RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

Finance Report as at 31 st May 2014 Durham Dales, Easington and Sedgefield Clinical Commissioning Group 1.
Children and Families – Early Help and Prevention Children’s Centre Briefings Transition Arrangements October 2013.
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
 Financial summary; UK Common Fund K. Long, Friday, 24 th April 2009.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
UK Costs Beam & Infrastructure Coils Tracking Detector.
Project Managers Report Video Conference 172 Roy Preece 11 th December 2014.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
1 REPORT OF:Joanne Newton DATE OF PAPER:26 June 2013 SUBJECT:Financial Position at 31 st May 2013 IN CASE OF QUERY, PLEASE CONTACTJoanne Newton Joanne.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Executive Board Meeting Roy Preece 23rd May 2014
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
US Project Plan for MICE Mark Palmer Peter Garbincius, Alan Bross, Rich Krull Fermilab November 24, 2014.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Finance Roy Preece STFC RAL Oversight Committee Meeting 27 th November 2015.
MICE – UK Plan Roy Preece STFC RAL DOE Review of MAP Brookhaven National Laboratory 13 th August 2014.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
Tuesday 9 th January Project Status Report Project Achievements Project Schedule Issues Finance Summary Risk Register Photos.
PSAG mtg 20/03/2015 Finance Alan Grant. 2 PSAG mtg 20/03/2015 Finance Update FY14/15 – February Figures Additional capital funding in January of £63K.
PSAG mtg 3/2/2014 PSAG mtg Alan Grant. 2 PSAG mtg 3/2/ MICE Finances FY 2013/14.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
WP Managers mtg 20/01/2015 Finance mtg Alan Grant.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 16, 2015.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Reported by Ron Prwivo for Ian Robson. Overview Response to Recommendations from the RLSR of November 2014 – very good, RF staffing remains an issue Very.
Muon Ionisation Cooling Experiment Overview
Resource Loaded Schedule and Budget Profile
Status of the MICE Construction Project
UK Financial Plan & Risks
MICE CM31 Schedule summary
MICE Project in the US: Completion of Efforts
Renovation of the 45-year old PS magnets
Introduction Jason Tarrant – Integration Engineering Step IV Removal
13 NOVEMBER 2007 DEPARTMENT OF HEALTH AND SOCIAL DEVELOPMENT
Governing Body 13th June 2019 Buckinghamshire CCG 2019/20 Plan
Presentation transcript:

RLSR 16/4/2015 UK Financial Plan & Risks

Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 OsC 13/5/2015

Finance 3 OsC 13/5/2015

4 Late December STFC asked could we make use of additional funds….usual caveats applied  Receipts must be in and paid before end of financial yr  Intended for capital items required out of next yrs budget Amount available was not specified Shopping list was submitted Following list of components were approved out of additional funding Additional Funds

5 OsC 13/5/2015 Finance Update FY14/15 – End March Figures FINANCE were using our December outturn figures Capital project overspend of £55.8k Resource project underspend of £32k Overspend for FY14/15 is £23.83k…….1.03% Focus Coils contract receipted, negotiated a final payment of £10.5k……saving of £14.5k

6 OsC 13/5/2015 Allocation FY15/16 Capital allocation including staff cost £1,188K Resource allocation including staff costs £1,102k Total allocation including o’heads £2,290k PPD will provide a further 2.5 FTE in kind contribution…..not included in above Allocation excludes external income £60k Allocation excludes contingency £170k

Summary for Allocation Period Phase 2 Construction 7 Replaces Table 2 in the report

Final Step UK Cost to completion Construction complete – March 2017 Commissioning complete – May 2017 Data taking complete – March 2018 Analysis and paper submissions timescales and associated resource costs TBA beyond FY 2017/18 Includes 3FTE of ISIS support staff each FY + MICE staff contributing to ISIS teams (T Stanley, M Tucker, J Govans) Additional maintenance/service costs in 2016/17 in O&A wp Ramping down of staff and non staff costs FY2017/18 Mitigation costs predominantly  Additional Helium costs for magnet training runs  Additional shielding  RF crowbar switch & spares  Electrical spares for system failures 8

Final Step UK Cost to completion 9  Allocation approved to FY 15/16  Required allocation for phase 3 - FY 16/17, 17/18 & 18/19 £7m  Total UK spend for MICE £41,8m OsC 13/5/2015

Risk Final Step 10 OsC 13/5/2015

Top Level Risks 11 OsC 13/5/2015

Top Level Risks 12 OsC 13/5/2015

MICE Risks Summary 13 OsC 13/5/2015

Working Space 14 Additional Experimental area ~170m 2 Current R9 experimental area ~200m 2 Moving out of this area

Working Space 15 Activity in the R9 Laboratory space Area for storage of essential equipment moved from the current Didcot storage facility - £20k/year  To end of project Clean lab  To end of project Target operational space  To end of project Waveguide layout and assembly  6 months during 2015/16 Storage of magnets and Partial Return Yoke materials during de-commissioning of Step IV (North sections)  Removal - June 2016  Installation - January 2017 Receiving area for RF cavities and chambers  Delivery June 2016  Installation June/Sept 2016 – for off line testing with RF Receiving area for Final Step additional Partial Return Yoke sections  Delivery April 2016  Installation November 2016 – February 2017 Forklift parking area  To end of project OsC 13/5/2015

Working Space 16 OsC 13/5/ th to 11 th July there will be a open day for schools, VIP’s and the public. We hope to have two areas where MICE will be shown MICE Hall R9 – Focus coil On the main day for the public, Saturday 11 th an overview of the hall and the Focus Coil in R9 Problem – R9 re-configuration work has hit a snag of finding Asbestos on the floor so need to lift the floor surface in the whole lab space. Screens will be required to keep the storage and people separate The area will be tidied and screened to enable the Focus Coil and Zeus Tracker to be exhibited. Another pressure that is a request from BPG for storing switch gear equipment and associated kit in the R9 lab Need to gain more detail of size, mass, access needs, timescales….. Cleanup of the area to use it more efficiently is in the work plan We are still going to be squeezed for storage and working area.

Risk Summary 17 No Second hydrogen system No Hydrogen absorber in final step Operational risk reduced from Step IV experience. Both Focus Coils performance sufficient for ionisation demonstration Additional space in R9 agreed ……….. work is progressing although there are some asbestos problems in the floor which are being addressed. RF Power systems  Effort for build-up, testing and installation Longer commissioning times Changes in US budgets  Delivery of RF Cavities and Chambers late  PRY additional materials late RLSR 16/4/2014