E V E L O P M E N T G R O U P P D GP D G City of Cape Town An Update of the Water Services Financial Model 26 October 2006.
Financing water and sanitation: Realistic strategies for developing and OECD countries Fifth World Water Forum, Istanbul, March 2009 James Winpenny Consultant.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
Sustainability Elements of the ARRA, and Getting the Most out of Stimulus Funding Jeannie Renne-Malone, LEED AP National Director – Climate Change & GHG.
PUNJAB MUNICIPAL SERVICES IMPROVEMENT PROJECT Financial Aspects Graeme Lee, SASEI.
From Monitoring Through Evaluation To Impact Assessment The case of NHDRs and vulnerable groups Andrey Ivanov Human Development Adviser, Bratislava RSC.
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
1 Local Government Budgets and Expenditure Review 2001/02 – 2007/08.
PERFORMANCE ASSESSMENT SYSTEM PROJECT SANIPLAN A CITY SANITATION PLANNING MODEL.
1 Malawi Public Expenditure Review: Road Sector 21 November 2007.
Performance Assessment System for water and sanitation services in India MEERA MEHTA PAS PROJECT, CEPT UNIVERSITY, INDIA.
In the Framework of: Financed by: Developed by: Business Planning for Water Associations Prepared by Water Supply and Sewerage Association of Albania SHUKALB.
PAS Project 1 Performance Measurement For water and sanitation- indicators CEPT UNIVERSITY.
2016 SWA Meeting of Ministers of Water, Sanitation and Hygiene: Technical Meeting Addis Ababa, Ethiopia, 17 March National accountability mechanisms in.
PAS Project 1 Benchmarking of urban water and sanitation in emerging economies Introduction CEPT UNIVERSITY.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
PAS Project, CEPT University PAS Project 1 Mainstreaming Citywide Sanitation Opportunities & Challenges in Excreta Management 4-5 th April, 2016 Prof.
PAS Project, CEPT University, Ahmedabad PAS Project 1 SaniPlan – IFSM Tools For Citywide Assessment and Planning.
PAS Project 1 Setting Up Performance Assessment System CEPT UNIVERSITY.
PAS Project, CEPT University, Ahmedabad
Evaluation What is evaluation?
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Presentation to the Health Portfolio Committee Presentation to Health Portfolio Committee Free State Department of Health 15 APRIL 2003.
Introduction and Overview
Under Sanitation Capacity Platform (SCBP)
Sewerage and Sanitation Policies in Indonesia
The Feasibility Study: something we already know
«Water Sector Reform in Kenya »
Feasibility Study Preparation Venelina Varbova
FRAMEWORK FOR BUSINESS ACTION ON WASH
Supporting Data for a KfW Financed Investment Project on the Montenegrin Coast 18 May 2017, Wien ●
Introduction and Overview
OECD and European Commission - Directorate General Environment
The Role of Local Government in implementing Biogas Projects Barry Coetzee, Head: Integrated Waste Management, Strategy & Policy Solid Waste Management.
Presentation transcript:

PAS Project 1 Benchmarking of urban water and sanitation in emerging economies PERFORMANCE IMPROVEMENT PLANNING MODEL Introduction CEPT UNIVERSITY

2 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad ‘PROJECT’ based approach Starting point is an assessment of funding resources available – SUPPLY DRIVEN Focus on developing INDIVIDUAL PROJECTS of various sectors Oriented towards achieving OUTPUTS ‘SERVICE’ based approach Oriented towards achieving OUTCOMES Focus on developing integrated SECTORAL SOLUTIONS Starting point is measurement of current performance and local priorities – NEED DRIVEN PAS Approach Conventional Approach Approach to Performance Improvement Planning

Multiple impacts: One action can affect many indicators Improving service levels related to Access and coverage by varied set of interventions, rather than just infrastructure creation … Efficiency of wastewater and septage collection system Extent of reuse/recycling of treated wastewater and septage Coverage of household level toilets in slums Coverage of household level toilets in city Household survey Provision of safe on-site sanitation system for unsanitary toilets Simplifying new connection procedure Policy for infrastructure provision in slums Regularise unauthorised sewerage connections Improve condition of existing community and public toilets Provide new individual toilet facilities Construct new community and public toilet blocks Multi-layered links between improvement actions and performance indicators, as against big singular project proposals … Multi-layered links between improvement actions and performance indicators, as against big singular project proposals … Coverage of households with adequate sanitation system Coverage of household level toilets in city Provision of safe on-site sanitation system for unsanitary toilets Focus on moving away from ‘infrastructure investment plans’ to evolving ‘service improvement plans’ which include wide set of actions for improving service delivery. Inter-sectoral linkages are also captured in PIP model … Impact of water augmentation on Per capita supply but also on wastewater generation, treatment capacity required, impact on finances

Integrated approach for FINANCIAL PLANNING 4 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad Financial implications of each Improvement action Capital expenditure Operating and maintenance expenditure Revenue generation Effect of inflation based on phasing Assess aggregate funding demand from all improvement actions Municipal finances of urban local bodies Past trends of municipal finances Forecasting for finances for Business as Usual scenario Assess financial health and extent of revenue surplus available External sources of funds Exploring funding pattern possible for each improvement action Internal sources of funds Exploring options to increase revenue from own income sources Aligning both these financial streams to evolve sustainable ‘Financing Plan’

IMPROVEMENT PLAN OPTIONS Performance Improvement Planning model 5 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad PIP Model starts with measurement of current performance levels. This is followed by identification and design of a set of actions to improve performance. Phasing and financial implications of these actions are assessed and a financing plan is developed. The Model enables comparison of various options in terms of their impacts on service levels and on ULB’s financial capacity to operate and maintain new infrastructure.

Steps in Performance Improvement Planning model 6 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad PIP Model is developed as an excel based spreadsheet to facilitate interactive usage. The structure of the Model has been aligned with PIP planning process. It has three distinct modules, each for a stage of PIP planning process. The chart alongside denotes each sheet of excel workbook and its flow of sequence. BASELINE INFORMATION FOR PERFORMANCE ASSESSMENT Water supply, wastewater and solid waste; Municipal finance past trends and future forecasts Excel sheet in PIP model : WSS info, Finance info, Municipal Finance Step 1.: ASSESS CITY PRIORITIES Review trends of key performance indicators and peer comparison Excel sheet in PIP model : Performance assessment Step 2. SELECT IMPROVEMENT ACTIONS Identify improvement actions to meet sector goals Excel sheet in PIP model : Performance assessment Step 3. DEVELOP IMPROVEMENT PLAN Design of actions in Improvement Plan – Phasing, quantity and costs Excel sheet in PIP model : WS Plan, WW Plan, SW Plan Step 4. REVIEW IMPROVEMENT PLAN Review impact on service performance Excel sheet in PIP model : Summary of Action Plan Step 5. MAKE FINANCIAL DECISIONS Sources of funds, Tariff structures & levels, Transfer surplus to WSS Excel sheet in PIP model : Action Plan finance, Financing Plan Step 6. REVIW FINANCING PLAN Review feasibility of Financing plan for CapEx and OpEx Excel sheet in PIP model : Financing Plan DATA ENTRY PERFORMANCE ASSESSMENT ACTION PLANNING FINANCIAL PLANNING

Data Entry and Forecasts for Performance assessment Capturing entire value chain of a sector ….

Snapshot of sector input sheet in PIP model 8 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad

Snapshot of municipal finance inputs 9 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad

Module I: Performance Assessment Assessment Through KPIs * GoI SLB indicators * Additional indicators for equity, onsite sanitation etc. Assessing Service Trends and Comparison * Compare with peers * Traffic light analysis * Service level trends Deciding Improvement Priorities * Local priorities * Consultation

Snapshot of performance assessment in PIP model Snapshot of performance assessment in PIP model - Identify city priorities 11 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad Local Action Indicators - indicated through graphs BASELINE INFORMATION ASSESS CITY PRIORITIES SELECT IMPROVEMENT ACTIONS DEVELOP IMPROVEMENT PLAN REVIEW IMPROVEMENT PLAN MAKE FINANCIAL DECISIONS REVIW FINANCING PLAN Key Performance Indicators - comparison against peer groups

Actions for Performance Improvement 12 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad Sector wide approach of PIP is supported by wide range of improvement actions that are categorized under four types of intervention areas. These range from no cost to low-cost solutions like process and policy interventions and rehabilitation of existing infrastructure rather than concentrating only on creation of new assets. BASELINE INFORMATION ASSESS CITY PRIORITIES SELECT IMPROVEMENT ACTIONS DEVELOP IMPROVEMENT PLAN REVIEW IMPROVEMENT PLAN MAKE FINANCIAL DECISIONS REVIW FINANCING PLAN

Snapshot of performance assessment in PIP model Snapshot of performance assessment in PIP model – Select improvement actions 13 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad

Module II: Action Planning Setting Improvement Vision * Sector vision (eg. ODF, slum free city, zero waste water discharge ) * Local level vision Selecting Improvement Actions * Type of actions * Identification of issues * Selection of actions Designing Improvement Actions * Time frame, costing & sequencing * Impacts of actions

Planning of improvement actions 15 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad Individual actions are calibrated as output based tangible targets. A set of these calibrated actions will form an implementation plan for ULB across ten years of plan period. Hence, this Action Plan must evolve through an iterative process of identifying appropriate actions, phasing and financing pattern. To facilitate action planning, all the actions are compiled in an easy to use tabular structure along with pictorial graphs to show its impact in terms of performance improvement and financial requirement. Components of action calibration box Snapshot of Action calibration box BASELINE INFORMATION ASSESS CITY PRIORITIES SELECT IMPROVEMENT ACTIONS DEVELOP IMPROVEMENT PLAN REVIEW IMPROVEMENT PLAN MAKE FINANCIAL DECISIONS REVIW FINANCING PLAN

Planning of improvement actions 16 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad Snapshot of graph showing impact of each activated action Snapshot of graph showing financial implication of activated actions BASELINE INFORMATION ASSESS CITY PRIORITIES SELECT IMPROVEMENT ACTIONS DEVELOP IMPROVEMENT PLAN REVIEW IMPROVEMENT PLAN MAKE FINANCIAL DECISIONS REVIW FINANCING PLAN Actions that are calibrated has cumulative impact on performance levels of a particular KPI. To represent this visually for easy interpretation, area graphs are prepared for each KPI/ theme. Impact of each action is represented through separate colours in each graph. Another set of graphs are prepared for each theme showing financial implications of calibrating all the actions under that theme.

Snapshot of entire structure for Action Planning 17 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad Tabular boxes for calibration of improvement actions Visual display of impact of activated actions on performance

Snapshot of time series analysis of performance in PIP model 18 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad BASELINE INFORMATION ASSESS CITY PRIORITIES SELECT IMPROVEMENT ACTIONS DEVELOP IMPROVEMENT PLAN REVIEW IMPROVEMENT PLAN MAKE FINANCIAL DECISIONS REVIW FINANCING PLAN

Module III: Financing Plan

Approach to Financial Planning 20 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad Financial planning essentially involves a balancing act between meeting funding requirement from external and internal ULB sources of funds. It also assesses sustainability of these sources in long run. BASELINE INFORMATION ASSESS CITY PRIORITIES SELECT IMPROVEMENT ACTIONS DEVELOP IMPROVEMENT PLAN REVIEW IMPROVEMENT PLAN MAKE FINANCIAL DECISIONS REVIW FINANCING PLAN

Financial implications of Action Plan 21 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad The financial implications of each activated action is reported in terms of capital expenditure required to implement the action, its operational and maintenance costs and additional revenue to be generated. Financial summary of all the activated actions together is evaluated year-on-year basis to assess funding requirement across plan period. Phasing of improvement actionsCapital expenditure requirementOperating requirement

External sources for financing improvement actions 22 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad To prepare feasible Financing Plan, various external sources of funds are explored to fund improvement actions. These are evaluated separately for each activated action. Grant – in – aidsExternal debtsPrivate participation (PPP)Beneficiary contribution

Snapshot of entire structure for Action Plan Finances in PIP model 23 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad

Preparation of Operating Plan 24 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad Financing Plan for water supply and sanitation is linked to overall municipal finance as most ULBs do not have a separate account. It results in transfer of revenue surplus from other sectors (Non-WSS) to WSS for revenue and capital expenditure as required. The investment requirement from PIP Action Plan is linked to funding sources calibrated in Action Plan finances. Sources of revenue to meet operating expenditure 1.Additional income generated by improvement actions 2.Revise tariff structure 3.Non-WSS revenue surplus transfer to WSS Snapshot of financial decisions to meet operating expenditure

Snapshot of setting tariff structures in PIP model 25 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad Revision in tariffs for revenue enhancement to meet funding requirement of capital expenditure, operating expenditure & debt servicing. Tabular boxes for setting of tariffs sector-wise Visual display of impact on revenues

Preparation of Capital Plan 26 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad 1.Review of funds determined in ‘Action plan finances’ – Grants, debt, private players, beneficiary contributions 2.Determine transfer of revenue surplus from WSS revenue account 3.Determine transfer of CapIn surplus from Non-WSS capital account 4.Determine additional debt requirement and terms & condition of debts Sources of revenue to meet capital expenditure Snapshot of financial decisions to meet capital expenditure

Snapshot of CapEx and OpEx plan summary in PIP model 27 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad Snapshot of Operating plan summary and tariff structures Snapshot of Capital plan summary and external sources of funds BASELINE INFORMATION ASSESS CITY PRIORITIES SELECT IMPROVEMENT ACTIONS DEVELOP IMPROVEMENT PLAN REVIEW IMPROVEMENT PLAN MAKE FINANCIAL DECISIONS REVIW FINANCING PLAN

Snapshot of Municipal finance summary in PIP model 28 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad Closing balance of WSS & overall municipal account shows surplus – Feasible financing plan BASELINE INFORMATION ASSESS CITY PRIORITIES SELECT IMPROVEMENT ACTIONS DEVELOP IMPROVEMENT PLAN REVIEW IMPROVEMENT PLAN MAKE FINANCIAL DECISIONS REVIW FINANCING PLAN

29 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad Snapshot of entire structure of Financing plan in PIP model

PIP Plan options

Preparation of PIP plan options for evaluation 31 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad Improvement Options Parameters for development of improvement options Business as UsualOption IOption IIOption III Criteria for assessment of improvement options Sector vision, type of actions, technology choices, costs Phasing of actions Financing sources Sector vision Service levels achieved Targets achieved Financing Grants availability Tariff revisions Feasibility Capacity Stakeholder consensus Each improvement option can comprise of  Discrete set of actions to achieve different performance level  Assess different technologies  Capture varying phasing of actions  Vary financing arrangements  Assess improving efficiency & low- no cost actions and capital asset projects Snapshot of PIP option comparison

Application of PIP model for a city - Comparison of PIP Options for a City 32 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad Three sanitation options were simulated for a city in PIP Model to assess its impact on services and finances: i)Conventional underground sewerage ii)Settled sewer system iii)On-site sanitation system The Model was simulated to provide similar outreach of services with all sanitation options, the financial impact of these options varied considerably. A sample result of these results are shown here. PIP options Capital FinancesOperating Finances Tariff increase required Base tariff = Rs.1465/HH/yr Sources of funds (Rs cr)Average/yr (Rs cr) Grants ULB funds PrivateTotal Capex Add. Opex Add. Revenue Internal funds Debt I) Business as Usual scenario with committed projects Rs II) Proposal with only Wastewater Technology Options A. Citywide Sewerage Rs B. Citywide Settled sewer Rs C. On-site sanitation system Rs Annual tariff increment required

end PIP Model is available at For more info write to us at

Extra slides for exercise

Actions for Improvementnsrformance Improvement Sector wide approach of PIP is supported by wide range of improvement actions that are categorized under four types of intervention areas. These range from no cost to low-cost solutions like process and policy interventions and rehabilitation of existing infrastructure rather than concentrating only on creation of new assets.

Action to improve sanitation

Actions for improvement water supply 37 Performance Assessment Systems (PAS) project, CEPT University, Ahmedabad