Muon Department Meeting Jerry Annala Staged Commissioning of Muon Campus 17 December 2015.

Slides:



Advertisements
Similar presentations
Muon Campus Beam Transport January 23, 2013 J. Morgan 1.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Eric Prebys Representing the “Mu2e Task Force”: Steve Werkema Jim Morgan Vladimir Nagaslaev Chuck Ankenbrandt Vladimir Shiltsev Ioanis Kourbanis *Mu2e-doc-1911.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
Muon Campus Controls Update Brian Drendel 8/6/13.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Fermilab 1 AP Dept. Activities Report September 20, 2006Dixon Bogert AP Dept. - Activities Report Dixon Bogert - AP Dept. Meeting September 20 th, 2006.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
Storage Rings Group Meeting Steve Werkema 24 March 2010.
Delivery Ring AIP Jerry Annala Dec 12, µ Scope Beam line aperture improvements Beam line aperture improvements Beam line power supply upgrades Beam.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Mu2e WBS 2 Accelerator Progress Report Mu2e WGM 6/15/2011 Steve Werkema L2 Manager for the Accelerator Systems.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Extraction from the Delivery Ring November 19, 2013 J. Morgan.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
TLM example application T. Leveling March 15, 2013 Attendees: Don Cossairt Kamran Vaziri Adam Olson Dave Peterson John Anderson Paul Czarapata Tony Leveling.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
What we have now – the Pbar source 1 1/23/2013 J. Morgan.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
Brian Drendel September 11, Funding and Deadlines Muon Campus Controls  Controls plan for existing buildings  Controls plan for new buildings.
Mu2e Accelerator Independent Design Reviews (IDRs) Steve Werkema Muon Department Meeting 17 December 2015.
Brian Drendel May 21, Stacking Pbars stacked: E10 Time stacking: Hr Average stacking rate: E10/Hr Uptime Number of pulses.
09:00 Meeting Shutdown Update June 29 th 2015 Cons Gattuso AD Shutdown Manager.
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
Antiproton Acceptance Steve Werkema February 8, 2005.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
Muon Long Term Schedule August 15, µ Points to discuss What is the schedule What is the schedule Shutdown schedules Shutdown schedules How do we.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Brian Drendel October 31, This talk  Beams-doc private/DocDB/ShowDocument?docid=4474https://beamdocs.fnal.gov/AD-
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
P1, P2 and AP-1 Aperture Improvements February 5, 2015 J. Morgan 1.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Beam Transport and Storage Rings Design Review November 17, 2010 J. Morgan.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
MICE Operations Scenario Run 1
News and brief overview of Beamline plans for the next few months
J. Seeman Assistant Director for PPA/LCLS
LCLS Personnel Protection System and Beam Containment System
ThomX – Commissioning Meeting – 25/01/2018
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Review of hardware commissioning
Presentation transcript:

Muon Department Meeting Jerry Annala Staged Commissioning of Muon Campus 17 December 2015

Announcements Late welcome Diktys Stratakis Muon Campus lunch next Tuesday in Penthouse Since we did not plan a holiday lunch for our department, I suggest going to lunch tomorrow Beneficial occupancy of new tunnel (what it means) Mu2e technical review update Other updates Cable mitigation update This week’s FTL due right after this meeting 12/17/2015Jerry Annala | Muon Department meeting2

Electrostatic septa drawing 12/17/2015Jerry Annala | Muon Department meeting3

Pretarget/Prevault 99% done Transport 95% done Accumulator 85% to 90% done in the tunnel. Still need to pull cables up through the penetrations Mostly load cable left Debuncher 60% to 70% done? This is a moving target as we identify more systems that can be removed. BPM test signal cables? Loss monitor HV cables? Been concentrating on the 50 straight section recently Cable Mitigation update

Enclosure diagram 12/17/2015Jerry Annala | Muon Department meeting5 Tony has created a new diagram depicting beam scenarios Gates installed for this shutdown will likely become permanent

Modification of Transport enclosure Boundaries of the transport enclosure will be about where they always were in Collider operation. There will be a short section that is interlocked and tied to the MI-8 radiation permit. This will allow us to access transport (outside of new gates) to troubleshoot without turning off the Neutrino program. This will force us to: –Cut down the number of available transport keys. –Take two keys with us to go throughout the transport enclosure –Do extra work to search and secure enclosure if MI-8 line is up –Consider a coasting beam valve in RR –Etc. 12/17/2015Jerry Annala | Muon Department meeting6

Commissioning Plan Jim Morgan has presented a fairly comprehensive plan in the October 2014 beam line review Complete presentation in g-2 docDB #2215 This plan made assumptions about parts of the accelerator chain being ready and then an ideal schedule was presented. If the entire complex became ready at the same time, we could follow Jim’s plan exactly. 12/17/2015Jerry Annala | Muon Department meeting7

Advertised commissioning activities with durations 12/17/2015Jerry Annala | Muon Department meeting8 ActivityDuration (weeks) Beam Power (watts) Recycler has been commissioned Commission RR extraction and P1 stub ?10 Commission P1-P2 line at 8 GeV.510 Commission M1 line to AP0 target 110 Commission M3 line bypass to DR 210 Commission DR at 8 GeV 410 Extract 8 GeV protons into upstream M4 line 210 Begin Commissioning with 3.1 GeV secondary beam Commission M2/M3 line 3170 Pass 3.1 GeV through to M4/M5 line 3170 Circulate in DR and tune up 3170 Tune up machine toward full intensity 4170

Staged Commissioning Plan What limits us from turning running beam part way through the campus early? –Construction in enclosures including downstream enclosures –Systems not ready for operation: Power Supplies Instrumentation Infrastructure (Power, Water, Safety system, etc.) Controls –Cable mitigation –Administrative details: Shielding assessments Operational readiness reviews LOTO lists Operator training, etc. 12/17/2015Jerry Annala | Muon Department meeting9

Where does it make sense to commission in stages? Beam to the AP-0 target (or M2/M3 line beam stop) –The AP-0 dump is scheduled to be complete in June –The RR extraction kicker is scheduled to be ready in June –M3 line construction to DR will be complete by June Allow circulating beam in the Delivery Ring. –The 30 straight section can be complete in March 28, 2017 –The tunnel portion of the shared M4/M5 line can be complete through the extraction enclosure by March 28, 2017 –The Accumulator magnets going into the M4 line can be removed from the DR enclosure by March 28, 2017 –The DR modifications can be done by ???? –Cable mitigation in the DR should be done by October 1, 2016 –Injection kicker power supply done by November 2015 Allow beam g-2 storage ring –The shield wall labyrinth at the M4 line split will need to be in place. 12/17/2015Jerry Annala | Muon Department meeting10

Actual schedule to prepare Even though some of the project work is not scheduled to be done until end of March 2017, I would like to shoot for all of the non-project work to be ready to run: –Beam to AP-0 target from RR by June 2016 –Beam through Transport into DR enclosure by February Check out all instrumentation in M2/M3 line all the way through Acnet programs –Beam to g-2 by April 1, /17/2015Jerry Annala | Muon Department meeting11

Preparing to meet proposed schedule By February 2016 –TLG modules playing (Stan) –Database entries complete through target (Stan) –References set to all devices up to target (Morgan) –Camac timers operational to all kickers (Stan) –Beam permit system in place (?) By May 2016 –Transport enclosure in final configuration (Leveling) –LOTO lists and interlocks completed through transport enclosure. (Morgan, Budlong) –M3 polarity checks, thermal scans, etc. complete (Morgan) –Instrumentation check outs complete (Drendel) –Permission to operate to the target (Leveling) 12/17/2015Jerry Annala | Muon Department meeting12

Installation issues Will all installation through Transport be complete by May 1, 2016 so that enclosure gates can be re-cored for check out? (Cons) Will target station be in shape to run beam to dump by June 1, 2016? (Still) Will software be ready in time for check out? –Utilities (Vander Meulen, Budlong) –Instrumentation (Drendel) –Tuning (Morgan) –Target Station monitoring (Still) We will address issues needed to run down the M3 line at a later time. This will get us moving. 12/17/2015Jerry Annala | Muon Department meeting13

12/17/2015Jerry Annala | Muon Department meeting14 Get your FTL done

12/17/2015Jerry Annala | Muon Department meeting15

12/17/2015Jerry Annala | Muon Department meeting16

Allocation of time toward operations next year Fraction of time allocated to operations Jerry Annala23% Jim Budlong32% Brian Drendel8% Tony Leveling35% Jim Morgan31% Vladimir Nagaslaev20% Al Sondgeroth80% Dean Still18% Dave Vander Meulen33% Steve Werkema27% 12/17/2015Jerry Annala | Muon Department meeting17

Non Project activities Controls –Application software –Database entries –Alarm lists –Datalogger lists Call in lists Reviews and approvals –ORC –SAAD –Shielding Assessment 12/17/2015Jerry Annala | Muon Department meeting18

Non Project activities Departmental Procedures Commissioning Plans and Documentation Labeling of hardware –Magnets –Power Supplies –Transformers –LOTO points –Etc. Interlock lists Lockout lists Other safety (getting chipmunks, gates, lock cores etc. back to normal configuration). 12/17/2015Jerry Annala | Muon Department meeting19

Non Project activities Timer (required hardware, triggers, settings, etc.) –Reference Drawings –Magnet circuits –Utility drawings Conventions –Polarity –Naming/numbering –Beam Accounting Cable mitigation 12/17/2015Jerry Annala | Muon Department meeting20