S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.

Slides:



Advertisements
Similar presentations
Purpose Basis for performing the replacement bridge study Lack of modern safety provisions Does not meet current desirable navigation requirements Deteriorating.
Advertisements

Great Western Corridor Feasibility Study
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Environmental Impact Statement and Preliminary Engineering Public Scoping Meeting Tuesday, November 15, 2011,
Titusville to Edgewater Bike Loop PD&E Study
NEPA and Property Acquisition May 19, 2014 Elizabeth Patel Environmental Protection Specialist FTA Office of Planning and Environment.
Insert project map NOTICE OF PUBLIC INFORMATION MEETING Florida Department of Transportation Project History The Florida Department of Transportation (FDOT),
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
Northwest Florida Transportation Corridor Authority.
Proposed Replacement of the Herbert C. Bonner Bridge (Bridge No. 11) on NC 12 over Oregon Inlet TIP Project No. B-2500 Citizens Informational Workshops.
Environmental Assessment Public Meeting
Florida’s Future Transportation Corridors Florida’s Future Transportation Corridors Presented to: Florida Redevelopment Association Presented by: Bob Romig.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Kick Off Meeting City of Pensacola April 18, 2011.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
River to Sea TPO May 28, 2014 River to Sea TPO May 28, “I-4 BEYOND the ULTIMATE” PD&E REEVALUATION STUDY From west of US 27 to west of Kirkman Road.
Longmeadow Parkway Fox River Bridge Corridor
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
Future Transportation Projects within the Loxahatchee River Basin Florida Department of Transportation District IV 3400 W. Commercial Blvd W. Commercial.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Alternative Transportation in Parks and Public Lands Sanibel City Council Update (November 17, 2009)
I-4 ULTIMATE DESIGN PRESENTATION TO THE VOLUSIA TPO AUGUST 21, 2012 FDOT Contact: John Zielinski (407)
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Community Development Department Construction Phase.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
USA Parkway Project Welcome Public Information Meeting to the
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Project Briefing for BROOKS BRIDGE REPLACEMENT STUDY and SANTA ROSA SOUND ALTERNATE CROSSING STUDY April 2015 SPEAKER: BOB.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
Community Development Department Dimensional Variance In Connection with The Agreement to Convey Property – City Initiated Application # Palm.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
State Route 28/U.S. Highway Route 127 Improvements Project Fentress County, Tennessee Public Hearing March 15, 2011 South Fentress Elementary School 5018.
Visit Our Website at: Click to edit Master title style.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
 Connect the Coastside Presentation Half Moon Bay City Council Briefing March 15,
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
I-4 Express Lanes Project Development and Environment (PD&E) Study From east of 50 th Street to the Polk Parkway (SR 570) WPI Segment No: Polk.
Project Development and Environmental Study (PD&E) S.R. 30 (U.S.) 98 Gregory Street and Bayfront Parkway at 17 th Avenue Intersection Project Development.
Alternative Alignments Public Meeting
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Status & Right-of-Way Acquisition
U.S. 98 (State RoaD 30) Project Development & Environment (PD&E) Study
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
S.R. 30 (U.S. 98) Tyndall Parkway
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Parks Highway Reconstruction: Lucas Road to Big Lake Road
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C OUNTY, F LORIDA Financial Project ID No: , ETDM No: S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C OUNTY, F LORIDA Financial Project ID No: , ETDM No: TPO/TCC/CAC PRESENTATION | February 24, 2016

Introduce the project Outline the study objectives and schedule Share information about the project Receive input Purpose of Briefing 2

S.R. 30A / U.S. 98 / Panama City Beach Parkway From Mandy Lane to Thomas Drive Intersection Approximately 7.1 miles in length Bay County Panama City Beach Project Location 1

Add two lanes of capacity to the four lane section of U.S. 98 in order to address existing and projected future failing level-of-service –Certain roadway segments are currently over capacity Project is needed to relieve congestion Enhance safety and mobility –Improve emergency evacuation –Include sidewalks and bicycle lanes Purpose and Need 4

Roadway safety Intersection congestion Drainage and flooding Bicycle and pedestrian facility connectivity Right-of-way requirements and relocations Wetlands Wildlife and habitat Noise Utilities Access management Project Issues 5 Access Management Utilities & Noise

S.R. 30A / U.S. 98 / Panama City Beach Parkway: AADT for Year 2013 and 2035 Annual Average Daily Traffic (AADT) 6

Engineering – analyze data and identify solutions Environmental – evaluate potential impacts to the natural, social, and physical environments Public Involvement – ongoing throughout the process PD&E Study Components 7

Traffic counts Crash records Existing roadway conditions Identification of wetlands Threatened/Endangered species Existing land use & property information Census data Planned developments Existing drainage systems and patterns Contamination sites Archeological/Historical sites Engineering & Environmental Analysis 8

Public Involvement Plan Meetings with Agencies Local Government Coordination Meetings with the Public Project Website Public Involvement 9

Coordination Bay County TPO Bay County Engineering and Public Works Bay Town Trolley Panama City Beach Florida Department of Environmental Protection Florida Division of Historical Resources Northwest Florida Water Management District U.S. Fish and Wildlife Service Federal Highway Administration Agency Coordination 9

Study Schedule and Funding 13 Begin Study: December 18, 2015 Receive Location Design Concept Approval (LDCA) from FHWA (study completion): December 2017 Project Initiation Kick-off Meeting Environmental & Engineering Analysis Alternatives Public Workshop Draft Environmental & Engineering Documents Public Hearing Final Environmental & Engineering Documents Location Design and Concept Approval Environmental & Engineering Data Collection Future phases include: - Design - Right-of-Way - Construction Winter Spring Summer Winter Fall Spring Summer

Date: April 21, 2016 Location: Panama City Beach Lyndell Senior Center 423 Lyndell Lane Panama City Beach, FL Time: 5:30 p.m. – 6:30 p.m. Public Kick-Off Meeting 14

Contact Information 16,P.E. FDOT Project Manager Sherry Alaghemand, P.E. FDOT, District 3 (888) , extension FDOT Public Information Director Ian Satter FDOT, District 3 (888) , extension 1205