Strana 1 Evaluation of Pilot Projects (CZE) 2nd Dissemination Conference - Halle, 19th March 2014 SCHP ČR + Partners of the project.

Slides:



Advertisements
Similar presentations
MENTORE: PILOT 2 – Tracking & Tracing Services for Livestock Transport Management MENTORE Event, 25 th November 2008 Galileo & EGNOS for Public Interest.
Advertisements

The gas crisis of January 2009: Lessons learnt for energy security of Slovakia and the EU Date: Author: Dr.Hans-Gilbert Meyer Member of the.
ProAssist ® complex assistance services management system Global Assistance & INGENIUM Praha.
Waste Monitoring and Reporting Lubomir Nondek DHV CR, Prague Czech Republic.
A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission WP 1: Specification and evaluation.
1 Joint Assistance to Support Projects In European Regions (JASPERS) Axel Hörhager Head of Vienna Regional Office Ministry for Regional Development Czech.
Streamlining rail operations with RFID Jarkko Miettinen Vice President of Sales, Confidex Radio frequency identification in rail operations.
Company confidential Prepared by HERE Transit Sr. Product Manager, HERE Transit Product Overview David Volpe.
SOX and IT Audit Programs John R. Robles Thursday, May 31, Tel:
A Decision Support System For Civil Protection Prof. Thanasis Ziliaskopoulos University of Thessaly Hellenic Institute of Transport International Conference.
Monika Schönerklee-Grasser JTS CENTRAL EUROPE PROGRAMME The CENTRAL EUROPE Programme Staccato is a project of the concerto initiative co-funded.
RESPONSIBLE CARE ® DISTRIBUTION CODE Daniel Roczniak Senior Director, Responsible Care American Chemistry Council June 2010.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
ASPEC Internal Auditor Training Version
YOUR FLEET TRACK IN REAL TIME With ADVANCED GPS TRACKING The information contained in this document is highly confidential and privileged. This document.
NOTIONAL – FOR DISCUSSION PURPOSES ONLY Version 2.2 Hank Suderman Collection Highway and Motor Carrier Truck and Hazmat Shipment Tracking Presented by.
ITC HOLDING s.r.o. Brussels, 24 November 2010 The Eurostars Programme Experience with preparation of Eurostars projects ITC HOLDING s.r.o. 1.
DRIVEN Aim of EU Project on Harmonisation of Instructor Professional Skills (TOT to FCO) Zagreb, 9 December 2011 (c) IRU Academy 2011.
Practical IS security design in accordance with Common Criteria Security and Protection of Information 2005 František VOSEJPKA S.ICZ a.s. June 5, 2005.
Lightweight Mobile Applications Certification: Prepared By: Rahul Biswas.
BTA Online system Financial portal for business customers.
Guidelines for the administration of axis 4 LEADER 17th July 2014, Nitra Mgr. Veronika Korčeková, MA Ministry of Agriculture and Rural Development of the.
Presentation WG 2 Managing EU Funds on the Regional Level Republic of Albania Ministry of European Integration (MEI) Regional Conference EU Perspectives.
Data user perspective: Transport data for policy assessment Svend Tøfting – Aalborg University North Denmark Region ITS Denmark.
2011 NPMA Conference Series III National Capital Area Conference Leaders in Asset Management National Capitol Area Conference Charles L. Robinson, Director.
The work of the expert group Peter Stuurman chairman ad interim Saturday, 09 April 2011.
BTA Online system 2012 y. Financial portal for business customers.
WANDA - project overview and status Dr. Harald Beutl via donau – Österreichische Wasserstraßen-Gesellschaft mbH Budapest, Projektstatus “WANDA”
INTERNATIONAL EDUCATIONAL CONFERENCE „LET‘S SAVE LIVES“ Tallinn, Estonia, March 15 th, 2011 Martina Pavlíková ŽSR – The Railways of the Slovak Republic.
Life cycle services for automation products
Sergey Tzarnakliyski Belgrade, December 4, 2013 Danube Commission, Budapest Selected Activities of the Danube Commission Steps towards sustainable Mobility.
NON-COMPULSORY BRIEFING SESSION REQUEST FOR INFORMATION: ICT SECURITY SOLUTIONS RAF /2015/00019 Date: 29 September 2015 Time: 10:00.
IAEA School of Drafting Regulations Transportation regulations in Republic of Latvia Radiation Safety Centre (RSC) Marcis Slavinskis Vienna, 3-14 November.
Brief Overview: Options for Licence & Support Open Source Job Scheduler Software- und Organisations-Service GmbH 
IAEA 1 - Issuing regulations a, b The regulators of transport in Republic of Belarus are Department of supervision for the safe industrial activities and.
IT 606 Computer Networks (CN). 1.Evolution of Computer Networks & Application Layer. 2.Transport Layer & Network Layer. 3.Routing & Data link Layer. 4.Physical.
Third BERCEN Plenary Meeting December , Brussels Belgium The key achievements in environmental enforcement and compliance REPUBLIC OF SERBIA.
Bureau for International Research and Technology Cooperation Herlitschka 1 Warsaw FP6 Launch Conference - 26 Nov Small and Medium Enterprises -
Materials Flows Lay Out in Production Logistics
1 Basics Intermodal Global Door-to-door Container Supply Chain Visibility Funded by the European Commission, DG Research Duration: 06/2008 – 05/2011 6/9/2016.
Differences between customs brokers and customs carriers Differences between customs brokers and customs carriers Baku, April 8, 2016 TAIEX Workshop on.
Seite 1 Thematic Activities WP 4 and WP 5 Working Group Meeting, Halle 18 March 2014.
Page 1 Ing. Alena Loudová DEKRA CZ a.s. + Partners of the project 2nd Dissemination Conference - Halle, 19th March 2014 Evaluation of Pilot Projects (CZE)
Multi Modal Containerized transport through Western India – A Supply Chain Perspective Presented By: Kumar Abhishek Rahul Rathi Tusar Pal.
CZECH STATISTICAL OFFICE | Na padesátém 81, Prague 10 | czso.cz1 Prague, May 28, 2013 FOREIGN TRADE IN NATIONAL ACCOUNTS AND BALANCE OF PAYMENT.
Strana 1 Working Group Meeting Maribor, 3th December 2013 Preparation and Implementation of Pilot Projects (CZE) SCHP ČR – Ústí Region – ZCHFP SR DEKRA.
COBIT. The Control Objectives for Information and related Technology (COBIT) A set of best practices (framework) for information technology (IT) management.
Track and Trace Systems Track and trace systems is a comprehensive solution for the pharmaceutical industries in protection against counterfeit, ensures.
František Nonnemann Skopje, 10th October 2012 JHA Data protection and re-use of PSI as a tool for public control–CZ approach.
Péter Bakonyi PAC Assisstant. Content 27/03/2014Budapest, 7th SG Meeting Action 1 Action 2 Action 3 Action 5 Action 6 Action 7 Action8.
Verizon Intelligent Track and Trace: Serialization and Cold Chain
Chapter 8. Electrical Systems
NON-COMPULSORY BRIEFING SESSION REQUEST FOR INFORMATION: ICT SECURITY SOLUTIONS RAF /2015/00019 Date: 29 September 2015 Time: 10:00.
School of Drafting Regulations Transportation regulations in
An Introduction to Attendance on Demand
Transboundary movement of used batteries of used lead batteries, in draft Guidelines for environmentally sound management of used lead batteries Jaromír.
The advantages of going wireless
System Plus.
Tomáš Urych, ESO9 international a.s.
Update on the MIS risk assessment notes
INSPIRE-based e-reporting pilots
ALL-ELECTRIC TEMPERATURE CONTROL FOR CHILLED, FROZEN AND
General Data Protection regulation (GDPR)
Working Group on Rail Transport Statistics:
Presentation of the Company
How can DTM Multi-Sectoral Location Assessment be useful for Partners?
ITF-UNECE-UIC workshop on rail security DB.
USE OF ELECTRONIC DATA COLLECTION TECHNOLOGIES: MAIN DRIVERS AND
How can DTM Multi-Sectoral Location Assessment be useful for
Presentation transcript:

Strana 1 Evaluation of Pilot Projects (CZE) 2nd Dissemination Conference - Halle, 19th March 2014 SCHP ČR + Partners of the project

Pilot Project ImplementationPage 2 Main objectives I.State/EU contract – service Information for IRS in case of an accident Online information about the movement in the monitored territory (Ústí Region) Information about the movement in the individual countries (statistics, determination of routes, IRS complexity and facilities, normative activities of the EU and individual countries) II.Commercial sector only tangentially – possibility of extending the chosen information for other subjects Facultative offers specified according to the subject of activity and provided to a subject in the transport chain

Pilot Project ImplementationPage 3 Analysis of container tracking up to now 1.Container movement is not tracked comprehensively 2.Movement is tracked independently by individual subjects of the transport chain Existing information of carriers: road – Position of individual vehicles/chassis with a container – E-call from 2018 railway –Position of entire shuttle trains –Position of individual wagon shipments waterway (position of entire ships)

Pilot Project ImplementationPage 4 OBU Selection made from existing national manufacturers of the units which approximated to the required project criteria: CR – LEVEL SR – NAM The unit suppliers are interested in further development of the unit according to the assignment of the T&T project results

Pilot Project ImplementationPage 5 Pilot tracing

Pilot Project ImplementationPage 6 Beginning: 30th October 2013 Finish: 19th November 2013 Capacity of battery: 86 % Interval: 8 minutes Germany, Duisburg – Czech Republic – Slovakia – Ukrajine, Kalush (road and railway transport) Trace 1

Pilot Project ImplementationPage 7 Beginning: 22th November 2013 Finish: 14th January 2014 Capacity of battery: 56 % Interval: 8 x 3 minutes Germany, Duisburg – Czech Republic – Slovakia (river and railway transport) Trace 2

Pilot Project ImplementationPage 8 Beginning: 2nd February 2014 Finish: 22th February 2014 Capacity of battery: 22 % Interval: 3 minutes x 90 seconds Belgium, Antverp - Germany, Duisburg – Czech Republic – Slovakia – Hungary (Budapest) (road and railway transport) Trace 3

Pilot Project ImplementationPage 9 The project has proved Signal availability – trouble-free  D  CZ  SK  UA  D  CZ via the Elbe  SK  B  D  CZ  SK  HU  We are able to trace movement of individual containers 3 different transport modes – different conditions for tracing:  E.g. frequency (interval) of reporting  Possibility of covering the device (e.g. a tunnel)  Sensitivity of the OBU settings etc.

Pilot Project ImplementationPage 10 The project has proved Accident: We are unable to define what an accident is! There are no standards for containers, only for individual modes of transport There is no OBU certification according to individual criteria (standard) Necessity of preventing error messages as much as possible

Pilot Project ImplementationPage 11 OBU parameters - findings Battery – usable time, recharging capability (automatic monitoring of the battery condition) Remote adjustment of parameters – switching between individual modes of transport and required geofencing (sensitivity to an accident) Geofencing – the issue of accuracy of the transition moment point Unit casing – thoroughly secured against theft and unauthorized handling Clear and internationally understandable marking – unit designated only for tracking of containers

Pilot Project ImplementationPage 12 Ownership of the OBU, handling and placement Ownership – system solution on a transnational level Marking – container number as the basic identification feature Handling the units – placement on the container and maintenance – system solution on a transnational level

Pilot Project ImplementationPage 13 Ownership of the OBU, handling and placement Standardization of placement on individual types of containers:  As far as possible from the filling chute and outlet of tank containers  Greatest risk during filling and draining – OBU placement must comply with the legislation and standards for loading/filling and unloading/draining of individual products  Shielding - possibility, technology

Pilot Project ImplementationPage 14 OBU information system Specific for each OBU unit manufacturer Technology platform, fully ensuring the information flows with the OBU unit Automatic process of the unit tracking Automatic changes in the unit settings according to predetermined parameters in IS Makes it possible to transfer chosen data/data files to IS “T&T“

Pilot Project ImplementationPage 15 T&T information system Clearly defined range of data –Collected from subjects involved –Provided to a precisely defined circle of subject involved –Priority of data protection (allowed accesses, incl. commercial) Definition of a data transfer interface

Pilot Project ImplementationPage 16 Conclusions 1.We are able to track containers – interest on the part of OBU manufacturers 2.Accident definition/settings 3.We are not able to ensure the overview of the movement of containers carrying chemicals in the individual countries and regions in a different way 4.Marking and unified placement of OBU 5.Purchase, installation and maintenance of OBU 6.Range of data for IS T&T 7.Definition of an interface for data transfer Specific and detailed conclusions of the pilot project have been described in the regular monitoring reports (6 by now) and they will be presented in further presentations prepared for pilot project no. 4.

Pilot Project ImplementationPage 17 Thank you Association of Chemical Industry CZ Dělnická Praha 7 Phone: