4/22/20131BEAST MEETING Draft Specifications of Micro-TPC System red: to be determined/checked who will provide it, install it, operate it: U. Hawaii group;

Slides:



Advertisements
Similar presentations
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
Advertisements

EML 2023 – Motor Control Lecture 4 – DAQ and Motor Controller.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Recent Progress on D3 - The Directional Dark Matter Detector
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
Large Cell Scope Pictures, Part II HV Gnd 1nF Large Cell Tube Anode signal Phi Cathode signal scope S1 S2 S1 S2 This is a follow-up on Richard’s measurement.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
Large Cell Scope Pictures HV Gnd 1nF Large Cell Tube Anode signal Cathode signal scope S1 S2 S1 S2 The following scope pictures were all taken with the.
GERDA collaborationmeeting, Ringberg castle Béla MajorovitsTG5 Review: Infrastructure on top of the tank1.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
ELMB miscellanea Dr Zhige (Gary) Zhang. ELMB miscellanea 1)Over voltage protection for analog input 2)Hardware resetting 3)Allocation for RICH2 4)Configuration.
Tray Factory Considerations Jean-Francois Genat UC LAPD Collaboration Meeting, June th 2010, Argonne. 1.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
MicroTPCs in SuperBEAST Belle2 Inter Detector Meeting Sep Sven E. Vahsen University of Hawaii Belle2 IDM, Sep 1 '11Sven Vahsen, University of Hawaii1.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Doug, here are some slides. FGT Electrical Integration ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 2 mA ARC module (APV Readout.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Summary of the Electrical Feedthroughs. 2 SFT Channels for the 3x1x1 m 3 N. 6 cold + N. 6 warm on a D=222mm flange (each with 20x68pin connectors)
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Status 29/09/15. Trigger system: - Scintillator system : scintillator+pmt, discriminator+ coincidence module -TLU module + PC + USB cable Detectors :
CALICE Si-W ECAL (& ILD) power pulsing (cabling) C.Clerc LLR, Ecole polytechnique, Palaiseau R. Cornat P.Mora de Freitas G.Musat J.-F. Roig.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
Beam Halo Monitor : Q-bars+SiPMMike Albrow, 26 Aug 2010 A Beam Halo Monitor for the LHC based on Quartz Cherenkov Counters Mike Albrow (Fermilab) Features:
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Page 1 Sapphire by pass line  Design Concept of Cooling Water System : Funnel 10 line Tank 2 10 tones Chiller -20cm tilt - 5cm distance between growers.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
P. Colas, Endplates 1 LP phone meeting, May 9, 2006 Large Prototype Endplate(s)
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Concept Design for LBNF Far detector (LAr single phase)
Installation of the T600 at Fermilab CSN2, September 22,
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
D 3 - Directional Dark Matter Detector Sven Vahsen (U. Hawaii)1 Berkeley Lab Hawaii LBNL Hawaii Investigating feasibility of directional DM search w/ micro-pattern.
4/22/20131BEAST MEETING Reminder of BEAST TDR schedule (expected deliverables in red) April 19 th: – Draft specifications for each beast subsystem We need.
Status of TRIUMF Prototype Studies Christopher Hearty University of British Columbia/IPP May 31, 2010.
WBS 1.05 Commissioning Detectors Specifications & Design Sven Vahsen University of Hawaii.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
WA105 General meeting CERN – 21 January 2015 Feedthroughs for the 3x1x1m 3 Franco Sergiampietri ETH Eidgenössische Technische Hochschule Zürich Swiss Federal.
BMBF-JINR PANDA Meeting, Dubna, November 15, 2013 G.Alexeev (for muon group) Status of Project and Related Topics * Report to the Muon Review Panel ( CERN,
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Installation of the T600 at Fermilab Fermilab, February 15,
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
3/9/20131BEAST KEK CAD style figures needed For NIM paper: 1.Dcube-micro sideview (Marc) 1. for BEAST.
BEAST micro-TPC Prototype Construction In charge: Igal / Sven now  later Peter / Igal / Sven Main grad students: Michael & Ilsoo Gas supply, measurement,
WBS 1.05 Commissioning Detector Specifications & Design
Installation of the T600 at Fermilab
ETD PID meeting We had many presentations dedicated to the PM test .
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Markus Friedl (HEPHY Vienna)
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Structure and etc Shoji Uno (KEK) at B2GM
PMT cabling Gian Luca Raselli INFN Pavia
Vertex Detector Mechanical R&D Design Questions and Issues
Power pulsing of AFTER in magnetic field
Variable distance from beam.
Presentation transcript:

4/22/20131BEAST MEETING Draft Specifications of Micro-TPC System red: to be determined/checked who will provide it, install it, operate it: U. Hawaii group; Vahsen, Jaegle (postdoc), Hedges (grad student), Seong (grad student), Rosen (engineer), X (postdoc) expected physics measurements: fast- neutron flux, angular distribution if achievable during T2 – goals discriminate different beam backgrounds so that we can predict neutron flux at higher luminosity verify / tune normalization and angular distribution of neutron flux in simulation space requirements and location in T0,T1,T2 – Approx. dimensions of each TPC: 5"x4"x30cm – 2 TPCs during T0 (1 forward, 1 backward) – 8 TPCs during T1, T2 – Locations of center of TPCs: backward: r=32 cm, z=-122cm Forward: r=37cm, z=199 cm Four phi positions: 0,90,180,270 degrees 30 cm 6“ 4“

BEAST TPC Prototype System [planned] He/CO 2 Flow gauge Pressure gauge manual valve Regulators (x2) exhaust Pump flow rate: cc/minute GND+4x5kV <=50 pins LV p=1.0 atm NIM CRATE HVHV LVLV PHAUHV gnd+1x20kV LV (4 pins) + PHA (2pins) + DAQ USB / SEABAS CPU USB

4/22/20133BEAST MEETING BEAST TPC endplates red: to be determined/checked DAQ: Input/output signals per TPC – Digital I/O of 4FE-I4 chips (trigger,LVDS in/out, combined ground)  21 per channels per TPC – Analog signal from copper anode: 1 coax per TPC Services – LV: ~2V, analog, digital  4 wires if common power (parallel or serial), 16 wires if individual) – HV: 5kv: 4 CH + GND, 30 kv (field cage): 3 CH + GND – Gas in/out – Cooling: not required – whether you can take care of them all, or need KEK to provide: will/may ask KEK to provide gas Service connections – 32-pin or 50-pin mil spec LV connection on KF40 feedthough – 8 HV on KF40 feedthrough (up to 2 SHV) – 3 swage lock (gas in/out, overpressure) – 1 KF 40 pump port for quick purge Cable thicknesses, pipe diameters – Gas: ¼” stainless steel tubing – Cables: tbd max distance from sensors to closest part of DAQ system / electronics, so that we can reserve space. Location of DAQ. – ~20m (need to check if OK for LVDS and analog readout) 6” 4” 2.08” HV (<=8 pins) LV+DAQ (<=50 pins) KF40 to vacuum pump Pressure relief gas in gas out