Presentation is loading. Please wait.

Presentation is loading. Please wait.

STRATEGIC PLANNING – Preparing for the future Module 1 of the SWITCH Training kit.

Similar presentations


Presentation on theme: "STRATEGIC PLANNING – Preparing for the future Module 1 of the SWITCH Training kit."— Presentation transcript:

1 STRATEGIC PLANNING – Preparing for the future Module 1 of the SWITCH Training kit

2 Project outline, Management and Organisation Page 2 The SWITCH Training Kit STRATEGIC PLANNING – Preparing for the future www.switchtraining.eu

3 Project outline, Management and Organisation Page 3 Contents Chapter 1 – Why there is a need for change Chapter 2 – Water in the city Chapter 3 – Sustainable water management and IUWM Chapter 4 – Strategic planning for IUWM STRATEGIC PLANNING – Preparing for the future www.switchtraining.eu

4 Project outline, Management and Organisation Page 4 Chapter 1 – Why there is a need for change STRATEGIC PLANNING – Preparing for the future Chapter 1 – Why there is a need for change www.switchtraining.eu

5 Project outline, Management and Organisation Page 5 The importance of good urban water management STRATEGIC PLANNING – Preparing for the future Chapter 1 – Why there is a need for change Water and urban quality of life: Public health Security Economy Environment www.switchtraining.eu

6 Project outline, Management and Organisation Page 6 Developments challenging water management in cities in the future STRATEGIC PLANNING – Preparing for the future Chapter 1 – Why there is a need for change www.switchtraining.eu

7 Project outline, Management and Organisation Page 7 Conventional approaches to urban water management STRATEGIC PLANNING – Preparing for the future Chapter 1 – Why there is a need for change Stormwater collection and disposal using concrete channels and pipes Centralised wastewater collection and treatment Increased water demand is met through new supplies Standard engineering solutions are applied Different sectors of the water cycle are managed separately www.switchtraining.eu

8 Project outline, Management and Organisation Page 8 Drawbacks of the conventional approach to urban water management STRATEGIC PLANNING – Preparing for the future Chapter 1 – Why there is a need for change Fragmentation Short-term solutions Lack of flexibility Energy intensive Image: Barbara Anton www.switchtraining.eu

9 Project outline, Management and Organisation Page 9 Chapter 2 – Water in the city STRATEGIC PLANNING – Preparing for the future Chapter 2 – Water in the city www.switchtraining.eu

10 Project outline, Management and Organisation Page 10 Links within the water cycle STRATEGIC PLANNING – Preparing for the future Chapter 2 – Water in the city www.switchtraining.eu

11 Project outline, Management and Organisation Page 11 Links between water and other sectors of urban planning STRATEGIC PLANNING – Preparing for the future Chapter 2 – Water in the city www.switchtraining.eu

12 Social equity Human health Green space and urban biodiversity Safety Good urban design Project outline, Management and Organisation Page 12 Links between water and quality of life STRATEGIC PLANNING – Preparing for the future Chapter 2 – Water in the city www.switchtraining.eu

13 Project outline, Management and Organisation Page 13 Chapter 3 – Sustainable water management and IUWM STRATEGIC PLANNING – Preparing for the future Chapter 3 – Sustainable water management and IUWM Image: iStockphoto.com/neoellis www.switchtraining.eu

14 Project outline, Management and Organisation Page 14 Conventional versus integrated approach to urban water management STRATEGIC PLANNING – Preparing for the future Chapter 3 – Sustainable water management and IUWM www.switchtraining.eu Aspect of urban water management Conventional approachIntegrated approach Overall approachIntegration is by accidentPhysical and institutional integration is by design Collaboration with stakeholdersCollaboration = public relationsCollaboration = engagement Choice of infrastructureInfrastructure is made of concrete, metal or plastic Infrastructure can also be green Management of stormwaterStormwater is a constraintStormwater is a resource Management of human wasteHuman waste is collected, treated and disposed of Human waste is a resource Management of water demandinvestment in new supply sources and infrastructure Other options are given priority over developing new resources Choice of technological solutionsComplexity is neglected and standard engineering solutions are employed Diverse solutions and new management strategies

15 Project outline, Management and Organisation Page 15 Integrated approaches to urban water management Stormwater is attenuated and retained using natural systems Wastewater is separated at source and reused Reducing water demand is given priority over increasing supply Innovative solutions are encouraged Physical and institutional integration in the management of the water cycle (Based on Mitchell, 2004) STRATEGIC PLANNING – Preparing for the future Chapter 3 – Sustainable water management and IUWM www.switchtraining.eu

16 Project outline, Management and Organisation Page 16 Integrated Urban Water Management (IUWM) IUWM requires the consideration of: All parts of the water cycle as an integrated system The need to strive for sustainability All water users and other relevant stakeholders All water uses All local specificities (Based on Mitchell, 2004) STRATEGIC PLANNING – Preparing for the future Chapter 3 – Sustainable water management and IUWM www.switchtraining.eu

17 Project outline, Management and Organisation Page 17 Benefits of IUWM Increased water availability Reduced cost of water treatment Increased biodiversity Identification of more cost effective and viable solutions STRATEGIC PLANNING – Preparing for the future Chapter 3 – Sustainable water management and IUWM www.switchtraining.eu

18 Project outline, Management and Organisation Page 18 Why IUWM is more sustainable STRATEGIC PLANNING – Preparing for the future Chapter 3 – Sustainable water management and IUWM www.switchtraining.eu

19 Project outline, Management and Organisation Page 19 Moving towards integration (1) Communication, coordination & collaboration across institutional boundaries Cross-disciplinary interaction Multi-stakeholder involvement Experimenting – learning – sharing Regular review and adjustment Importance of joint vision STRATEGIC PLANNING – Preparing for the future Chapter 3 – Sustainable water management and IUWM www.switchtraining.eu

20 Project outline, Management and Organisation Page 20 Moving towards integration (2) STRATEGIC PLANNING – Preparing for the future Chapter 3 – Sustainable water management and IUWM www.switchtraining.eu

21 Project outline, Management and Organisation Page 21 Chapter 4 – Strategic planning for IUWM STRATEGIC PLANNING – Preparing for the future Chapter 4 – Strategic planning for IUWM www.switchtraining.eu

22 Project outline, Management and Organisation Page 22 Enabling factors STRATEGIC PLANNING – Preparing for the future Chapter 4 – Strategic planning for IUWM Stakeholder involvement Internal coordination in administration The role of local politics www.switchtraining.eu

23 Project outline, Management and Organisation Page 23 Phases of strategic planning – Baseline assessment Examples of data collected: Local water resources: Where do water resources for the city come from and in which quantity and quality? Local water use and demand trends: What is the balance between supply and demand and what are the characteristics and dominant components of water consumption? … STRATEGIC PLANNING – Preparing for the future Chapter 4 – Strategic planning for IUWM www.switchtraining.eu

24 Project outline, Management and Organisation Page 24 Phases of strategic planning – Creating a vision STRATEGIC PLANNING – Preparing for the future Chapter 4 – Strategic planning for IUWM www.switchtraining.eu

25 Project outline, Management and Organisation Page 25 Phases of strategic planning – Setting objectives STRATEGIC PLANNING – Preparing for the future Chapter 4 – Strategic planning for IUWM www.switchtraining.eu

26 Project outline, Management and Organisation Page 26 Phases of strategic planning – Indicators and targets (1) STRATEGIC PLANNING – Preparing for the future Chapter 4 – Strategic planning for IUWM www.switchtraining.eu

27 Project outline, Management and Organisation Page 27 Phases of strategic planning – Indicators (2) STRATEGIC PLANNING – Preparing for the future Chapter 4 – Strategic planning for IUWM

28 Project outline, Management and Organisation Page 28 Phases of strategic planning – Scenario building STRATEGIC PLANNING – Preparing for the future Chapter 4 – Strategic planning for IUWM www.switchtraining.eu

29 Project outline, Management and Organisation Page 29 Phases of strategic planning – Strategy development STRATEGIC PLANNING – Preparing for the future Chapter 4 – Strategic planning for IUWM www.switchtraining.eu

30 Project outline, Management and Organisation Page 30 Phases of strategic planning – Development of an action plan STRATEGIC PLANNING – Preparing for the future Chapter 4 – Strategic planning for IUWM Image: Ralph Philip www.switchtraining.eu

31 Project outline, Management and Organisation Page 31 Phases of strategic planning – Implementation of an action plan STRATEGIC PLANNING – Preparing for the future Chapter 4 – Strategic planning for IUWM Image: Barbara Anton www.switchtraining.eu

32 Project outline, Management and Organisation Page 32 Phases of strategic planning – Monitoring and evaluation STRATEGIC PLANNING – Preparing for the future Chapter 4 – Strategic planning for IUWM www.switchtraining.eu

33 Slides produced by: ICLEI European Secretariat © 2011 ICLEI European Secretariat GmbH, Leopoldring 3, 79098 Freiburg, Germany The contents of the SWITCH Training Desk website are under a license of Creative Commons specified as Attribution- Noncommercial-Share Alike 3.0. This license allows others to remix, tweak, and build upon the training materials for non- commercial purposes, as long as they credit the copyright holder and license their new creations under the identical terms. http://creativecommons.org/licenses/by-nc-sa/3.0/ The full legal text concerning the terms of use of this license can be found at http://creativecommons.org/licenses/by-nc- sa/3.0/legalcode www.switchtraining.eu


Download ppt "STRATEGIC PLANNING – Preparing for the future Module 1 of the SWITCH Training kit."

Similar presentations


Ads by Google